• Title/Summary/Keyword: 현황측량

Search Result 219, Processing Time 0.025 seconds

An Application of VRS-RTK Surveying in Construction Site (건설현장에서의 VRS-RTK측량 적용성 검토)

  • Kim, In-Seup;Joo, Hyun-Seung
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.6
    • /
    • pp.625-631
    • /
    • 2008
  • Correct evaluation of cut and fill volume of soil is one of the most important factors which controls construction cost in enormous construction sites. To achieve accurate computation of soil volume in construction site precise surveying is required, however most of construction sites adopt existing optical surveying instruments such as Total Station. The problem when using these optical instruments in construction sites is that these instruments take longer time in data acquisition. Due to insufficiency of computation time accurate and precise observation cannot be accomplished with these equipments. As a result roughly calculated earthwork volume may cause arguments between contractors and supervisors in the matter of reduction or increasement of total construction cost. In this study VRS-RTK Surveying is adopted to perform fast and accurate in-situ surveying for rapid computation of soil volume. This VRS-RTK Surveying system is proved to have more accurate three dimensional coordinates with high density and better economical solution with less manpower.

Accuracy Assessment of Building Registration on the Cadastral maps Using Architectural Drawings (건축도면을 활용한 지적도의 건물 등록 정확도 평가)

  • Park, Ki-Heon;Um, Joung-Sub
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.233-239
    • /
    • 2007
  • 현행 지적도에는 건물 위치가 표시되지 않아 지적도 활용 시 건물 위치 식별이 어렵고, 지적현황측량에 따른 비용과 시간의 소요와 불편을 격고 있으며, 지상 건물의 경계 침범으로 인한 분쟁과 소송이 일어나고 있다. 건축물 경계 추출에 관한 선행연구에서 수치정사사진과 LiDAR를 이용한 건물 경계를 추출은 원칙적으로 지적측량의 원리와 상이한 기준으로 실제 지상의 외벽 경계선이 아닌 건축물의 옥상층 경계선을 추출하였다. 따라서 본 연구에서는 건물등록을 위해 시도해 보지 않았던 건축도면을 이용하여, 기존연구에서 고려되지 못한 지붕선이나 처마선이 아닌 실제 지적측량에서 기준이 되는 외벽의 경계선을 등록하기 위해 건축도면을 활용하였으며, 등록하는 과정에서 ArcGIS 엔진을 이용하여 개발한 자동 등록 방법을 사용하였다. 지적도 필지 경계선과 건축도면의 필지 경계선을 기준으로 등록한 결과 지적현황측량 성과와 수치지역에서 연결오차로 RMSE가 0.10m, 도해지역에서 0.16m로 나타났다. 따라서 건축도면을 이용하여 지적도에 건축물의 경계를 등록함으로써 지상측량을 보완할 수 있으며, 3차원 지적구축을 위한 기반을 조성하고, 지적재조사사업에서 시간과 경비를 획기적으로 절감할 수 있을 것이다.

  • PDF

Development of a Software for Calculation of Cadastral Control Points (지적기준점 성과계산 소프트웨어 개발에 관한 연구)

  • 우인제;이종기;김병국
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.361-366
    • /
    • 2004
  • GPS 관측기법을 지적측량에 도입하기 위하여 GPS를 이용한 새로운 지적측량 모형(Model)을 정립하는 연구와 관련 기술들을 개발하는 연구가 활발히 진행되고 있다. 이와 같은 추세에 발맞추어 GPS 자료처리 및 기준점 성과산출과 관련하여 국내ㆍ외 측량 관련 상용 GPS 자료처리 소프트웨어의 현황 및 성능을 파악하고, 자료처리 알고리즘을 분석하여, 우리 실정에 적합한 GPS 자료처리 소프트웨어를 개발하는 것을 본 연구의 목적으로 한다. 본 연구에서는 국내ㆍ외의 전문 업체, 기관(대학)이 보유하고 있는 상용 소프트웨어 현황 분석 및 자료처리 방법에 따른 오차 발생을 연구하여 기선해석, 망 조정, 좌표변환 등 에 관련된 전문 소프트웨어 기능을 비교 분석하여 자료처리 산출성과의 정확도를 향상시키는 방향을 모색한다. 또한 기존 GPS 자료처리 소프트웨어에 적용된 알고리즘을 분석하고 지적측량성과 산출에 최적인 알고리즘을 연구하여 새로운 지적기준점 성과 산출을 위한 지적측량 성과계산 소프트웨어를 개발한다.

  • PDF

Development of GNSS Field Survey System for Effective Creation of Survey Result and Enhancement of User Convenience (효과적인 측량 성과물 작성 및 사용자 편의성 강화를 위한 GNSS 현장 측량시스템 개발)

  • Park, Joon Kyu;Kim, Min Gyu
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.35 no.3
    • /
    • pp.203-210
    • /
    • 2017
  • Korea has established an advanced infrastructure for real-time precise positioning such as CORS, virtual reference station service and perform continuous upgrading. However, in order to utilize the national infrastructure, it is necessary to process the acquired spatial information and take many steps to derive the final product. In addition, this process is highly dependent on foreign software. In this study, GNSS field survey system was developed and evaluation of its usability was performed. Real-time GNSS field survey system was developed and the system improves user̓s convenience and usability. The system was able to conduct survey effectively and produce the results. In addition, we compare the existing software with the survey performance to show the availability of the real-time GNSS surveying system. The system developed through the research can perform all the functions from real-time survey to the production of the outputs. It can create economical added value of the foreign software as a whole and simplify the work required for post-survey performance.

Utilization Evaluation of Digital Surface Model by UAV for Reconnaissance Survey of Construction Project (건설공사 현황측량을 위한 UAV DSM의 활용성 평가)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.155-160
    • /
    • 2018
  • The unmanned aerial vehicle (UAV) is used in various fields, such as land surveying, facility management, and disaster monitoring and restoration because it has low operational costs, fast data acquisition, and can generate a digital surface model (DSM). Recently, the UAV has been applied to process management in construction projects. Construction projects are widely distributed not only in urban areas but also in mountainous areas and rural areas where people are rarely in traffic or in vehicles. Projects range from a few hundred meters to several kilometers long. In order to perform a reconnaissance survey, a surveying method using a global positioning system (GPS) or a total station has mainly been used. However, these methods have a disadvantage in that a lot of time is required for data acquisition. This study's purpose is to evaluate the usability of a UAV DSM for surveying a construction area. Data was acquired using the UAV and a three-dimensional (3D) laser scanner, and the DSM of the construction site was created through data processing. The UAV DSM showed accuracy to within 30 cm based on the 3D laser scanner data, and a process comparison between the two work methods was able to present the usability of the UAV DSM in the field of construction surveying. Future utilization of the UAV DSM is expected to greatly improve the efficiency of work in construction projects.

Evaluation for Applying Low-Cost Mobile Laser System to Earth Volume Calculation at Construction Site (건설현장에서의 토공량산출을 위한 저가형 모바일 레이저시스템의 적용성 평가)

  • Kim, In Seop
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.6_1
    • /
    • pp.539-547
    • /
    • 2012
  • Volume survey for earthwork is conducted periodically at every month at large scaled construction sites for request payment for the construction. Currently, the earthwork volume is calculated on the overlapped drawing for two cross sections which were created by new and previous surveying data observed by GPS and TS. However the survey is required lots of time and expenses as it is a pin-point surveying method thus surveyors intend to get data only for the heavy undulated topographic features chosen by himself to save time and expenses. Consequently, it causes poor results due to low dense measurement as well as it's not matched with the results by another surveyors. As a result, the conflicts related in earthwork volume calculation often arises among the owner, contractors and sub contractors. In this study, we developed a method to get surveying data for fast and accurate volume calculation using 3D Mobile Laser System and conducted an application test. Also we carried out experiments for topographic survey using MLS to judge for the application additionally. The results showed that we could reduce a time for cross section survey from 48 hours to 2 hours and collected high dense data which have 0.2m interval instead of 3m interval compare with existing method. Also we could make a map which has high accuracy within 10cm in horizontal through topographic survey using MLS.

우리나라 주요 항만해역의 효율적인 수로측량 개선방안에 관한 연구

  • U, Yang-Ho;Jo, Dong-O;Kim, Tae-Gyun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.06a
    • /
    • pp.177-179
    • /
    • 2012
  • 이 연구의 목적은 우리나라 해상교통 안전확보를 위하여 전국 주요 항만 해역에 대한 수로측량의 긴급성과 중요성의 기준을 객관적으로 마련해 보는 것이다. 즉 전국의 관할 항만 해역별로 중요성과 위험성, 다양한 이용 고객들 수요의 긴급성과 중요성 등을 고려하여, 수로측량 우선순위(survey priorities)를 설정하고 객관적이고 합리적인 모델을 만들어 보는 것이다. 이를 위해 항만해역 수로측량의 변천과 현황, 기존의 문제점을 살펴보고, 문헌연구와 해외의 해양선진국 수로측량 사례를 통하여 잠정기준을 도출하였다. 그리고 이를 전문가 설문조사 및 분석을 통해 우선순위를 도출하였다. 그 결과 우리나라 주요 항만해역의 수로측량 우선순위로는 해저지형 변화, 해상교통량, 기존 수로측량 실적, 이해당사자/이용자의 요구, 해양사고, 해양환경 및 생태자원 보존 등으로 나타났다. 결론적으로 본 연구는 우리나라에서 향후 수로측량을 보다 과학적이고 체계적인 방법으로 수행하기 위한 모델을 만들어보고, 여러 정책적 제안을 하였다.

  • PDF

A Study on Improvement of Order System for Survey Service (측량용역 발주제도 개선에 관한 연구)

  • Park, Tai-Sik;Han, Soung-Man
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2008.10a
    • /
    • pp.236-242
    • /
    • 2008
  • 설계용역과 통합하여 발주되는 측량용역의 입찰 제도를 보면 계획기관에서 설계예산서를 작성하여 해당 부처 분임경리관을 경유하여 공개경쟁입찰 또는 입찰참가자격제도(PQ) 등으로 발주하게 된다. 이 과정에서 측량용역과 설계용역을 분리하지 않고 측량용역 비를 설계용역비에 통합예산으로 발주 처리하고 있어 측량회사는 설계용역사로부터 불법으로 하도급 받고 있다. 설계용역회사는 엔지니어링등록과 측량업(공공측량)을 동시에 등록하여 용역수주를 하므로 기술력이 부족한 측량용역을 당연히 저가하도급으로 처리하는 커다란 모순이 발생하고 있다. 따라서 저가하도급으로 인한 측량성과의 부실은 건설공사의 부실시공으로 이어져 커다란 공사비손실과 안전 및 유지관리에 큰 문제점을 야기하고 있다. 이와 같은 문제점을 해결하기 위하여 본 연구에서는 측량용역 등록업체의 현황 및 현행 발주제도 방법 등의 분석을 통하여 발주제도의 개선방안을 제안하고자 한다.

  • PDF