Journal of the Korea Institute of Building Construction
/
v.9
no.6
/
pp.183-188
/
2009
HwaSeong (Suwon Fortress) was built during the reign of King Jeong-jo in the Choseon Dynasty. Detailed information on the construction of HwaSeong can be found in Hwaseong Seongyeok Euigui. In this sense, it is necessary to perform a comparative analysis on the Hwaseong Seongyeok Euigui based on construction management factors. This paper aims to analyze the HwaSeong construction project from a modern construction perspective by comparing and reviewing information related to the procurement of construction materials of the time. For this, wooden and steel materials and tiles were analyzed by supply area, supply channel, type and price. From the results of the analysis, it is found that the government used both private and official channels to supply materials. In particular, except for wooden materials that could be supplied from Bongsan, the supply of materials showed a high dependency on private channels. In terms of steel, it was almost 30 percent cheaper through private channels than when purchased through the official channel. Finally, materials vulnerable to damage like tiles were manufactured from the areas near the construction site. From this fact it can be interpreted that the government had a flexible procurement system, including manufacturing on the spot and external suppliers,depending on the property of the material. It is expected these analytical results will serve as key data to understand the management factors in constructing HwaSeong.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.341-346
/
2001
The purpose of this study is not only to show up the fact which a kind of construction management was applied during the ancient Korea, especially, Chosun Dynasty but also to understand its construction capacity by analysing various information. mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may involve a single person or many thousands. 1'his study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modem construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.
Journal of the Korea Institute of Building Construction
/
v.21
no.6
/
pp.641-652
/
2021
Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyouk-eugye, analysis and evaluation from the perspective of modern construction management were limited. Therefore, in this study, construction management related information such as time, cost, and manpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-mun was foundation work and masonry work, and the total construction period was 6 months, with the overall construction progressing very quickly. The total cost of the construction of Paldal-mun was about 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyang for labor cost. Converting these to present value, the material cost is about 1.1 billion won and the labor cost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan to conduct additional research in this area such as deriving detailed input manpower related to the work period for each type of work.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05c
/
pp.1-6
/
2009
The HwaSungSungYouk is one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recorded in HwaSungSungYoukEuGye. The purpose of this study is to analyse the data in HwaSungSungYoukEuGye in viewpoint of today's construction management for estimating the resources of PalDal-mun construction. In the record, there are a 10t of information relate to time management, cost management and human resource management, and the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYoukEuGye.
Journal of the Korea Institute of Building Construction
/
v.8
no.6
/
pp.139-145
/
2008
The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.38
no.1
/
pp.21-27
/
2020
Completed in September 1796, Suwon Hwaseong Fortress is a defense facility with 49 facilities spanning 5,744m. During the Japanese occupation and the Korean War, many buildings and walls were damaged, and in 1975, it was restored to its current state through the restoration and restoration project in Suwon. Six of the entire facilities have not been restored by urbanization, of which the restoration of water spaces, including ditches buried in the ground, could be used as a place of rest and viewing for visitors. Tourists visiting Suwon Hwaseong, are satisfied with exploring the historic sites, but feel insufficient for enjoying the natural scenery around the castle. The best way to create a natural landscape in Suwon Hwaseong, where urbanization has been developed, is to create a water space to make you feel the traditional garden. Therefore, the location, shape, and functions of the unrestored water space of Hwaseong Fortress were analyzed through the analysis of 『Hwaseong Seongyeog Uigwe』 and 『Hwaseong Full Map』. The purpose of this study is to derive the traditional landscaping method by analyzing the characteristics of water space.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.29
no.4
/
pp.137-147
/
2011
This study aims to find out the construction process and planning characteristics of Suwon and Hwa-sung in 18th century from the point of water system. This study has an explanatory approach. The planning intents in the water system was driven out by analyzing various planning elements in relation to water system in the process of constructing Hwa-sung in 18th century. Using Entire Map of Hwa-sung, land registration map made in 1911 and topographic map of 1/10,000 scale made in 1917, water system and interpretation of spatial structure in Hwa-sung were analyzed. The results are as follows(Planning characteristics of the water system in Haw-sung in 18th century are as follows). Firstly, in determining the spatial structure and location of Hwa-sung, water system had an important role. Secondly, integrated drainage system was planned by the organization of natural and artificial water stream. Thirdly, the main street system and land use structure were planned in relation with water system. Fourthly, territoriality of main area was planned with water stream. Fifthly, ponds were constructed for flood control and they had important role as landscape elements. Sixthly, water stream was used as intentional BiBo element. As a result of the study, the weater system of Hwa-sung in 18th century was planned by the organization of natural and artificial water stream in relation with the location of new town and wide area's spatial structure, street system, land use structure, territoriality of main area, terriflood control, water quality protection, landscape, 비보 and urban daily life.
Proceedings of the Korean Institute of Building Construction Conference
/
2008.11a
/
pp.167-171
/
2008
HwaSungSungYouk was one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recored in HwaSungSungYoukEuGye. The purpose of this study is to analyse the HwaSungSungYoukEuGye' management technic in viewpoint of today's construction management. In the record, there are a lot of informtion relate to record management, time management, cost management, etc. and the concept of the managements can be applied to today's construction project effectively. The concept and detail of the HwaSungSungYouk's project management should be analysed more.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.41
no.4
/
pp.1-7
/
2023
Chwibyeong is a hedge made into a folding screen shape by setting up supports and placing plants on it. Traces of chwibyeong can be found in various paintings, such as the 『Donggwoldo painting of Changdeokgung Palace』, 『Gyujanggak painting』, 『Munhuimyo painting』, and 『Hwaseong Temporary Palace painting depicting Suwon Hwaseong Temporary Palace』. However, since the Chwibyeong has not survived to this day, the whereabouts of the Chwibyeong were estimated through ancient documents, old paintings, and photographs. In the case of a manned Chwibyeong using a support, a picture related to the composition of the Chwibyeong using a base can be Winnow willow. Methods for creating intoxicants using coniferous trees such as Chinese juniper and Rigid-branch yew have been studied. In existing old paintings, only the supports, parts of leaves, and branches were depicted, so the location of the Chwibyeong could not be confirmed through the drawings. However, in the 『Jungli-Euiguae』, written around 1797, a manned type of Chwibyeong using a support was depicted as the material of the Chwibyeong. By being able to confirm the type of tree used, it was possible to confirm the method of creating a Chwibyeong using Winnow willow introduced in the 『LimwonGyeongjeji』. However, in the 『Jungli-Euiguae』, written around 1797, a manned type of Chwibyeong using a support was depicted as the material of the Chwibyeong. By being able to confirm the type of tree used, it was possible to confirm the method of creating a Chwibyeong using Winnow willow introduced in the 『LimwonGyeongjeji』. Therefore, the purpose of this study is to suggest a method of using Chwibyeong to restore by analyzing old literature. For this purpose, first, the process of change in the material of the Chwibyeong was analyzed through the analysis of old documents showing the method of forming the Chwibyeong. Second, the material and composition method of the Chwibyeong were analyzed through the analysis of the picture of "Seongyeok-do" in 『Jungli-Euiguae』, which allows us to understand the form of the Chwibyeong
The purpose of this study is not only to evaluate the capacity of construction management but also to understand the capacity of construction productivity by analysing various information, mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. It is true that previous researches have showed lots of limitation to study the HwaSungSungYouk-EuGye though it contained a plenty of construction data. The main reason would be the absence of study methods to analyze HwaSungSungYouk-EuGye systematically. That's why there have not been overall studies about the HwaSungSungYouk-EuGye. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may Involve a single person or many thousands. This study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.