• Title/Summary/Keyword: 훅턴

Search Result 2, Processing Time 0.014 seconds

A Study on Determining the Optimal Size of Bicycle Waiting Zone under Hook-Turn Operation (Hook-Turn 통행방식의 적정 자전거 대기공간 크기 결정에 관한 연구)

  • Lim, Guk-Hyun;Kim, Nam-Sun;Lee, Sang-Soo;Nam, Doohee;Kim, Jeong-Tae
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.15 no.5
    • /
    • pp.42-53
    • /
    • 2016
  • This study aims to evaluate the performance of Hook-turn operation with various sizes of bicycle waiting zone(WZ) and to determine the optimal size of bicycle WZ under various traffic and control circumstances. An extensive simulation study was performed to examine bicycle and vehicle delay trends for given experimental design. Results showed that vehicle delay was insensitive to the size of waiting zone, but bicycle delay was reduced as the size of waiting zone increased in general. The delay performance indicated a similar trend between with RTOR and without RTOR operation, but vehicle delay slightly increased and bicycle delay slightly decreased without RTOR. Regarding to optimal waiting zone size, 6 WZ was recommended for general conditions with RTOR, but 9 WZ was recommended when bicycle left-turn volume was greater than 120 v/h. 6 WZ was recommended for general conditions without RTOR, but 12 WZ was recommended when bicycle left-turn volume was greater than 90 v/h.

Assessment of Bicycle Left-turn Traffic Control Strategies at Signalized Intersections (신호교차로의 자전거 좌회전 운영방안 평가에 관한 연구)

  • Lee, Chung Min;Lee, Sang Soo;Cho, Hanseon;Nam, Doohee
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.6
    • /
    • pp.579-588
    • /
    • 2014
  • In this study, three signal control strategies such as Bike box, Hook-turn, and 6-phase were assessed for various traffic conditions at signalized intersections incorporating bicycle left-turn traffic. Results showed that the size of a waiting zone mainly affected the performance of signal control in both Bike box and Hook-turn. Both Bike box and Hook-turn yielded an identical vehicle delay, but Bike box produced less bicycle delay than Hook-turn by 2.5~29.9 sec/veh for undersaturated traffic conditions. For saturated traffic condition, Bike box produced less vehicle delay than Hook-turn and 6-phase strategies, but bicycle delay was found to increase at the 700 vph of bicycle traffic compared to 6-phase. Bicycle delay was greatly increased under Hook-turn and Bike box strategies when bicycle traffic was greater than 300 vph and 500 vph, respectively. It was also shown that bicycle delay could be significantly reduced by providing appropriate size of queueing space. In addition, Bike box was likely to yield less vehicle and bicycle delay than Hook-turn for traffic volume patterns investigated in this study.