Analysis of Accuracy and Productivity of Terrestrial Laser Scanner for Earthwork (3차원 스캐너의 토공현장 적용을 위한 정밀도 및 생산성 분석)

  • Kim, Seok;Park, Jae-Woo
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.10
    • /
    • pp.587-596
    • /
    • 2015
  • 3D scanners are applied to many industries, such as manufacturing, construction, and shipbuilding. Recently, 3D scanner is used in 3D imaging of worksite in order to control and guide earthmoving heavy equipments, which provides basic information for intelligent excavation. This study compares the accuracy and productivity between total stations and high-resolution 3D scanners. The analysis results show that 3D scanner has high accurate rate of greater than 99 percent and has low error rate of less than 2.0mm compared to total stations. In terms of productivity, 3D scanner saves 71 percent of measuring time compared to the total station. This study confirms that 3D scanner can measure the earthwork sites with high accuracy and better productivity.

Study installing a manhole to on-site methods to assemble as use polymer concrete segment (폴리머 콘크리트 세 그먼트를 이용한 현장 조립식 맨홀 설치 연구)

  • Kim, Dong-Hun;Han, Jin-Woo
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.315-319
    • /
    • 2007
  • 지하에 설 치된 맨홀의 구조물이 노후되거나, 내부에 수 용된 시설물로 작업 공간이 협소하여 맨홀 구조물을 대개체 할 펼요가 있을 경우, 지금까지는 대부분 현장 콘크리트 타설에 의한 방법을 사용하였다. 이러한 방법은 거푸집 시공, 콘크리트 타설, 콘크리트 양생, 거푸집 철거 등의 공정이 소요되어 공사 기간이 장기화 되고, 도심지에 위치한 맨홀인 경우에는 차량과 보행자의 통행 불편을 초래하기도 하였다. 또한, 통상적으로 사용되고 있는 프리캐스트 맨홀에 비해 시공 품질이 낮아 향후 맨홀의 운용 및 유지관리에 많은 어려움을 겪는 원인이 되기도 하였다. 본 논문에서는 이러한 문제점들을 해결하기 위해, 폴리머 콘크리트를 이용하여 하부, 벽체, 상부로 구성된 다수의 세그먼트를 생산한 후, 현장에서 이들 세그먼트를 조립하여 맨홀을 설치하는 방법을 연구하였다. 가변형 거푸집을 이용한 세그먼트 제작과 조립식 블록에 의한 관구를 사용하여 현장 적용성을 높임은 물론, 프리캐스트로 생산되는 폴리머 콘크리트 맨홀 수준의 시공 품질을 확보할 수 있도록 하였다.

  • PDF

QUALITY CONTROL OF FIELD CONCRETE

  • 김형걸
    • Journal of the Korean Professional Engineers Association
    • /
    • v.1 no.4
    • /
    • pp.9-15
    • /
    • 1968
  • 콘크리트 공사시방에 있어서 강도 최저강도를 지정하는 것이 오늘날 까지의 관습으로 되어있다. 즉, 몇개의 강도시험의 평균치가 얼마이상 이어야 된다든가, 전부의 콘크리트가 얼마 이상의 압축강도를 갖어야 된다든가, 또는 콘크리트는 28일 압축강도 얼마를 낼 수 있도록 콘크리트 단위용 적당 cement를 몇 kg, 혹은 몇 포대를 사용해야 된다 든가로 규정되는 것이 보통으로 되여 있다. 그러나 이 방법만으로는 그 콘크리트의 실제의 안전율을 예측할 수 없을뿐만 아니라 균질한 콘크리트를 얻는것을 기대할 수가 없을 것이다. 즉 합리적인 시방이 되지 못 한다. 두말 할 것도 없이 우리는 현장에서 건축물설계자가 요구하는 강도의 콘크리트를 얻어야 될 것이고, 또 한편으로 그 강도가 골고루 되어야 할 것이다. 즉 강도의 변화가 심하지 않아야 될 것이다. 이것을 기대하기 위하여 concrete 제조현장에서 통계학적 이론에 입각한 품질관리를 행하는 것이다. 그렇게 하므로서 보다 합리적인 시방이 이루어지게 된다. 현재 미국에서는 콘크리트 공사의 큰 현장에서 concrete 생산 품질관리를 행하고 있는 것으로 안다. 그러면 여하한 이론에 입각하여 현장에서 다량으로 concrete를 생산할때에 그 품질을 관리하느냐 하는 것을 현재 미국에서 propose 되여 있는 안과 ASTM에 규정되여 있는것을 중심으로 소개하고 아울러 concrete 공사에서 강도에 관한 시방을 앞으로 이끄러, 나갈 방향을 제시하고저 한다.

  • PDF

프린팅 월드 - 인쇄업 미래 좌우할 현장 개선

  • Kim, Sang-Ho
    • 프린팅코리아
    • /
    • v.11 no.5
    • /
    • pp.132-135
    • /
    • 2012
  • 현장개선은 인쇄회사에 있어서도 보편적인 테마가 되었다. 더욱이 오랫동안 정체 및 감소세를 보이고 있는 일본 인쇄업계의 사정을 감안하면, 개선활동을 통해 사고의 발생을 줄이고, 인쇄 사고를 미연에 방지하는 것은 그 중요성이 더욱 커지고 있다고 할 수 있다. 우선적으로는 사고가 발생하지 않는 생산체제를 확립하는 것이 이뤄져야 한다. 또한 현장 개선에 있어서 취약점으로 지적되고 있는 협력업체에서 이뤄지는 고정에 대한 관리까지도 염두에 둬야 한다.

  • PDF

프린팅 월드 - 일본 인쇄사의 생산현장 개선 노력

  • Kim, Sang-Ho
    • 프린팅코리아
    • /
    • v.14 no.8
    • /
    • pp.124-127
    • /
    • 2015
  • 일본의 인쇄업계는 적정한 이윤을 확보하기 위해 낭비를 없애는 등 수익을 확보하기 위해 많은 노력을 기울이고 있다. 수익개선을 위해 교에이샤는 현장개선과 인재육성을 동시에 진행해 지금의 확고한 경영체제를 구축할 수 있었다.

  • PDF

Productivity Improvement through the Waste Elimination of Construction Process (건설공정의 낭비제거를 통한 생산성 향상 방안)

  • Mun Jeong-Mun;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.93-103
    • /
    • 2002
  • The reinforcement concrete work is the work affected by structural safety, durability, and schedule with form work. The domestic reinforcement concrete works have mainly worked the process of re-barfabrication/assembly on site. Finally it have low productivity. Then this paper analyzed waste factors and the process of re-bar fabrication/assembly on site for the productivity improvement and value-added productivity improvement. Waste factor analysis aims at maximizing value-added by the value analysis of re-bar fabrication and assembly on site. Finally, Value-AddingActivity(VAA)ismuchlessthan non-value adding activity. Especially, Non-Value-Adding Activity(NVAA) generates waste such as the activity steps, labors, equipments, materials, time, and soon. And it was non-flow production, over production, and analyzed into having to shift value. This paper aimsat maximizing value-addingactivity and minimizingnon value-addingactivity through waste factor analysis in process for the improvement of value added productivity.

On the Technology Development Strategy for Developing Competitive Manufacturing Technologies (생산기술 육성의 과제)

  • 장낙영
    • Journal of the KSME
    • /
    • v.35 no.4
    • /
    • pp.280-284
    • /
    • 1995
  • 우리나라는 과거 성공적인 경제성장의 업적에도 불구하고, 기술의 취약성으로 인한 많은 애로 사항을 겪고 있으며, 이러한 어려움을 탈피하기 위하여는 생산기술의 육성이 절실한 과제이다. 제조업의 경쟁력을 향상시키는 생산 기술을 개발하기 위하여는 지능생산시스템의 설계능력 양 성과 설계 및 생산의 공동개발체제 구축이라는 개념이 도입 정착되어야 하겠으며, 이러한 방안을 빠른 시일내에 전파시키기 위하여는 생산기술 개발에 대한 시스템적 접근방법이 강조되어야 하 겠다. 우리나라 산업체의 생산현장의 문제를 풀기 위하여 학교, 연구소, 제조업체에서 중지를 모아서 산학연의 연구를 활발히 전개한다면, 우리나라가 21세기에 선진국의 대열에 진입하는 것도 가능하리라 믿는다.

  • PDF

안전관리 평가 시스템 구축에 관한 연구

  • 임차순;임동호;김윤화;고재욱
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.05a
    • /
    • pp.147-150
    • /
    • 1998
  • 현대의 고도화된 산업발달과 함께 생산품의 고품질, 다품종, 대량생산을 위한 설비의 대형화, 공정의 복잡화, 위험성이 높은 물질의 대량 사용 등으로 인하여 잠재위험이 더 한층 증가하게 되었다. 따라서 산업현장에서 여러 가지 잠재위험으로 인하여 화재, 폭발, 독성물질 누출 등 대규모 중대산업사고의 발생 가능성이 커졌으며 사고 발생시 현장의 근로자, 인근지역 주민, 주변의 환경에까지 막대한 영향을 미치게 된다. (중략)

  • PDF

건설공사 추락재해의 공정별.피재자별 원인분석

  • 이규진
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2000.11a
    • /
    • pp.399-404
    • /
    • 2000
  • 건설업은 제조업에 비해 재해로 인한 사망률이 높은 산업이다. 대부분의 건설공사는 제조업과는 달리 고정된 생산현장이 아닌 단품수주에 의한 1회성 현장생산에 의존하고 있으므로 안전관리가 체계적으로 이루어지지 못하고 상황에 따른 임기응변적인 경우가 많다 또한 안전시설물의 설치도 매회 공사시마다 새로이 설치해야하므로 시간적ㆍ경제적 이유로 인해 소홀히 취급되기 쉽다. 건설재해에 대한 책임은 일차적으로 건설업자에게 부가되지만 건설공사 작업자의 안전에 설계자도 중요한 영향을 미친다./sup (4)/ 따라서 설계시에는 건설공사의 안전을 고려하여야하며, 공사계획시에는 공사안전관리의 대상을 명확히 해야 한다.(중략)

  • PDF

기획특집 - 전기에너지산업 현장(現場)을 가다 -시화호조력발전소

  • 대한전기협회
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • s.414
    • /
    • pp.90-93
    • /
    • 2011
  • 세계 최대 시설용량이며, 국내최초인 조력발전소의 마무리공정이 한창 진행되고 있는 대역사의 현장을 지난 17일 오후 2시에 찾았다. 짭쪼름한 바닷내음이 점차 진해진다 싶을 때 시야에 들어온 '청정 무공해 전력생산기지' 시화조력발전소. 발전소는 경기도 안산시 오이도와 대부도 사이를 잇는 길이 11.2Km 시화방조제 중간(작은 가리섬)에 위치한 가운데 본격가동의 카운트다운을 준비하고 있다. 지난 4월 10호기를 시작으로 6개월간에 걸친 각종 설비기능시험 등을 거쳐 오는 11월 상업운전을 통해 본격적인 전기 생산에 돌입할 예정인 시화조력발전소의 건설 의미와 주요시설 및 설비구성, 그리고 준공에 따른 기대효과 등을 조망해 본다.