• Title/Summary/Keyword: 합동능력 관리체계

Search Result 4, Processing Time 0.017 seconds

A Proposal for Establishing and Applying of the Joint Capability Management System (JCMS) (합동능력 관리체계 구축 및 활용 방안)

  • Lee, Jin-Woo;Lim, Byung-Youn;Lee, Tae-Gong;Park, Byung-Jin;Choi, Hangjoon
    • Journal of Information Technology and Architecture
    • /
    • v.11 no.2
    • /
    • pp.187-199
    • /
    • 2014
  • The DoD of United State, the MoD of United Kingdom and NATO have developed and implemented not only the concepts of joint capability but also management system for the joint capability to respond the future uncertain operations effectively. The resources of the DoD in United State have been efficiently planning, programming, budgeting, execution and evaluation using the PPBEE system which developed based on the concept of joint capability. The joint capability of the DoD has been managing through the JCAMS (Joint Capability Area Management System) which constructed based on JCA, UJTL and so on. Recently the MND of Korea eager to try introducing concept of the JCMS and developing the JCMS like the JCAMS of DoD for the future joint operation in the uncertain environment. We propose the holistic mechanism to develop the JCMS (Joint Capability Management System) of MND which can implement during the constructing the JCMS of Korea efficiently and effectively.

개인정보보호 국제표준화 분석

  • YOUM, HeungYoul
    • Review of KIISC
    • /
    • v.25 no.4
    • /
    • pp.6-10
    • /
    • 2015
  • 기업에 의해 수집되어 관리되고 있는 개인정보가 유출되는 사고가 빈번하게 발생하고 있어서 기업의 개인정보보호 대응능력을 강화하기 위한 관리체계의 도입이 요구되고 있다[1,2]. 국제표준화위원회/전기위원회 합동위원회 1의 정보보호 기술연구반 아이덴터티 관리 및 프라이버시 작업반 (ISO/IEC JTC 1/SC 27/WG 5)에서는 기업을 위한 개인정보보호 원칙을 제시하고, 개인정보보호 위험 평가 지침을 제시하며 개인정보보호를 위한 각종 통제를 제시하기 위한 국제 표준화 작업을 수행하고 있다[18]. 정보보호관리체계 작업반(WG 1)에서는 2013년부터 정보보호관리 요구사항을 다룬 ISO/IEC 27001[6]을 이용해 여러 섹터에 적용되는 정보보호관리체계 구축을 위한 요구사항에 대한 국제표준화를 추진하고 있다. 본 논문에서는 작업반 1과 작업반 5에서 수행되고 있는 개인정보보호 관련 국제 표준화 활동의 동향을 살펴보고, 개인정보보호 관리체계 구축을 위한 국제 표준의 배열을 제시한다.

Decision Making Support Tool for Master Architect in Design Development Phase of Mega-Project (메가프로젝트 기본설계단계의 Master Architect 의사결정지원 도구)

  • Cho, Dong-Hyun;Koo, Kyo-Jin;Park, Sung-Chul;Kim, Jong-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.202-206
    • /
    • 2008
  • Recently, as high level of interest for the city regeneration, large-scale projects are planned or being performed such as reconstruction project. These mesa-projects have different characteristics from a single project in the design phase. It is a number of companies involved in design phase of mega-project and principal decision-making entity manage the project from the initial stage of an ongoing business by coordinating an opinions between design companies. The absence of a decision making support system reflected those characteristic causes a variety of problems such as a loss of cost and schedule. Therefore the final object of this paper is to propose a decision making support tool and system interface.

  • PDF

I3A Framework of Defense Network Centric Based C2 Facilities (국방 NC 기반 C2 시설 I3A Framework)

  • Kim, Young-Dong;Lee, Tae-Gong;Park, Bum-Shik
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39C no.8
    • /
    • pp.615-625
    • /
    • 2014
  • Ministry of National Defense, MND, established a "Master Plan of Military Facility" in 2010 based on the defense reform to prepare for future war. It was a plan for consolidating small military facilities into battalion units, reflecting on and preparing for the needs of various changes in defense environment as well as balanced growth of ROK Army, Navy, and Air Force. However, to move forward with "Military Facility Master Plan," current design criteria for military facilities need to be revised to be enacted due to numerous calculation errors in facility footprints because of the absence of a sound facility criteria. Because the future war environment will be changed from Platform basis to Network Centric Warfare basis, Command & Control capability of C4I systems is getting more important. Therefore, Successful mission accomplishment can be secured by convergence of facility and military Information Technology(IT). So, MND should quickly prepare for the operational guidance, design criteria and policy that are suitable for Network Centric Warfare accomplishment, and implement infrastructure of IT and installation of C2 facility in conjunction with consolidation movement of military facilities. In this paper, we propose the defense I3A framework in order to solve this problem.