• 제목/요약/키워드: 3-phase Transformer

검색결과 310건 처리시간 0.03초

3상 3.3kV/220V 6kVA 모듈형 반도체 변압기의 프로토타입 개발 (Prototype Development of 3-Phase 3.3kV/220V 6kVA Modular Semiconductor Transformer)

  • 김재혁;김도현;이병권;한병문;이준영;최남섭
    • 전기학회논문지
    • /
    • 제62권12호
    • /
    • pp.1678-1687
    • /
    • 2013
  • This paper describes a prototype of 3-phase 3.3kV/220V 6kVA modular semiconductor transformer developed in the lab for feasibility study. The developed prototype is composed of three single-phase units coupled in Y-connection. Each single-phase unit with a rating of 1.9kV/127V 2kVA consists of a high-voltage high-frequency resonant AC-DC converter, a low-voltage hybrid-switching DC-DC converter, and a low-voltage hybrid-switching DC-AC converter. Also each single-phase unit has two DSP controllers to control converter operation and to acquire monitoring data. Monitoring system was developed based on LabView by using CAN communication link between the DSP controller and PC. Through various experimental analyses it was verified that the prototype operates with proper performance under normal and sag condition. The system efficiency can be improved by adopting optimal design and replacing the IGBT switch with the SiC MOSFET switch. The developed prototype confirms a possibility to build a commercial high-voltage high-power semiconductor transformer by increasing the number of series-connected converter modules in high-voltage side and improving the performance of switching element.

넓은 범위의 비오차를 갖는 전압변성기를 이용한 계기용 변성기 비교 측정 장치의 비오차 직선성 평가기술 (Evaluation Technique for Linearity of Ratio Error of Instrument Transformer Comparator Using Voltage Transformer with Wide Range of Error Ratios)

  • 정재갑;권성원;김한준;박영태;김명수
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제54권2호
    • /
    • pp.66-70
    • /
    • 2005
  • Linearity of ratio error of instrument transformer comparator has been tested using wide ratio error voltage transformer(VT) with the ratio errors in the range of -3 % to 3 %. The technique is the method for evaluation of the linearity for instrument transformer comparator by comparing both the theoretical and experimental values in wide ratio error VT. The developed method has been successfully applied for calibration and correction in instrument transformer comparator belonging to industry.

An Isolated Bidirectional Modular Multilevel DC/DC Converter for Power Electronic Transformer Applications

  • Wang, Zhaohui;Zhang, Junming;Sheng, Kuang
    • Journal of Power Electronics
    • /
    • 제16권3호
    • /
    • pp.861-871
    • /
    • 2016
  • With high penetration of renewable energies, power electronic transformers (PETs) will be one of the most important infrastructures in the future power delivery and management system. In this study, an isolated bidirectional modular multilevel DC/DC converter is proposed for PET applications. A modular multilevel structure is adopted as switching valves to sustain medium voltages to achieve modular design and high reliability. Only one high-frequency transformer is used in the proposed converter, which significantly simplifies the circuit and galvanic insulation design. A dual-phase-shift modulation strategy is proposed to regulate the output power and achieve a simple voltage balancing control. A down-scaled (2 kW/20 kHz) prototype is constructed to demonstrate the proposed converter and verify the control strategy. The experimental results comply with the theoretical analysis well, with the highest power efficiency reaching 97.6%.

Three-phase Transformer Model and Parameter Estimation for ATP

  • Cho Sung-Don
    • Journal of Electrical Engineering and Technology
    • /
    • 제1권3호
    • /
    • pp.302-307
    • /
    • 2006
  • The purpose of this paper is to develop an improved three-phase transformer model for ATP and parameter estimation methods that can efficiently utilize the limited available information such as factory test reports. In this paper, improved topologically-correct duality-based models are developed for three-phase autotransformers having shell-form cores. The problem in the implementation of detailed models is the lack of complete and reliable data. Therefore, parameter estimation methods are developed to determine the parameters of a given model in cases where available information is incomplete. The transformer nameplate data is required and relative physical dimensions of the core are estimated. The models include a separate representation of each segment of the core, including hysteresis of the core, ${\lambda}-i$ saturation characteristic and core loss.

Series Compensated Step-down AC Voltage Regulator using AC Chopper with Transformer

  • Ryoo, H.J.;Kim, J.S.;Rim, G.H.
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • 제5B권3호
    • /
    • pp.277-282
    • /
    • 2005
  • This paper describes a step-down AC voltage regulator using an AC chopper and auxiliary transformer, which is a series connected to the main input. The detail design of the AC regulator, logic and PWM pattern of the AC chopper is described and the three-phase AC regulator using two single­phase AC choppers with a three transformer configuration is proposed for three-phase application. The proposed three-phase system has the advantages of lower system cost due to reduced switch number and gate driver circuit as well as advantages of decreased size and weight because it uses a series compensated scheme. The proposed AC regulator has many benefits such as fast voltage control, high efficiency and simple control logic. Experimental results indicate that it can be used as a step-down AC voltage regulator for power saving purposes very efficiently.

외부부담이 전압변성기의 비오차와 위상각오차에 미치는 영향에 대한 연구 (A Study on Ratio Error and Phase Angle Error Caused by an External Burden in Voltage Transformer)

  • 정재갑;권성원;김규태;김명수
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제53권3호
    • /
    • pp.137-142
    • /
    • 2004
  • A voltage transformer(VT) used for the estabilishment of high voltage national standard, has generally ratio error and phase angle error. Both errors in VT depend critically on values of external burden of VT used. Both ratio ewer and phase angle error in existence of the external burden is calculated. These calculated values are very well consistent with the experimental result. The principle and the measurement method of VT in our institute are also explained.

고전압 전기용량 브리지를 이용한 전압변성기의 비오차와 위상각 오차의 측정과 불확도 분석 (Measurement of Ratio Error/Phase Angle Error of Potential Transformer using High Voltage Capacitance Bridge and Uncertainty Analysis)

  • 권성원;이상화;김명수;정재갑
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제55권3호
    • /
    • pp.134-141
    • /
    • 2006
  • A potential transformer(PT) has ratio error and phase angle error. Precise measurement of the errors of PT can be achieved using high voltage capacitance bridge, high voltage capacitor and low voltage capacitor. The uncertainty for this method is evaluated and found to be $20{\times}10^{-6}$ in both ratio error and phase angle error. The values measured for PT using the method are well consistent with the those measured for same PT in NMIA(National Measurement Institute of Australia) within the corresponding uncertainty.

정전압 출력 특성을 갖는 다기능 3상 전자식 강압형 변압기 (A Multifunctional Three-Phase Electronic Step-Down Transformer with Constant Output Voltage Characteristics)

  • 최남섭
    • 한국정보통신학회논문지
    • /
    • 제5권2호
    • /
    • pp.309-313
    • /
    • 2001
  • 본 논문에서는 Custom Power 응용을 위한 전압 안정화 특성을 갖는 다기능 3상 전자식 강압형 변압기가 제안된다. 제안된 전자식 변압기는 다음과 같은 특징을 갖는다. 1) 무게가 1㎾ 기준 일반 변압기의 40% 수준이다. 2) PWM 제어에 의하여 입력전압의 변동에 무관한 출력전압을 유지하는 전압 안정화 기능을 갖는다 3) 전원 또는 부하단의 Emergency에 대하여 회로 차단기의 기능도 갖는다. 4) 부하에 최초 전원 공급시, 낮은 전압으로부터 점진적으로 증가시켜가면서 전원을 인가하여, 전원 투입시 발생할 수 있는 돌입전류나 과도 충격을 제거할 수 있다. 그 밖에 무부하시 전원차단 기능과, 왜곡된 입력전압에 대한 보상기능을 추가 할 수 있다. 본 논문에서는 제안된 강압형 전자식 변압기의 회로 구성과 특징을 설명하고, 이를 PSPICE 시뮬레이션을 통하여 동작특성을 보인다.

  • PDF

3상 절연형 변압기를 이용한 다중레벨 (Multi-level Inverter Using 3-Phase isolated Transformers)

  • 이화춘;송성근;박성준;김광헌
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.1134-1135
    • /
    • 2007
  • In this paper, we proposed the isolated multi-level inverter using 3-phase transformers. It makes possible to use a single DC power source due to employing low frequency transformers. In this inverter, the number of transformer could be reduced comparing with an exiting 3-phase multi-level inverter using single phase transformer. Also, using phase angle control method with switching frequency equal to output fundamental frequency, harmonics component of output voltage and switching losses can be reduced. Finally, we made a prototype inverter to clarify the proposed electric circuit and reasonableness of control signal.

  • PDF

3상 22.9/3.3kV 유입변압기의 소손패턴 해석 및 발화원인 판정에 관한 연구 (Study on the Damage Pattern Analysis of a 3 Phase 22.9/3.3kV Oil Immersed Transformer and Judgment of the Cause of Its Ignition)

  • 최충석
    • 전기학회논문지
    • /
    • 제60권6호
    • /
    • pp.1274-1279
    • /
    • 2011
  • The purpose of this paper is to present the manufacturing defect and damage pattern of a 3 phase 22.9/3.3kV oil immersed transformer, as well as to present an objective basis for the prevention of a similar accident and to secure data for the settlement of PL related disputes. It was found that in order to prevent the occurrence of accidents to transformers, insulating oil analysis, thermal image measurement, and corona discharge diagnosis, etc., were performed by establishing relevant regulation. The result of analysis performed on the external appearance of a transformer to which an accident occurred, the internal insulation resistance and protection system, etc., showed that most of the analysis items were judged to be acceptable. However, it was found that the insulation characteristics between the primary winding and the enclosure, those between the ground and the secondary winding, and those between the primary and secondary windings were inappropriate due to an insulating oil leak caused by damage to the pressure relief valve. From the analysis of the acidity values measured over the past 5 years, it is thought that an increase in carbon dioxide (CO2) caused an increase in the temperature inside the transformer and the increase in the ethylene gas increased the possibility of ignition. Even though 17 years have passed since the transformer was installed, it was found that the system's design, manufacture, maintenance and management have been performed well and the insulating paper was in good condition, and that there was no trace of public access or vandalism. However, in the case of transformers to which accidents have occurred, a melted area between the upper and the intermediate bobbins of the W-phase secondary winding as well as between its intermediate and lower bobbins. It can be seen that a V-pattern was formed at the carbonized area of the transformer and that the depth of the carbonization is deeper at the upper side than the lower side. In addition, it was found that physical bending and deformation occurred inside the secondary winding due to non-uniform pressure while performing transformer winding work. Therefore, since it is obvious that the accident occurred due to a manufacturing defect (winding work defect), it is thought that the manufacturer of the transformer is responsible for the accident and that it is lawful for the manufacture to investigate and prove the concrete cause of the accident according to the Product Liability Law (PLL).