A Study on the Monitoring Case of the Soil Blocking Facilities Due to Water Pipe Rupture Accident (상수관 파열 사고로 인한 흙막이 가시설 계측사례 연구)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.244-246
    • /
    • 2023
  • 아파트 신축공사 흙막이 가시설 현장에 근접 매설된 상수관의 누수 및 파열 사고로 인접 건물이 공사현장 방향으로 58~188mm 기울어졌으며, 지중수평경사계 계측결과 21.07.20일 22.64mm가 21.10.18.일 101.46mm로 급격하게 78.82mm의 큰 수평 변위가 발생되었으며, 이로 인해 흙막이 가시설의 사보강재가 변형되고 토류판 일부가 파손되었다.

  • PDF

An Numerical Analysis of the Preloading Effect of IPS Retaining Wall through Earth Horizontal Displacement Measuring (IPS 흙막이 가시설의 수평 변위 계측을 통한 선행하중 효과 수치해석적 분석)

  • Lee, Chiho;Lee, Jonghwi;Lee, Changki;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.5
    • /
    • pp.25-33
    • /
    • 2012
  • In this study, gathered measuring data at fields constructed by IPS(Innovative Prestressed Support) system controls the ground displacement and improves the constructability of earth work and structure work greatly, and compared with horizontal displacement calculated by Elasto-plastic analysis program(EXCAV/W). As the result, displacement of calculated by pre-loading data is reduced 13.2% average of general method, and measuring displacement is also reduced 26.7% average of general method. Therefore that IPS system is more safe than conventional strut method in contrast to displacement of underground wall. In addition, horizontal displacement is reduced through the pre-loading effect used by IPS system.

A Study on the Self-contained Earth Retaining Wall Method Using Bracing (브레이싱을 이용한 자립식 흙막이 공법에 관한 연구)

  • Kim, Jong-Gil
    • Journal of Digital Convergence
    • /
    • v.17 no.3
    • /
    • pp.205-213
    • /
    • 2019
  • In a construction site, excavation work has a close relation with temporary earth retaining structure. In order to build the underground structure most effectively in a narrow space, prevent soil relaxation of the external behind ground in excavation work, and maintain a ground water level, it is required to install a temporary earth retaining structure that secures safety. To prevent soil washoff in underground excavation work, the conventional method of temporary earth retaining structure is to make a temporary wall and build the internal support with the use of earth anchor, raker, and struct for excavation work. RSB method that improves the problem of the conventional method is to remove the internal support, make use of two-row soldier piles and bracing, and thereby to resist earth pressure independently for underground excavation. This study revealed that through the field application cases of RSB method and the measurement result, the applicability of the method for installing a temporary earth retaining structure, the assessment result, and displacement all met allowable values of measurement, and that the RSB method, compared to the conventional method, improved constructability and economy.

Development of Infrastructure automatic alert populating system in Geotechincal Monitoring field (지반 분야에서의 시설물 안전위험 자동화 상황전파 시스템 개발)

  • Jung, Jea-Hyen;Kim, Yong-Su;Han, Sang-Jea
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.933-939
    • /
    • 2010
  • Gathering information and systemization of infrastructure disaster management is to reduce uncertainties in making decisions and maximize the number of alternations for reasonable decision making. The key object is the progress report & propagation automation system based on sensors, which is major for providing objective data to realize and support decision makings and delivering decision to a certain area, department, manager and other people rapidly. Collecting, reviewing and database of existing progress report & propagation manual in order to achieve networking of safety management on major social infrastructure of the nation, materialization of field-oriented intelligent business process by developing mobile safety management command transmission device and integrating it into facility safety management network.

  • PDF

Analysis of Accident and Measurement Costs Resulting from Incidents in Retaining Walls (가시설 벽체 사고에 따른 복구비용 및 계측비용 분석)

  • Dong-Gun Lee;Ji-Yeol Choi;Jeong-Yeon Yu;Ki-Il Song
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.3
    • /
    • pp.27-35
    • /
    • 2023
  • Ensuring the stability of visible structures during excavation works are extremely crucial. While the stability of the ground is analyzed through numerical calculations the during design phase, the conditions during construction often differ. Therefore, it is imperative to analyze the stability of the wall through measurements. The cost of measurements on the construction site is set at a very low unit price, which increases the risk of accidents involving retaining walls. In this study, we argue for the importance of automated or wireless system measurements of retaining walls, by estimating construction duration and accident costs through the analysis of hypothetical accident cases, and comparing these with measurement costs. In case of a major destruction during excavation work, the accident handling cost could be less than 5% of the total measurement budget. Therefore, increasing the measurement budget to prevent accidents in advance can be economically beneficial.

A Study on the Behaviour Analysis and Construction Method of the Self-Supported Earth Retaining Wall (SSR) Using Landslide Stabilizing Piles (2열 H-파일을 이용한 자립식 흙막이 공법(SSR)의 거동분석 및 시공방법에 관한 연구)

  • Sim, Jae-Uk;Park, Keun-Bo;Son, Sung-Gon;Kim, Soo-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.1
    • /
    • pp.41-54
    • /
    • 2009
  • The purpose of this research is to introduce the new temporary earth retaining wall system using landslide stabilizing piles. This system is a self-supported retaining wall (SSR) without installing supports such as tiebacks, struts and rakers. The SSR is a kind of gravity structures consisting of twin parallel lines of piles driven below excavation level, tied together at head of soldier piles and landslide stabilizing piles by beams. In order to investigate applicability and safety of this system, a series of experimental model tests were carried out and the obtained results are presented and discussed. Furthermore, the measured data from seven different sites on which the SSR was used for excavation were collected and analyzed to investigate the characteristic behavior lateral wall movements associated with urban excavations in Korea. It is observed that lateral wall movements obtained from the experimental model is in good agreement with the general trend observed by in site measurements.

A Study on the Optimal Location of the Inclinometer and Strain Gauge in Small-Scale Underground Excavation (소규모 지하굴착에서 지중경사계와 변형률계의 최적 위치 선정에 대한 연구)

  • Gichun Kang;Jinuk Park;Byeongjin Roh;Jiahao Sun;Seong-Kyu Yun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.2
    • /
    • pp.23-33
    • /
    • 2023
  • Currently, there are cases in Korea where economic damage has occurred due to the ambiguity instrument installation and operation standards in the construction of temporary earth retaining wall, failing to prevent collapse of temporary earth retaining wall at the construction site in advance. Therefore, in this study, a numerical analysis was conducted to find the appropriate installation location of the inclinometer and strain gauge among the installed instruments shown in the design drawing of the temporary earth retaining wall. As a results, It was found that the installation position of the underground inclinometer is the corner of the retaining wall in the case of plane-deformation analysis, and the most displacement occurs in the center of the excavation surface in the case of 3D analysis. When the stress and moment are comprehensively analyzed, the corner is judged to be a vulnerable point. In the case of the strain gauge, In plane-deformation analysis and 3D analysis, the maximum bending stress occurred at the wale connection where the end of the strut and the counter strut are in contact. At this point, it is analyzed that it is necessary to focus on installing and managing the connection to prevent accidents from being vulnerable.

A study on the Remote Control System for Measuring Gradient of temporary earth retaining structure (흙막이 가시설 구조물의 무선원격계측관리시스템에 관한 연구)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Kim, Sang-Won;Seo, Yong-Chil;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.49-52
    • /
    • 2011
  • This study concerned with the retention structures or inverted temporary building for displacement measurement in the underground soil after drilling a vertical tilt sensor attached to the vertical distance required to maintain a real-time measurement and management in order to install the wireless measuring devices installed in the field through remote control and management program for the safety of retaining structures temporary building be found on the internet in real time temporary building the retention is to develop a safety management system. And based on this technology to monitor the future status of the various structures possible to add a variety of sensors and Life Cycle Prediction of the structure and needs to evolve into intelligent systems and wireless networks using wireless communications infrastructure systems based on expanding domestic market penetration by developing instrumentation pioneer in overseas markets as well as the activation can also be judged.

  • PDF

Design, Construction and Performance of A Removable Soil Nailing System (제거식 쏘일 네일링 공법의 설계 및 시공)

  • Kim, Hong-Taek;Ryu, Jeong-Soo;Jung, Sung-Pill;Kang, In-Kyu;Park, Si-Sam
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.3
    • /
    • pp.107-117
    • /
    • 2000
  • 쏘일네일 벽체는 국낸에서 과거 10년간 가시설 및 영구구조물에 상당수 시공되어 왔다. 그러나 쏘일네일링 공법은 많은 장점이 있음에도 불구하고 인접한 건물의 하부에 쏘일네일이 삽입되는 것을 허용하지 않아 제한적으로 사용되고 있는 실정이다. 따라서 본 논문에서는 쏘일네일이 인접한 건물의 하부에 삽입되는 문제를 해결하고 철근을 재활용할 수 있는 방안으로 제거식 쏘일네일링 공법을 소개하였다. 제서식 쏘일네일링 공법은 연직굴착시 가시설 흙막이벽체로 주로 사용할 수 있다. 제거식 쏘일네일의 인발특성을 규명하기 위해 총 23회의 현장인발실험을 실시하였으며, 이를 통해 고정자 소켓의 설치간격과 시멘트 그라우트의 W/C 비가 중요한 설계인자라는 것을 알 수 있었다. 또한 본 논문에서는 국내에서 처음으로 시공되는 제거식 쏘일네일 벽체의 설계 및 시공과 시공상태 등을 소개하였으며, 제거식 쏘일네일의 철근을 제거하기 전과 후에 벽체의 변형을 계측자료로부터 분석하였다.

  • PDF

Assessment of Displacement and Axial Force of Earth Retaining Wall at Each Excavation Step Using Direct Algorithm Back Analysis (직접알고리즘 역해석 기법을 이용한 굴착단계별 흙막이 가시설 변위 및 축력의 적정성 평가)

  • So-Ra Kang;Je-Seok Jeon;Yeong-Jin Lee;Jun-Seok Lee;Kang-Il Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.23 no.1
    • /
    • pp.27-37
    • /
    • 2024
  • In this study, direct algorithm-based back analysis was utilized to perform back analysis on two actual earth retaining wall fields, which was then compared with genetic algorithm-based method to evaluate the suitability of the back analysis. Additionally, in order to propose effective utilization methods of the program, the measurement data, as the input for the back analysis, was varied for each excavation step, and the applicability of the back analysis results(displacement, axial force) was examined. The research findings indicate that both direct algorithm and genetic algorithm show high applicability; however, the optimization for this program is better predicted by the direct algorithm. Moreover, in order to effectively use the back analysis program employing the direct algorithm, it was evaluated that relatively accurate prediction of the earth retaining wall behavior could be achieved by inputting measurement data from the 7th excavation step for fields with final excavation steps ranging from 8 to 11.