• Title/Summary/Keyword: 해상 풍력발전단지

Search Result 108, Processing Time 0.021 seconds

Optimal Design of Power Grid and Location of Offshore Substation for Offshore Wind Power Plant (해상풍력발전단지의 전력망과 해상변전소 위치에 대한 최적 설계)

  • Moon, Won-Sik;Won, Jong-Nam;Huh, Jae-Sun;Jo, Ara;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.7
    • /
    • pp.984-991
    • /
    • 2015
  • This paper presents the methodology for optimal design of power grid for offshore wind power plant (OWPP) and optimum location of offshore substation. The proposed optimization process is based on a genetic algorithm, where the objective cost model is composed of investment, power loss, repair, and reliability cost using the net present value during the whole OWPP life cycle. A probability wind power output is modeled to reflect the characteristics of a wind power plant that produces electricity through wind and to calculate the reliability cost called expected energy not supplied. The main objective is to find the minimum cost for grid connection topology by submarine cables which cannot cross each other. Cable crossing was set as a constraint in the optimization algorithm of grid topology of the wind power plant. On the basis of this method, a case study is conducted to validate the model by simulating a 100-MW OWF.

A Study on the Adequate Capacity of Substation Transformer for Offshore Wind Farm (해상풍력발전단지의 해상변전소 변압기 적정 용량에 관한 연구)

  • Moon, Won-Sik;Jo, Ara;Huh, Jae-Sun;Bae, In-Su;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.8
    • /
    • pp.83-89
    • /
    • 2015
  • This study suggests the methodology to decide the number and adequate capacity of substation transformer in a large-scale offshore wind farm (OWF). The recent trend in transformer capacity of offshore substation is analyzed in many European offshore wind farm sites prior to entering the studies. In order to carry out the economic evaluation for the transformer capacity we present the cost models which consist of investment, operation, and expected energy not supplied (EENS) cost as well as the probabilistic wind power model of wind energy that combines the wind speed with wind turbine output characteristics for a exact calculation of energy loss cost. Economic assessment includes sensitivity analysis of parameters which could impact the 400-MW OWF: average wind speed, availability, discount rate, energy cost, and life-cycle.

Study on Combined Use of Inclination and Acceleration for Displacement Estimation of a Wind Turbine Structure (경사 및 가속도 계측자료 융합을 통한 풍력 터빈의 변위 추정)

  • Park, Jong-Woong;Sim, Sung-Han;Jung, Byung-Jin;Yi, Jin-Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.1-8
    • /
    • 2015
  • Wind power systems have gained much attention due to the relatively high reliability, good infrastructures and cost competitiveness to the fossil fuels. Advances have been made to increase the power efficiency of wind turbines while less attention has been focused on structural integrity assessment of structural sub-systems such as towers and foundations. Among many parameters for integrity assessment, the most perceptive parameter may be the induced horizontal displacement at the hub height although it is very difficult to measure particularly in large-scale and high-rise wind turbine structures. This study proposes an indirect displacement estimation scheme based on the combined use of inclinometers and accelerometers for more convenient and cost-effective measurements. To this end, (1) the formulation for data fusion of inclination and acceleration responses was presented and (2) the proposed method was numerically validated on an NREL 5 MW wind turbine model. The numerical analysis was carried out to investigate the performance of the propose method according to the number of sensors, the resolution and the available sampling rate of the inclinometers to be used.

Study of the Spatial Location Analysis for Domestic Offshore Wind Farm (국내 해상풍력 발전단지 입지 분석 연구)

  • Kim, Dong-Hwi;Lee, Yong-Jun;Ryu, In-Ho;Seo, Dae-Rim
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.504-511
    • /
    • 2010
  • After facing the fact such as fossil-fuel depletion, global warming, the Kyoto Protocol coming into force of mandatory reductions of carbon dioxide, the world is actively promoting the spread of the solar, wind, tidal, geothermal and other clean renewable energy technology development. Among them, wind power is the only alternative energy to secure a comparable price competition with fossil fuels because cheaper price power generation than other renewable energy when creating large-scale wind farm, thus wind power is the fastest growing industries in the world in the renewable energy field. Especially the offshore wind power is showing rapid growth as most of the wind power sector because of less changes of wind speed, no restrictions of land use, and large-scale development of offshore wind power. In this paper, the field of site selection and spatial location analysis techniques for development of large-scale offshore wind farm are discussed primarily. This paper shows overview of offshore wind power and establishment procedure for development of offshore wind farm.

  • PDF

Optimum Macro-Siting for Offshore Wind Farm Using RDAPS Sea Wind Model (RDAPS Sea Wind Model을 이용한 해상풍력발전단지 최적 Macro-Siting)

  • Lee, K.H.;Jun, S.O.;Park, K.H.;Lee, D.H.;Park, Jong-Po
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.286-290
    • /
    • 2011
  • This paper introduces the optimum macro-siting of a potential site for an offshore wind farm around Jeju Island using the RDAPS sea wind model. The statistical model was developed by analyzing the sea wind data from RDAPS model, and the meso-scale digital wind map was prepared. To develop the high resolution spatial calibration model, Artificial Neural Network(ANN) models were used to construct the wind and bathymetric maps. Accuracy and consistency of wind/bathymetric spatial calibration models were obtained using analysis of variance. The optimization problem was defined to maximize the energy density satisfying the criteria of maximum water depth and maximum distance from the coastline. The candidate site was selected through Genetic Algorithm(GA). From the results, it is possible to predict roughly a candidate site location for the installation of the offshore wind jam, and to evaluate the wind resources of the proposed site.

  • PDF

Obstacle Avoidance System for Autonomous CTVs in Offshore Wind Farms Based on Deep Reinforcement Learning (심층 강화학습 기반 자율운항 CTV의 해상풍력발전단지 내 장애물 회피 시스템)

  • Jingyun Kim;Haemyung Chon;Jackyou Noh
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.19 no.3
    • /
    • pp.131-139
    • /
    • 2024
  • Crew Transfer Vessels (CTVs) are primarily used for the maintenance of offshore wind farms. Despite being manually operated by professional captains and crew, collisions with other ships and marine structures still occur. To prevent this, the introduction of autonomous navigation systems to CTVs is necessary. In this study, research on the obstacle avoidance system of the autonomous navigation system for CTVs was conducted. In particular, research on obstacle avoidance simulation for CTVs using deep reinforcement learning was carried out, taking into account the currents and wind loads in offshore wind farms. For this purpose, 3 degrees of freedom ship maneuvering modeling for CTVs considering the currents and wind loads in offshore wind farms was performed, and a simulation environment for offshore wind farms was implemented to train and test the deep reinforcement learning agent. Specifically, this study conducted research on obstacle avoidance maneuvers using MATD3 within deep reinforcement learning, and as a result, it was confirmed that the model, which underwent training over 10,000 episodes, could successfully avoid both static and moving obstacles. This confirms the conclusion that the application of the methods proposed in this study can successfully facilitate obstacle avoidance for autonomous navigation CTVs within offshore wind farms.

Supervised Shutdown of an Off-shore Wind Farm to meet the Grid Code in a Storm-driven Situation (강풍 시 전력망 연계기준을 만족하는 해상풍력발전단지 강제종료 방법)

  • You, Yue;Kim, Yeon-Hee;Zheng, Tai-Ying;Kang, Yong-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.7
    • /
    • pp.1299-1304
    • /
    • 2011
  • A wind turbine (WT) should be shut down as fast as possible to minimize its own damage in a storm-driven situation. Shutdown of a large wind farm requires a power grid to have a ramp-up capability large enough to balance between generation and consumption of electrical energy. This paper proposes a supervised shutdown algorithm of a wind farm to meet a required ramp-down rate in a grid code in the case of a storm-driven situation. The information on the speed and the direction of wind is measured at a wind mast (WM) installed around a wind farm. If the wind speed exceeds a cut-out speed, the number of WTs to be shut down simultaneously is decided to meet a required ramp-down rate of a grid-code. Arrival times to each WT from the WM are calculated and sorted in the order of time. Then a sequence of groups is generated. The shutdown start/end times of each group are decided to avoid superposition between adjacent two groups. The performance of the proposed shutdown algorithm is verified under various storm scenarios. Results indicate that the proposed algorithm can not only protect the wind farm in the case of a storm-driven situation but also meet the required ramp-down rate. In addition, the algorithm can produce more energy than that of a conventional shutdown algorithm.

A Study on the Selection of Target Ship for the Protection of Submarine Power Cable (해저 동력케이블 보호를 위한 대상 선박 선정에 관한 연구)

  • Lee, Yun-sok;Kim, Seungyeon;Yu, Yungung;Yun, Gwi-ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.6
    • /
    • pp.662-669
    • /
    • 2018
  • Recently, the installation of submarine power cables is under consideration due to the increase of electric power usage and the development of the offshore wind farm in island areas, including Jeju. In order to protect power cables installed on the seabed, it is necessary to calculate the burial depth based on the characteristics of anchoring, dragging and fishing, etc. However, there is no design standard related to the size of target ships to protect the cables in Korea. In this study, we analyzed the design standards for the protection of domestic submarine pipelines similar to submarine cables, and developed the risk matrix based on the classification by emergency anchoring considering the installation environment, then designed the size of target ships according to the cumulative function scale by ship size sailing through the sea concerned. Also, we linked marine accident conditions, such as anchoring, dragging, etc. and the environmental conditions such as current, sea-area depth of installation etc. to the criteria of the protection of submarine cable, and examined the size of specific target ships by dividing the operating environment of ships into harbor, coastal and short sea. To confirm the adequacy and availability of the size of target ships, we verified this result by applying to No. 3 submarine power cables, which is to be installed in the section from Wando to Jeju Island. This result is expected to influence in the development of a protection system for submarine cables and pipelines as well as the selection of anchor weight according to the determination of burial depth.