• 제목/요약/키워드: 3D bridge model

검색결과 202건 처리시간 0.023초

3차원 교량모델에서의 상태평가정보 가시화를 위한 요구사항 분석 (Requirement analysis for visualization of condition assessment in 3D Bridge Model)

  • 황명강;김봉근;이상호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2010년도 정기 학술대회
    • /
    • pp.238-241
    • /
    • 2010
  • This paper proposed an approach to integrate bridge condition assessment related information with a 3D bridge model to visualize bridge condition assessment information in the 3D bridge model. In this approach, bridge information model plays a centric role in the data access and realizes the integration of bridge initial design and historical bridge maintenance records. Behind the bridge information model is a rational database. After the system requirements for this approach, several IFC data model extensions are suggested.

  • PDF

사업기획단계에서의 현수교의 물량추정을 위한 모델연구 (Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage)

  • 박원태;천경식
    • 복합신소재구조학회 논문집
    • /
    • 제6권4호
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링 (Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library)

  • 조제헌;김동욱;이광명;남상혁
    • 한국BIM학회 논문집
    • /
    • 제3권4호
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.

3차원 정보 모델을 활용한 PSC 교량의 시공성 향상 방안 연구 (A Study on Improving Constructability of PSC Bridge Using 3D Information Model)

  • 이윤범;이광명;한송이;박나연;박경래
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2010년도 춘계 학술대회 제22권1호
    • /
    • pp.461-462
    • /
    • 2010
  • 본 연구는 PSC 교량 구조물의 시공단계에 3차원 정보 모델을 적용하고 이를 활용함으로써 효율성을 검증하였다. 3차원 정보 모델을 정의하기 위하여 PSC 교량 구조물의 특성을 분석하여 정보 모델 체계를 정립하였다.

  • PDF

3D 그래픽 모델을 활용한 교량 시설물 유지관리 시스템 (Application of a 3D Graphic Model for Bridge Maintenance)

  • 문성우;김상도;박미경
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.64-71
    • /
    • 2011
  • 건설공사의 규모가 대형화, 복합화 되어감에 따라서 유지관리의 중요성이 더욱 커지고 있다. 유지관리의 효과를 높이기 위해서는 유지관리단계의 정보뿐만 아니라 설계 시공단계에서 생성된 정보를 신속하게 조회하고 활용할 수 있어야 한다. 본 논문에서는 3D 그래픽 모델을 활용한 교량 구조물 유지관리 정보 시스템을 제시한다. 3D 환경의 유지관리 정보 시스템은 시설물 부재의 속성정보를 저장하고, 이와 관련하여 데이터베이스에 저장되어 있는 데이터를 추출함으로써 필요한 자료를 신속하게 조회할 수 있다. 연구의 목적을 달성하기 위해서 캐드와 웹 환경으로 구성된 프로토타입을 개발했다. 개발된 프로토타입을 적용하여 테스트한 결과 유지관리자는 웹 환경에서 사무실과 현장에서 필요한 데이터를 찾을 수 있으며, 작업 시 실시간으로 데이터를 활용하여 유지관리의 시간을 단축하고, 의사결정의 정확성을 높일 수 있는 것으로 나타났다.

3차원 교량정보 모델링에 따른 IFC 기반 트러스교 구조해석정보 자동생성 모듈 (Automatic Generation Module of IFC-based Structural Analysis Information Model Through 3-D Bridge Information Modeling)

  • 이진훈;김효진;이상호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.809-812
    • /
    • 2007
  • Automatic generation method of structural analysis model data for a truss bridge is presented through 3-D bridge information modeling based on Industry Foundation Classes(IFC). The mapping schema is proposed between a steel bridge information model based on STEP and a truss bridge information model based on the IFC. The geometry information from mapping is presented by IFC model, and SAP 2000 that can import the IFC file performs the structural analysis. Numerical analysis for a truss bridge is performed in this paper.

  • PDF

Precision of predicted 3D numerical solutions of vortex-induced oscillation for bridge girders with span-wise varying geometry

  • Harada, Takehiko;Yoshimura, Takeshi;Tanaka, Takahisa;Mizuta, Yoji;Hashiguchi, Takafumi;Sudo, Makoto;Miyazaki, Masao
    • Wind and Structures
    • /
    • 제7권1호
    • /
    • pp.13-28
    • /
    • 2004
  • A method of numerical analysis without conducting 3D wind tunnel model tests was examined in our previous study for predicting vortex-induced oscillation of bridge girders with span-wise varying geometry. The aerodynamic damping forces measured for plural wind tunnel 2D models were used in the analysis. A further study was conducted to examine the precision of solution obtained by this method. First, the responses of vortex-induced oscillation of two rocking models and a taut-strip bridge girder model with span-wise varying geometry were measured. Next, the responses of these models were numerically analyzed by means of this method, and then a comparison was made between the obtained $Vr-A-{\delta}_a$ contour diagram of each 3D model in the wind tunnel test and the diagram in the numerical analysis. Since close correlations were observed between each two $Vr-A-{\delta}_a$diagrams obtained in the model test and in the analysis in cases where the 3D model did not have strong three-dimensionality, our findings revealed that the predicted solution proved to be reasonably accurate.

ACIS 솔리드 모델러를 이용한 STEP기반의 강교량정보 운용체계 (STEP-based Information Management of Steel Bridge Using ACIS Soild Modeler)

  • 이상호;정연석;김소운
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2004년도 가을 학술발표회 논문집
    • /
    • pp.371-376
    • /
    • 2004
  • This study presents a way to generate and manage engineering information by applying steel bridge information model with 3D shape to existing application program. ACIS solid modeling kernel is used to visualize 3D geometric shape of steel bridge on the AutoCAD program. The shape information of 3D solid model can be connected to structural design information of steel bridge by an application module based on information model. The application module for manipulating steel bridge information can be easily developed by ObjectARX programming library supporting functional expansion of AutoCAD program. End-users can use the application module without any additional environmental setup on the AutoCAD. Thus this study facilitates information management of steel bridge by using ACIS solid modeler and ISO/STEP methodology.

  • PDF

BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발 (BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge)

  • 천경식;박원태
    • 한국산학기술학회논문지
    • /
    • 제16권10호
    • /
    • pp.7204-7210
    • /
    • 2015
  • 본 연구는 2주탑 3경간 사장교의 사업기획 단계에서 3차원 모델정보에 기반하여 신속한 개략 공사비 및 물량 산정을 지원하는 시스템을 개발하였다. 우선, 기 설계된 사장교 설계정보(구조계산서, 도면, 수량)를 분석하여 설계변수를 도출하였다. 도출된 설계변수를 기반으로 매개변수적으로 사장교를 3차원 모델링하는 BIM Wizard를 개발하였다. BIM Wizard를 이용해 작성된 3차원 모델로부터 사장교의 주요 재료에 대한 수량을 직접 산출하며, 케이블 교량에 대한 단가 D/B와 산출된 수량을 연계하여 개략공사비를 산정할 수 있다. 결과적으로, 사업 초기단계에서 m당 혹은 $m^2$당 실적 평균공사비를 산출하는 재래적인 방식보다 더 구체화된 공사비를 산출할 수 있는 시스템을 구축하였다. 이로써, 우리는 사장교에 대해 입찰단계에서 가능한 신속하게 다양한 대안을 검토할 수 있을 것이다.

3차원 모델 기반의 미적 교각 설계 및 시공 기술 개발 (Development of Creative Design and Construction Methods of Bridge Piers using 3D Model)

  • 이상용;당고손;심창수
    • 한국BIM학회 논문집
    • /
    • 제5권2호
    • /
    • pp.12-18
    • /
    • 2015
  • Bridge piers typically have circular or rectangular shapes without decorative design. Prefabrication for accelerated construction has been widely adopted in bridge structures. Cost for steel formwork is a main restriction of creative irregular shapes. 3D modelling techniques allow creative design of columns and 3D printing provides possibility to minimize the fabrication cost. In this paper, 3D design process of bridge piers was suggested by converting 2D picture into 3D decorative shape. Formwork design using 3D printed panels was also proposed and mock-up tests were conducted. Precast columns need accurate geometry control from fabrication to assembly. Laser scanning and geometry control devices were adopted. Through the digitalized process of design, fabrication and assembly, creative design of structures can be realized in reasonable cost range.