• Title/Summary/Keyword: 3차원 지하구조물

Search Result 84, Processing Time 0.027 seconds

A Study on the Development of an Automated Inspection Program for 3D Models of Underground Structures (지하구조물 3차원 모델 자동검수 프로그램 개발에 관한 연구)

  • Kim, Sung Su;Han, Kyu Won
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.5
    • /
    • pp.413-419
    • /
    • 2022
  • As the development of the underground space becomes active, safety accidents related to the underground are frequently occurring in recent years. In this regard, the Ministry of Land, Infrastructure and Transport is enforcing the 『Special Act on Underground Safety Management』 (enforced on January 1, 2018, hereafter referred to as the Underground Safety Act). Among the core contents of the Underground Safety Act, underground facilities(water supply, sewage, gas, power, communication, heating) buried underground, underground structures(subway, underpass, underpass, underground parking lot, underground shopping mall, common area), ground (Drilling, wells, geology) of 15 types of underground information can be checked at a glance on a three-dimensional basis by constructing an integrated underground spatial map and using it. The purpose of this study is to develop a program that can quickly inspect the three-dimensional model after creating a three-dimensional underground structure data among the underground spatial integration maps. To this end, we first investigated and reviewed the domestic and foreign status of technology that generates and automatically inspects 3D underground structure data. A quality inspection program was developed. Through this study, it is judged that it will be meaningful as a basic research for improving the quality of underground structures on the integrated map of underground space by automating more than 98% of the 3D model inspection process, which is currently being conducted manually.

Development of Drawing Processing Tool Program and Establishment Strategy of 3D Underground Structures based on Standardized Drawings (표준도 기반의 3차원 지하구조물 구축 방안 및 도면가공 툴 프로그램 개발)

  • LEE, Min-Kyu;HAN, Sang-Hoon;KIM, Sung-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.1-25
    • /
    • 2021
  • In order to respond and prevent underground safety accidents, the Korean government has been preparing a submitting completion drawing web system project for converting the current manual-based 3D Underground Geospatial Map construction and its update system to an automation-based 3D underground information construction. However, research on standard drawings required for the automatic update of 3D underground structures is insufficient, so detailed research is needed. In this research paper, a standard map-based 3D underground structure construction plan was presented for the six types of underground structures constituting the 3D Underground Geospatial Map, enabling rapid and accurate drawing data creation and systematically 3D underground structure drawing data could be managed. In addition, we developed a 3D construction drawing tool that can be used in underground information practice so that ordinary CAD program users can easily produce processing drawings. The results derived from this paper are expected to be major reference materials for the establishment of standard frameworks and practical application guidelines for the construction of 3D underground structures in the future.

경계요소법에 의한 대규모 3차원 지하구조물의 동적해석

  • 한국전산구조공학회
    • Computational Structural Engineering
    • /
    • v.8 no.3
    • /
    • pp.11-21
    • /
    • 1995
  • 3차원 대규모 지하구조물의 동적응답을 결정하기 위한 일반적인 수치해석이 제안되었다. 지반과 구조물을 해석하기 위하여 Laplace 변환을 적용한 경계요소법을 설명하였고, 지반-구조물계에 작용하는 외부 동적하중과 지진파를 고려할 수 있도록 공식화하였다. 동적교란이 전파되는 경우에 시간영역의 응답을 얻기 위하여는 구해진 변화된 해를 수치적인 Laplce 역변환을 수행하여야 하지만 동적교란이 조화적인 경우에는 응답이 주파수 영역으로부터 직접 얻어지며, 역변환이 필요하지 않다. 이 방법의 특징은 높은 정확도와 효율성이며, 지반-구조물계에 대하여 초기조건 및 점탄성 재료의 거동을 쉽게 고려할 수 있다는 것이다. 그러므로 이 방법은 다양한 지하구조물의 동적거동과 지진에 대한 취약함을 연구하기 위한 적절한 도구로 사용되어 질 수 있다.

  • PDF

Development of an Automatic Updated System for Underground Structures (지하구조물 자동갱신 시스템 개발)

  • LEE, Min-Kyu;HAN, Sang-Hoon;KIM, Sung-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.4
    • /
    • pp.82-98
    • /
    • 2021
  • In recent years, as the number of ground subsidence has increased nationwide, the latest and usefulness of underground information for underground space development and underground safety management has become more important than ever. However, the 3D Underground Geospatial Map project, which started in 2015, has a problem with the manual-based long-term update system. This research paper overcomes these limitations and automatically updates the 3D CAD/GIS-based integrated management of underground structures that can be managed automatically from a full-cycle perspective of underground structure data management such as processing, transformation, updating, management, and visualization of 2D/3D underground structure data. If this technology is applied, it is possible to integrate processing and update management of the existing complex 3D construction logic of underground structures in one system, and it is expected that it can be used for underground space development and underground safety management as a foundation technology for automatic update of underground structures data.

The Probing of Underground Structures Using Ground Penetrating Radar (지하 탐사용 레이더를 이용한 매설된 구조물의 탐사)

  • Kim, D.H.;Cho, P.D.
    • Electronics and Telecommunications Trends
    • /
    • v.15 no.5 s.65
    • /
    • pp.86-93
    • /
    • 2000
  • 지하 탐사용 레이더를 이용하여 지하에 매설된 구조물의 위치를 파악하고 그에 따른 근사 이미지의 추출 방법을 제안하였다. 기본원리는 구조물에 의해 산란되어 수신 안테나로 유입되는 펄스신호의 지연시간과 크기를 측정하는 데 있으며, 측정의 실용성을 위하여 레이더 탐색경로에 따른 수신신호의 절대치 적분 방법을 사용하였다. 일반적으로 지하매질은 침투 주파수에 따라서 다양한 분산 및 손실 특성을 나타내는데, 이러한 매질 특성은 다항 Debye 모델을 이용하여 기술되었다. 3차원 전파(電波) 전파(傳播)를 위한 시뮬레이션에는 FDTD(Finite Difference Time Domain) 방법을 사용하였다.

Development of 3D Underground Utilities Processing and Partial Update Automation Technology - Focused on 3D Underground Geospatial Map - (3차원 지하시설물 가공 및 부분갱신 자동화 기술개발 - 지하공간통합지도 중심으로 -)

  • LEE, Min-Kyu;CHOI, Sung-Sik;JEON, Heung-Soo;KIM, Sung-Su
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.4
    • /
    • pp.1-15
    • /
    • 2020
  • As cities expand and underground utilities construction projects increase, there is an urgent need for a technology capable of analyzing the underground utilities network in 3D. Since 2015, 3D Underground Geospatial Map project, that has been integrating 15 types of underground information such as underground utilities, underground structures, and ground information, is in progress in S. Korea. However, the construction of 3D underground facilities is currently based on manual work and the logic for building a 3D model is very complicated. And it takes a lot of time and cost to process millions of large amounts of data per local governments. By presenting a framework on the processing and partial updating of the 3D underground utilities model, this paper aims to establish a plan to quickly build a 3D underground utility model at a minimum cost. The underground utilities processing and partial update automation technologies developed in this study are expected to be immediately applied to the 3D Underground Geospatial Map project.

Earthwork Volume Calculation of Anchorage Underground Capacity Using Laser Scanner (레이저스캐너를 이용한 앵커리지 지하공동의 토공량 산정)

  • Choi, Seok-Keun;Kim, Dong-Yeun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.18 no.3
    • /
    • pp.21-27
    • /
    • 2010
  • When the capacity of underground caverns' structures is measured, a general surveying is difficult to decide an accurate section of irregular shape and a photographic surveying has problems on picture acquisition due to underground dusts, noise and lighting conditions, etc. The laser scanner system is being much used for 3-dimensional modeling such as topography, planimetric features and structures, etc. without a target by measuring arriving time of a laser pulse reflected after scanning the laser pulse and calculating space coordinates of the reflection position. Accordingly, the present research carried out section and earthwork volume measurement of a tunnel by using a laser scanner in underground anchorage excavation work that a bridge construction is being executed.

A Study on Optimal Technical Factors of USFSS Based on Integrated Technique of Wireless Communication and Location Awareness (무선통신 및 위치인식 통합기술을 활용한 지하구조물 현장지원시스템 최적 요소기술 연구)

  • Jang, Yong-Gu;Jeong, Jae-Hyung;Lee, Jun-Woo;Kim, Hyun-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.12 no.4
    • /
    • pp.48-58
    • /
    • 2009
  • In recent years, construction worker safety in construction site is important. Especially, the frequent collapse accidents have happened in tunnels, utility tunnel and underground structure, so that the importance of worker safety is greatly emphasized. It is difficult to communicate with other workers in underground space, using the current cable or wireless communicator. When the accident is occurred, it can't rescue workers. This is the reason that it has a deficiency to find a location of survivor and communicate rescure crew and field workers. In this paper we extract the optimal technical factors of USFSS(Underground Structure Field Support System) based on integrated technique of wireless communication and location awareness. And USFSS developed in this study is suited for bad environment of underground structure construction and able to track 3D position of laborer and communicate mutually.

  • PDF

A study on the correction of the connection part of the underground facility 3D model and the correction of irregularities (지하시설물 3차원 모델 연결부 보정 및 요철보정에 관한 연구)

  • Kim, Sung Su;Han, Kyu Won;Heo, Sung Seo;Han, Sang Hoon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.429-435
    • /
    • 2021
  • The integrated underground space map shows the underground facility(water supply, sewage, gas, electric power, communication, heating), underground structures (subway, underpass, underground walkway, underground parking lot, underground shopping mall, common ward), ground(drilling, coffin, geology) refers to a map constructed so that a total of 15 types of underground information can be checked at a glance on a three-dimensional basis. The purpose of this study is to develop a technology to correct the problem of curved surface processing and the unevenness of underground facility pipelines that occur in converting 2D underground facility data into 3D-based underground space integrated map(3D underground facility model). do it with. To this end, we first investigated and reviewed the domestic and foreign status of technologies that generate data on underground facilities based on three dimensions, and developed a surface correction algorithm and an unevenness correction algorithm to solve practical problems. Algorithms to verify the developed algorithm This applied correction program was developed. Based on the above process, the three-dimensional model of the underground facility could be produced identically to reality. This study is judged to have significance as a basic study to improve the utilization of the underground spatial integration map.

A Study on the Guided drainage Method of Underground Roadway (지하차도 유도배수공법에 관한 연구)

  • Jun, Sang-Mi;Sok, Chamroeun;Park, Jae-Hyeon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.434-434
    • /
    • 2012
  • 현재 지하차도 설계 지하수위는 철도, 지하철 및 공동구의 설계기준과 기존사례를 준용하여 지표면 하 1.0 m를 기준으로 설계하고 있으며, 지하차도 설계시 지하수위 적용에 대한 명확한 기준과 그에 따른 설계와 유지관리지침 등이 마련되어 있지 않아 부득이 기존의 공법을 그대로 답습하고 있다. 또한 대부분 과다설계 요인과 친환경적이지 못하다는 지적받고 있는 부력앵커공법을 적용하고 있는 실정이다. 본 연구에서는 영종하늘도시 사업지구에 시공중인 지하차도 구조물과 관련하여 지하차도 구조물 건설에 따른 지하수 흐름 변화 특성을 평가하여 유도배수공법의 효과를 검토하였다. 지하차도 건설에 의한 흐름변화 분석을 위하여 3차원 지하수 MODFLOW 프로그램을 이용하였으며 지하차도 건설전, 후에 대하여 프로그램을 수행하였다. 수행 결과 지하차도 건설 전 유역의 평균 지하수위는 지표하 1~2m 이상으로 비교적 높은 지하수를 형성하고 있는 것으로 평가되었다. 유도배수공법을 적용한 지하차도 건설 후 지하차도 주변부 지하수위는 건설전에 비하여 약 3~4 m 하강하는 것으로 분석되었으며, U-type 종점부는 지표하 최소 6 m 이상, 시작부는 지표하 최소 3.4 m 이상 아래에 형성되는 것으로 평가된다. 연구 결과는 향후 지하차도 유도배수공법 평가의 기초자료로 활용할 수 있을 것으로 판단된다.

  • PDF