• Title/Summary/Keyword: 현장 시공관리자

Search Result 44, Processing Time 0.019 seconds

An Empirical Analysis on the Working Conditions of Construction Technician (건설 기능인력 근무여건에 대한 실증 분석)

  • Yang, Jinkook;Lee, Taeshin;Lee, Jongmin;Lee, Sangbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.14-21
    • /
    • 2019
  • The construction phase of the construction project needs a large scale of manpower, materials and equipment. Among them, manpower is a core part for project construction. These manpower are divided into two groups. The first is the management group that manages the construction, and the second is the site technician manpower for construction work. Recently, construction company has suffering due to the insufficient supply of technician labor. Accordingly, this study will perform an empirical analysis about the construction technician. To do this, we surveyed related research trends and conducted surveys on the satisfaction of the construction technician. The result, satisfaction with pay and insurance was relatively low compared to other items. Therefore, this study were conducted in-depth interviews with technician managers in order to analyze the cause. In addition, case analysis was conducted to analyze actual working conditions. As a result, it was analyzed that the wage level and insurance system of construction technician were considerably stable compared to the manufacturing industry. The result of this study is expected to contribute to the activation of excellent technician cultivation through the change of recognition about construction technician.

A Study on the Potential Risk Analysis for the Safety Management in the Formwork (거푸집공사 안전관리를 위한 잠재적 위험 분석에 관한 연구)

  • Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.121-128
    • /
    • 2021
  • Due to the increase of size and complexity of construction project, the frequency of serious accidents in construction industry has been increased. Especially, the proportion of accidents in formwork of building construction site is very high, and many previous studies have been conducted to preventing them in the viewpoint of the diverse approaches. However, their effectiveness on accidents prevention was poor, and as a result, it is limited to consider the potential risks because many workers and managers tend not to be concerned with unsafe factors in formwork. Therefore, in this study, a realistic and proactive way for analyzing these potential risks was proposed in the manner of quantitatively assessing the potentials resulted from the unsafe factors in formwork. To verify the applicability of the proposed methodology, group survey was carried out, and the results were compared with those of the traditional importance-performance analysis(hereafter IPA) technique. Through the use of the proposed methodology, unsafe factors that were not found in the IPA but have potential risk were identified. Eventually, this study is expected to contribute to the proactive prevention of construction serious disaster accidents in formwork by enabling a more efficient management.

A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work (철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.15-24
    • /
    • 2018
  • Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.

CASH FLOW FORECASTING IN CONSTRUCTION PROJECT (건설공사에서의 현금흐름 예측)

  • Park Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.35-41
    • /
    • 2002
  • This research introduces the development of a project-level cash flow forecasting model in construction stage based on the planned earned value and the cost from a general contractors view on a jobsite. Most previous models have been developed to assist contractors in their pre-tendering or planning stage cash flow forecasts. The critical key to cash flow forecasting at the project level is how to build a cash-out model. The basic concept is to use moving weights of cost categories in a budget over project duration. The cost categories are classified to compile resources with almost the same time lags that are based on contracting payment conditions and credit times given by suppliers or venders. For cash-in, net planned monthly-earned values are simply transferred to the cash-in forecast, to be applied there with billing time and retention money. Validation of the model involves applying data from on-going 4 projects in progress for 12 months. Based on the results of the comparative analyses through the simulation of the proposed model and the existing models, the proposed model is more accurate, flexible and simpler than traditional models to the employee of construction jobsite who is not oriented financial knowledge.

  • PDF