Development of Ready-mixed Shotcrete II : Application Study (레디믹스트 숏크리트 개발 II : 적용성 평가)

  • Ma, Sang-Joon;Kim, Dong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5C
    • /
    • pp.187-202
    • /
    • 2011
  • In this Application Study based on the result of the Basic Study, the field test was performed to compare the quality of Ready-mixed shotcrete with that of the existing field mix shotcrete, and the long-term durability was evaluated as tunnel supporting. The plant manufacturing system was also designed to produce standardization materials, and the prototype products were produced with that system. The All-in-one silo mixer was designed and the field construction system using the All-in-one silo mixer was proposed to be most effectively applied Ready-mixed Shotcrete in construction fields. And the application of Ready-mixed Shotcrete was confirmed that more superior to the field mix Shotcrete by evaluating the Constructability and Economics.

A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction- (고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-)

  • Song Young-Suk;Lim Hyung-Chul;Choi Yun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.127-134
    • /
    • 2001
  • Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.

  • PDF

Acquisition of Data of Equipments on Shop Floor Using Interface Between Various Equipments (다양한 생산 설비와의 인터페이스를 고려한 설비정보 수집)

  • Nam, So-Jeong;Lee, Jai-Kyung;Lee, Sung-Woo;Park, Jong-Kweon
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.35 no.2
    • /
    • pp.149-156
    • /
    • 2011
  • There is much information of equipment in shop floor because the manufacturing processes are different as the equipment within the manufacturing process is varied. To provide effective process information to MES and other production systems, the DAS requires an equipment monitoring system that takes into account the characteristics of the equipment on the shop floor. In this study, we proposed some methods for collecting the required information about various equipments on a shop floor. The equipments such as CNC can be interfaced with the DAS by using a PLC-based method and a sensor-based interface board can be used to interface general equipments. The proposed methods can be used to collect information on the shop floor in real-time. Moreover these methods are very adaptive and can be easily modified according to the changes made to the shop floor. The information about a real shop floor acquired by employing these methods is saved in a database and the can be provided to a supervisor and MES so that they are aware of the status of the shop floor.

반도체 공정 실시간 APC 통합 시스템

  • Yun, Myeong-Sik
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2013.08a
    • /
    • pp.83.2-83.2
    • /
    • 2013
  • 정교한 생산 공정에 있어서 공정의 갑작스런 변동(Shift)나 점진적인 변화(Drift)에 대해서 얼마나 적절하게 대응하느냐는 생산 제품의 품질과 수율에 상당한 영향을 미친다. 이에 본 과제에서는 반도체 생산 공정에 따른 측정 결과를 분석하여 최상의 공정조건(Recipe)를 유지하기 위한 알고리즘을 개발하고, 개발된 알고리즘의 유효성 판단을 위한 시뮬레이션 툴을 개발하였다. 또한, 다양한 현장 조건을 충족할 수 있도록 사용자 임의의 데이타 구조를 정의하고, 기준 정보를 등록할 수 있도록 유연성이 부여된 사용자 UI를 개발하였다. 생산 설비로부터 공정 관련 데이타를 수집하고, 측정 설비로부터 계측데이타를 수집한 후, 사용자가 설계한 APC 로직에 의해 실시간 공정 제어가 가능한 시스템을 개발하여, 현장 엔지니어가 다양한 APC 로직을 설계하고 구현할 수 있도록 하였다. 현장 엔지니어용 툴은 Graphical Workflow 형태로 개발되었으며, 엔지니어가 복잡한 프로그래밍을 하지 않아도 직관적으로 설계/구현할 수 있도록 하였다. 분석을 위한 리포트 화면을 이용하여, 공정/측정 데이타에 대한 조회기능을 제공하고, Trend, Pair, X-bar 등의 다양한 분석용 챠트를 이용하여 파라미터 분석 기능을 제공하였다. 본 과제에서 증착 장비용 제어 알고리즘을 적용하여 테스트하였으며, 30% 이상의 Cpk 개선 효과를 얻을 수 있었다.

  • PDF

TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR) (공동주택 마감공사 TACT 기법 생산성 관리 - Productivity Achievement Ratio를 활용한 생산성 관리 -)

  • Joo, Seonu;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.36-48
    • /
    • 2015
  • To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.

생산통제용 일정계획 편집기(Gantt Chart Editor)의 객체지향적 설계

  • 김승권;김선옥;홍윤호;이준열
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.165-173
    • /
    • 1993
  • 생산일정계획 수립 시스템을 통하여 수립된 생산계획을 현장에서 실천하고자 할 때, 일반적으로 계획수립 후 얼마 지나지 않아 계획수립시 고려할 수 없었던 기계고장 또는 자재조달 지연, 작업 지체, 주문 취소 등과 같은 요인으로 생산일정을 계획대로 실천할 수 없는 경우가 발생한다. 이런 상황에서는 기존의 생산계획을 계속 실행할 수 없으므로 손쉽게 대처할 수 있는 방안이 필요하다. 본 연구에서는 일정계획편집기를 이러한 문제점을 해결할 수 있는 대안으로 제시한다. 일정계획편집기를 GUI, 객체지향적 설계를 통해 구현하므로서 이상상황과 일정변동에 효과적으로 대처할 수 있다. GUI환경을 통해, 수립된 생산일정과 이상상황, 작업진척, 수행도 등을 화면에 Gantt 도표로 표시해 주어 현장 파악을 용이하게 하고 작업추가, 삭제, 작업시간 변경, 대체공정으로의 이동 등의 편집을 mouse와 icon을 이용, 편리하게 수행할 수 있다. 편집작업시 자동으로 생산일정의 타당성을 만족시켜 줄 수 있는 지능화를 위한 기초 단계로서 객체지향설계를 이용한 규칙기반 일정계획 편집기를 설계한다.

  • PDF

An Implementation of Point of Production Management System using Wireless Network (무선 네트워크를 이용한 생산시점관리시스템)

  • Seo, Jeong Min;Song, Jeo;Lee, Sang Moon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2013.07a
    • /
    • pp.399-400
    • /
    • 2013
  • POP(Point of Production) 시스템은 제조현장에서 발생되는 생산 정보를 실시간으로 수집, 분석하여 현장의 보고 체계를 정형화 시켜준다. 또한 실시간 분석 정보를 통행 생산 이후의 과정(품질관리, 유통, 판매, 생산계획 등)을 기획하고 관리하는데 많은 도움을 준다. 즉, 제조 환경 변화에 따른 생산 지휘 체계를 통제하는 운영 환경을 조성하여 생산성 향상에 크게 기여한다. 이는 특힝 단위 공정의 생산량, 공정의 정확한 측정과 그에 따른 소요시간을 감축하는 장점이 있다. 본 논문에서는 기존의 C/S환경이 아닌 무선인터넷을 이용한 POP시스템을 제시한다.

  • PDF

An Evaluation of Workload Limited Order Release Strategies considering Planning Stage in a Job Shop (생산계획 단계를 고려한 Job Shop 환경에서 Order Release 정책의 유효성에 관한 연구)

  • 최병대
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.04a
    • /
    • pp.194-198
    • /
    • 1999
  • Order Review/Release(ORR) 시스템은 생산계획 시스템과 작업현장간의 연결고리로서, 작업현장으로의 작업투입을 조절하여 작업현장에서의 체류시간과 공정중재고, 리드타임의 변동을 줄여주는 역할을 한다. 그러나, 지금까지의 ORR에 관한 연구들은 ORR의 유효성에 관하여 명확한 결론을 내지 못하고 있다. 일부는 ORR이 작업의 전체 리드타임을 증가시키는 악영향이 있음을 주장하고, 일부는 ORR을 도입함으로써 작업현장에서의 리드타임과 공정중재고가 줄어들고, 안정화될 수 있다고 주장한다. 본 연구는 어떠한 환경에서 Order Release 정책을 도입하는 것이 시스템의 성능향상에 기여할 수 있는 지 확인하는 것을 목적으로 하고, 가상의 Job Shop을 대상으로 시뮬레이션을 수행하였다. 작업장가동률 수준과 생산계획 단계에서의 계획오더 이송간격을 환경분수로 설정하고, 작업현장의 부하를 고려하여 작업투입을 통제하는 다섯 가지 Order Release 정책과 세 가지 우선순위 규칙을 적용하여 실험하였으며, 리드타임, 납기, 공정중재고 등과 관련된 8가지 척도에 대해 각 정책을 평가하였다. 그리고, 계획시스템의 부하평준화 기능이 존재할 때, Order Release 정책의 도입으로 인한 효과가 더 크다는 기존의 연구결과를 검증하기 위해, 부하평준화를 적용하였을 때 Order Release를 통제하지 않는 정책과 통제하는 정책간의 성능향상 차이가 있는지를 확인하는 실험을 수행하였다. 실험결과, ORR 보다는 우선순위규칙이 시스템의 성능을 결정하는 주요 통제정책으로 밝혀졌다. 그러나, 생산계획시스템에서 1주 간격으로 계획오더를 이송할 때는 Order Release 방법을 적용하여 작업현장에서의 평균 리드타임과 리드타임의 변동, 공정중재고가 줄어드는 결과를 보였고, 가동률 수준이 높을수록 ORR 방법간의 차이가 크게 나타났다. 그리고 부하평준화 기능은 Order Release 정책의 유효성에 별 영향을 주지 않는 것으로 나타났다. 결론적으로, Order Release 방법은 우선순위규칙간의 성능차이를 줄이거나, 대체할 수 통제 기법이라기보다는 우선순위규칙을 보완하여 공정중재고와 작업현장에서의 리드타임, 리드타임의 편차를 줄여주는 역할을 한다고 볼 수 있다. 그리고, 계획시스템이 존재하여 계획오더가 일정기간간격으로 이송되는 환경에서 특히 유용하다는 결론을 얻었다.

  • PDF

건설재해와 정리정돈

  • Hong, Jong-Min
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.14
    • /
    • pp.44-48
    • /
    • 1994
  • 건설현장의 정리정돈이 재해 예방과 생산성 향상에 도움을 줄 수 있는 사항을 근거를 들어 증명함으로써 건설현장에서 정리정돈에 소요되는 비용이 결코 헛된 투자가 아닌 사실을 인식하여 정리정돈을 유도하고 재해예방 효과와 생산성 향상 효과를 동시에 얻고자 하는 데 본 연구의 목적이 있다.

  • PDF

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.