• 제목/요약/키워드: 3D Building model

검색결과 697건 처리시간 0.027초

APPLICATION OF VISUALLISP PROGRAMMING LANGUAGE TO 3D SLUICE MODELING

  • Nguyen Thi Lan Truc;Po-Han Chen
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.337-345
    • /
    • 2007
  • Nowadays, it is convenient to use 3D modeling tools for general planning before construction. Normally, a 3D model is built with 3D CAD such as 3D Studio Max, Maya, etc. or simply with AutoCAD. All these software packages are effective in building 3D models but difficult to use, because many provided functions and tools require prior knowledge to build both 2D and 3D designs. Moreover, the traditional method of building 3D models is most time-consuming as experienced operators and manual input are required. Therefore, how to minimize the building time of 3D models and provide easy-to-use functions for users who are not familiar with 3D modeling becomes important. In this paper, the VisualLISP programming language is used to create a convenient tool for efficient generation of 3D components for the AutoCAD environment. This tool will be demonstrated with the generation of a 3D sluice, an artificial passage for water fitted with a valve or gate to stop or regulate water flow. With the tool, users only need to enter the parameters of a sluice in the edit box and the 3D model will be automatically generated in a few seconds. By changing parameters in the edit box and pressing the "OK" button, a new 3D sluice model will be generated in a short while.

  • PDF

IFC 3차원 건축모델표준과 ISO/STEP AP202도면표준의 2차원 형상정보 연계방안 (Harmonization of IFC 3D Building Model Standards and ISO/STEP AP202 Drawing Standards for 2D Shape Data Representation)

  • 원지선;임경일;김성식
    • 한국CDE학회논문집
    • /
    • 제11권6호
    • /
    • pp.429-439
    • /
    • 2006
  • The purpose of this study is to support the integration from current 2D drawing-based design to future 3D model-based design. In this paper, an important theme is the combination between the STEP-based 2D drawing standards (i.e., AP202) and the IFC-based 3D building model standards. To achieve the purpose, two methodologies are proposed as follows: the development of IFC extension model for the 2D shape data representation by harmonizing ISO/STEP AP202; and the development of mapping solution between IFC 2D extension model and KOSDIC by constructing the exchange scenario for 2D shape data representation. It is expected that the proposed IFC2X2 2D extension model and mapping solution will offer the basis of development of the integrated standards model in AEC industry.

비정형 건축물의 외장 패널의 선제작과 시공을 위한 역설계 프로세스와 사례 분석을 통한 시사점 도출 (Implications Deduction through Analysis of Reverse Engineering Process and Case Study for Prefabrication and Construction of Freeform Envelop Panels)

  • 류한국;김성진
    • 한국건축시공학회지
    • /
    • 제16권6호
    • /
    • pp.579-585
    • /
    • 2016
  • 3차원 이미지 스캐닝 기술은 복잡한 비정형 건축물의 외피의 정확한 형상과 위치 데이터를 확보하는데 효과적이다. 3차원 이미지 스캐닝 기술의 세부 과정인 점 군집화, 메쉬표면 분리, 넙스 표면 생성, 파라메트릭 솔리드 모델을 통하여 비정형 건축물의 형상을 구축할 수 있다. 이에 본 연구는 비정형 건축물의 외장재 제작과 시공을 위한 3차원 이미지 스캐닝에 의한 역설계 프로세스와 사례 분석을 통하여 시사점을 도출한다. 본 연구의 결과는 역설계 기술을 사용한 3차원 형상 기술과 설계 요소화 방법을 다양한 건설 프로젝트에 활용할 수 있을 것으로 판단된다.

항공 LiDAR 데이터를 이용한 3차원 건물모델링 (3D Building Modeling Using Aerial LiDAR Data)

  • 조홍범;조우석;박준구;송낙현
    • 대한원격탐사학회지
    • /
    • 제24권2호
    • /
    • pp.141-152
    • /
    • 2008
  • 건물의 3차원 모델링은 3차원 공간정보를 구축하는데 있어서 매우 중요한 요소이다. 기존의 3차원 건물 모델링은 대부분 항공사진측량기술을 이용하여 수동으로 진행되어 많은 시간과 비용이 소요된다. 이러한 한계를 극복하기 위한 방안으로 최근에는 항공라이다(LiDAR) 데이터를 이용한 건물모델링 방법에 대한 많은 연구가 활발히 진행되고 있다. 항공라이다 데이터를 이용한 대부분의 3차원 건물모델링 연구는 보간과정을 통하여 격자구조로 변환하거나 수치지도 또는 항공영상 등의 이종 데이터간의 융합을 통하여 건물을 모델링하는 방안 등을 제시하였다. 본 논문에서는 점 데이터의 격자구조로의 변환 및 이종 데이터간의 융합 등의 방법을 배제하고 항공라이다 데이터만을 이용한 건물의 자동 모델링 방법을 제안하였다. 건물로 분류된 항공라이다 데이터를 옥트리 분할을 기반으로 3차원 공간상에서 재귀적으로 분할하여 패치(patch)를 구성하고, 동일한 속성을 갖는 패치들을 병합하여 건물의 구성요소를 추출한다. 추출되어진 건물의 구성요소를 대표하는 모델을 생성하여 전체적인 건물의 3차원 모델을 구성한다. 항공라이다 데이터를 이용하여 제안된 방법으로 실험한 결과, 다양한 형태의 건물 모델을 자동으로 구성할 수 있었다.

Automated 3D Model Reconstruction of Disaster Site Using Aerial Imagery Acquired By Drones

  • Kim, Changyoon;Moon, Hyounseok;Lee, Woosik
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.671-672
    • /
    • 2015
  • Due to harsh conditions of disaster areas, understanding of current feature of collapsed buildings, terrain, and other infrastructures is critical issue for disaster managers. However, because of difficulties in acquiring the geographical information of the disaster site such as large disaster site and limited capability of rescue workers, comprehensive site investigation of current location of survivors buried under the remains of the building is not an easy task for disaster managers. To overcome these circumstances of disaster site, this study makes use of an unmanned aerial vehicle, commonly known as a drone to effectively acquire current image data from the large disaster areas. The framework of 3D model reconstruction of disaster site using aerial imagery acquired by drones was also presented. The proposed methodology is expected to assist rescue workers and disaster managers in achieving a rapid and accurate identification of survivors under the collapsed building.

  • PDF

BIM Model 기반 철근 수량산출 시 고려사항 (Considerations When Quantity Take-Off of Rebar Based on the BIM Model)

  • 정서희;김주용;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.73-74
    • /
    • 2023
  • The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.

  • PDF

포인트 클라우드 데이터 기반 군집형 솔리드 건물 모델 자동 생성 기법 (Automatic Generation of Clustered Solid Building Models Based on Point Cloud)

  • 김한결;황윤혁;이수암
    • 대한원격탐사학회지
    • /
    • 제36권6_1호
    • /
    • pp.1349-1365
    • /
    • 2020
  • 최근 스마트 시티, 디지털 트윈 등에 실제 3차원 좌표를 취득할 수 있는 이점에 따라 포인트 클라우드를 이용한 모델 생성에 관한 연구가 늘어나고 있으며, 건물 형상 및 텍스처의 수정이 용이한 솔리드 모델에 대한 요구가 늘어나고 있다. 이에 따라 본 논문에서는 포인트 클라우드 데이터를 기반으로 군집형 솔리드 건물 모델을 생성하는 방법을 제안한다. 제안하는 방법은 총 다섯단계로 구성된다. 첫 단계에서는 포인트 클라우드의 평면성 분석을 통해 지면을 제거하였다. 두 번째 단계에서는 지면이 제거된 포인트 클라우드에서 건물 영역을 추출하였다. 세 번째 단계에서는 건물의 세부 구조물 영역을 추출하였다. 네 번째 단계에서는 추출된 영역에 3차원 좌표정보가 부여된 3차원 건물 모델의 형상을 생성하였다. 마지막 단계에서는 건물 모델 형상에 텍스처를 부여하여 3차원 건물 솔리드 모델을 생성하였다. 제안하는 방법의 검증을 위하여 상용 소프트웨어를 이용해 무인항공기 영상으로부터 포인트 클라우드를 추출하여 실험하였다. 그 결과, 포인트 클라우드 내에 존재하는 일정 높이 이상의 모든 건물에 대하여 포인트 클라우드 대비 위치오차 1 m 내외의 3차원 건물 형상을 생성하고, 원본 영상 해상도 대비 2배 이내의 해상도를 갖는 텍스처링이 수행된 3차원 모델이 생성되는 것을 확인하였다.

GIS를 이용한 3차원정보지적도 모형 구축에 관한 연구 (Construction of 3D Information Cadastral Map Model Using GIS)

  • 오이균;양인태;유영걸;천기선
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 춘계학술발표회논문집
    • /
    • pp.577-580
    • /
    • 2004
  • Recently, in a field of cadastre, a computerization of cadastral map is in progress with great growth of GIS field. Also, the needs for the integration of land and building information are widely increasing for integral-management and its application of various land related information. In this study, it is constructed a 3D information cadastral map model that can make the integral management of land, building, connecting land recorders, building management ledgers, building titles, building pictures, and related attribute information.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석 (Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame)

  • 김광희
    • 한국건축시공학회지
    • /
    • 제23권5호
    • /
    • pp.651-662
    • /
    • 2023
  • 최근에 BIM을 여러 건설관리 활동에 활용하는 연구가 활발히 진행되고 있으며, 3D모델 기반 견적은 3D모델의 속성 정보를 사용하여 자동으로 수행할 수 있다는 장점이 있어 이에 대한 관심이 증대되고 있다. 따라서 본 연구에서 한 건축물을 2D 도면 기반으로 수량을 산출하는 소프트웨어와 Revit 소프트웨어로 생성된 3D 모델에서 추출한 수량의 차이를 비교하고 그 원인을 알아보고자 하였다. 두 가지 방법의 산출한 수량의 차이는 거푸집이 가장 크고, 다음으로 철근과 콘크리트 수량 순으로 작았다. 이러한 차이가 발생하는 이유는 3D모델에서 수량 추출이 수량산출기준에 적합하지 않은 부분이 있고, 특히 거푸집의 경우 필요한 부분의 수량만 분리해 내는데 어려움이 있었다. 또한 철근수량은 부재별로 분리가 되지 않아 정확한 수량 비교와 차이 원인을 밝히는 것이 불가능하였다. 따라서 3D모델에서 수량산출에 필요한 수치정보만 가져오고 별도의 계산식을 적용하는 응용소프트웨어를 사용하는 것이 가장 합리적일 것으로 사료된다.