Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.541-544
/
2001
PC Box Girder was constructed by PSM(Precast Span Method) to solve the shortage of the construction period. The site case study was used in the PSM to find the construction productivity improvement. In this case study, main reasons of low productivity were founded unskilled technical engineers and insufficient equipment management winter season concrete curing condition. Productivity improvements are presented by assigning production personnel appropriately, motivation which increased by providing incentives for technical engineers, strictly cooperation of each participant, organizational teamwork, and Promoting productive work condition. Additional method of productivity improvements are continuous improvement of the work methods by considering the feedback on previous work, and continuous training to best handle the site conditions. This study of productivity improvement will help to use the most advantage of the PSM method and desire to successfully plan the future construction performance.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.8
no.3
/
pp.147-155
/
2013
This paper study is for enhance the productivity. The purpose of this study is save the cost and contribute the enhancing company's competitiveness by analysis overall wastes in production line and improve the wastes in production line. Many company does not have clear process for analysis the wastes in production line. so they use classical IE tool and advanced IE tool by considering their current situation but the result was not so effective. The study to arrange the classic IE and advanced IE by each step to analysis the wastes by each production line include assembly line and processing line and automation line so that we can predict the mount of the overall wastes and easily select / focus on the tool for maximize the improvement result. It will contribute to establish the mid term and long term improvement activity plan.
The main objective of this study was found to be empirically seeing whether on-site training for students in the field of education and various programs in the field of SMEs michyeotneun any impact on production duties. Results of sub-areas of education and training educational experience, training motivation, training, experience, demographic characteristics and performance of education and training, and because there is a close correlation as sub-areas of business productivity, industrial welfare, governance, education, the period of increased productivity by properly adjusting the sub-variables of education and training it can maximize the educational experience of the work. This study provides the policy implications and implications for the future so that the unemployed(including unemployed youth) re-employment training and on-site training is satisfactory to shine and develop more good quality programs.
Jin Eui-jae;Park Sang-hyuk;Chae Myung-jin;Han Seung-hun
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.515-520
/
2004
Manufacturing Production System (MPS) has been widely accepted in construction area for the productivity improvement. However, the MPS does not always provide cost and time saving. It often caused more delays and increased project cost. Therefore the use of the MPS technique, systematic decision-making process is needed by reviewing various project parameters such as cost and time. This study includes extensive literature reviews and case studies on MPS. As a result, a decision-making model is proposed. The decision-making flowchart and decision-making model are developed in three steps: (1) identification and categorization of decision-making factors; (2) calculations of benefits, cost, and duration in accordance with the location and the production capacity of the factory; (3) comparisons of MPS and on-site assembly by varying the locations and sizes of the factory
Proceedings of the Korea Society for Industrial Systems Conference
/
1998.10a
/
pp.835-847
/
1998
관리사무실에서 원거리 현장사무실을 관리할 수 있는 직접적인 방법이 없는 형편이다. 전화나 팩스를 이용할 경우에 소요되는 인력이나 경제적 손실등에대한 낭비가 막대하다. 이에 따라 감시 카메라를 사용하는 기업이 산업화가 가속화되면서 점차 늘어나고 있다. 생산 현장등에서 차량 감시 시스템, 경비 시스템, 주차장 관리 시스템등의 다양한 부문별로 감시 카메라를 이용하는 기업들이 많이 있다. 이러한 기업들의 시스템에서 실시간 감시 관리 시스템을 이용하여 동화상 자체를 카메라에 연결된 시스템의 저장매체에 저장하고 있으며, 이를 감시인이 원거리에서 실시간 감시하고 있다. 이런 경우에는 시스템의 비용이 고가이고 저장된 영상의 분석 또한 쉽지 않다. 이러한 문제점을 해결하고자 경제적이고 실용적인 방법으로 감시 카메라, 영상 전송 시스템, 영상 분석 시스템등으로 구성되어 웹 기반으로 활용할 수 있는 생산현장 원격 관리 시스템을 제안한다.
항생제 생산을 위한 생물공정은 크게 3단계로 나뉠 수 있다. 우주균주 선발, 현장균주 보존및 현장 종균 공급을 위한 일련의 종균배양 과정을 Upstream이라 할 수 있고, 종모실로 부터 공급받은 종균을 현장에서 증식시키는 현장 종균배양 공정과 본 발효조에서의 항생제 생합성공정을 Mid-Stream, 발효가 끝난 상태의 배양액으로부터 균체, 세포내 및 세포외 불필요한 물질을 제거하고 항생제만을 회수, 정제하는 Down Stream으로 나뉠 수 있다. 따라서 항생제 발효는 좁은 의미에서는 본 발효조에서의 항생제 생합성공정을 가르키지만 넓은 의미에서는 위 전체 공정을 가르키는 말이기도 하다. 따라서 본 소고에서는 항생제 생산을 위한 생물 공정상의 문제점을 3분야로 나누어 제시하고자 한다. 실제로 항생제 공장을 건립하여 항생제 발효를 실시해 왔으며 그것을 좀더 나은 수준으로 개선하고자 꾸준히 노력해 온 당사에서의 경우를 그 예로 보아 문제점을 제시하고자 한다.
Korean Journal of Construction Engineering and Management
/
v.21
no.2
/
pp.88-97
/
2020
Practical and efficient application of lean construction, which has been proposed as an alternative to the limitations of traditional construction management methods, was developed to facilitate application on site and improve productivity through the fusion of traditional construction management methods. The concepts of Lean Time and Lean Cycle Time, which are the principles of lean construction, were introduced to eliminate waste and smooth flow production and pursuit of perfection, and the goal of establishing and improving the criteria for measurement and improvement was established and the information collection template was configured and applied to ensure reliability of measurement and analysis. Based on this, the project feasibility, reliability, and continuous improvement process were applied to the Field case to verify its effectiveness.
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.5
/
pp.721-731
/
2018
Manpower in domestic construction sites is becoming more and more aging. Various methods have been devised to prevent productivity and quality deterioration of construction due to absence of skilled workers and difficulty in supplying manpower. Especially, many researchers study various methods such as Machine Guidance (MG) and Remote Machine Control to improve productivity and quality. Although many prior studies have been conducted since the advent of MG, There is lack of field test in a difficult site to stakeout. In this study, field test of MG excavator was carried out at difficult site to stakeout, and productivity analysis and quality evaluation were conducted. As a result of the analysis of productivity, the minimum value was 20.5%, the maximum value was 56.9%, and the average productivity in 4 days was 38.3% higher than the standard product. As a result of the analysis of quality, the horizontal error ${\pm}1cm$ and the vertical error ${\pm}2cm$ confirmed in the previous study were verified.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.6D
/
pp.969-974
/
2006
Labor shortages are a serious problem for Korea's construction industry. The problem is both quantitative and qualitative. There is a shortage in supply as due to a decrease in the influx of new labor, and existing workers are less productive as they age. The problem will only get worse as more and more major public projects are being planned. Options for increasing the labor supply are somewhat limited, and thus efforts need to be made to adopt new technologies that can improve the productivity and efficiency of field work and their processes. This paper introduces seven innovation technologies that have the best potential to increase productivity and thus reduce the burden of labor shortage problems. These include 1) Substitution by use of robotics and automation, 2) development and applications of Innovative materials to reduce on site field work, 3) increase in productivity through the implementation of Information Technology, 4) improved productivity through the application of modules, and prefabrication, 5) prevention of rework and redesign, 6) diversification of labor by integrating labor skills, and 7) improved productivity by standardizing site processes.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.5C
/
pp.187-202
/
2011
In this Application Study based on the result of the Basic Study, the field test was performed to compare the quality of Ready-mixed shotcrete with that of the existing field mix shotcrete, and the long-term durability was evaluated as tunnel supporting. The plant manufacturing system was also designed to produce standardization materials, and the prototype products were produced with that system. The All-in-one silo mixer was designed and the field construction system using the All-in-one silo mixer was proposed to be most effectively applied Ready-mixed Shotcrete in construction fields. And the application of Ready-mixed Shotcrete was confirmed that more superior to the field mix Shotcrete by evaluating the Constructability and Economics.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.