• Title/Summary/Keyword: 10 year-frequency low precipitation

Search Result 12, Processing Time 0.019 seconds

A Reservoir Operation Plan Coupled with Storage Forecasting Models in Existing Agricultural Reservoir (농업용 저수지에서 저수량 예측 모형과 연계한 저수지 운영 개선 방안의 모색)

  • Ahn, Tae-Jin;Lee, Jae-Young;Lee, Jae-Young;Yi, Jae-Eung;Yoon, Yang-Nam
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.1
    • /
    • pp.77-86
    • /
    • 2004
  • This paper presents a reservoir operation plan coupled with storage forecasting model to maintain a target storage and a critical storage. The observed storage data from 1990 to 2001 in the Geum-Gang agricultural reservoir in Korea have been applied to the low flow frequency analysis, which yields storage for each return period. Two year return period drought storage is then designated as the target storage and ten year return period drought storage as the critical storage. Storage in reservoir should be forecasted to perform reasonable reservoir operation. The predicted storage can be effectively utilized to establish a reservoir operation plan. In this study the autoregressive error (ARE) model and the ARIMA model are adopted to predict storage of reservoir. The ARIMA model poorly generated reservoir storage in series because only observed storage data were used, but the autoregressive error model made to enhance the reliability of the forecasted storage by applying the explanation variables to the model. Since storages of agricultural reservoir with respect to time have been affected by irrigation area, high or mean temperature, precipitation, previous storage and wind velocity, the autoregressive error model has been adopted to analyze the relationship between storage at a period and affecting factors for storage at the period. Since the equation for predicting storage at a period by the autoregressive error model is similar to the continuity equation, the predicting storage equation may be practical. The results from compared the actual storage in 2002 and the predicted storage in the Geum-Gang reservoir show that forecasted storage by the autoregressive error model is reasonable.

A Study on the Flood Reduction in Eco-Delta City in Busan using Observation Rainfall and Flood Modelling (관측 강우와 침수모의를 이용한 부산 에코델타시티 수해저감에 관한 연구)

  • Kim, YoonKu;Kim, SeongRyul;Jeon, HaeSeong;Choo, YeonMoon
    • Journal of Wetlands Research
    • /
    • v.22 no.3
    • /
    • pp.187-193
    • /
    • 2020
  • The increase in the area of impervious water due to the recent abnormal weather conditions and rapid urbanization led to a decrease in the amount of low current, resulting in an increase in the amount of surface runoff. Increased surface runoff is causing erosion, destruction of underwater ecosystems, human and property damage in urban areas due to flooding of urban river. The damage has been increasing in Korea recently due to localized heavy rains, typhoons and floods. As a countermeasure, the Busan Metropolitan Government will proceed with the creation of the Eco-Delta City waterfront zone in Busan with the aim of creating a future-oriented waterfront city from 2012 to 2023. Therefore, the current urban river conditions and precipitation data were collected by utilizing SWMM developed by the Environment Protection Agency, and the target basin was selected to simulate flood damage. Measures to reduce flood damage in various cases were proposed using simulated data. It is a method to establish a disaster prevention plan for each case by establishing scenario for measures to reduce flood damage. Considering structural and non-structural measures by performing an analysis of the drainage door with a 30-year frequency of 80 minutes duration, the expansion effect of the drainage pump station is considered to be greater than that of the expansion of the drainage door, and 8 scenarios and corresponding alternatives were planned in combination with the pre-excluding method, which is a non-structural disaster prevention measure. As a result of the evaluation of each alternative, it was determined that 100㎥/s of the pump station expansion and the pre-excluding EL.(-)1.5m were the best alternatives.