• Title/Summary/Keyword: 할증

Search Result 67, Processing Time 0.017 seconds

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

A Study on Improving Architect Property Insurance for Safety Accidents of Building (건축물 안전사고에 대비한 건축사 손해보험 개선 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.32-40
    • /
    • 2019
  • This study analyzed operating condition and the problems of damage compensation insunace (property insurance) for qualified architect and derived some suggsetions for improvement. The Certified Architects Act requires all building design and construction supervision to buy property insurance. This study proposes following suggestions to solve problems of current architect property insurance. Firstly, we need to increase the insurance purchasing rate of damage compensation insurance for qualified architect. It is necessary to clearly specify the matters concerning the submission of insurance policies by the architects, which is currently carried out by the Minister's official letter, in the form of official announcement. Secondly, proper insured amount should be adjusted. In order to insured substantial compensation capacity, total amount of insurance should be enlarged. Thirdly, the insurance period should be extended to one year after completion of building to allow compensation for accidents due to design negligence. Generally, the design defect can mostly be identified within one year after completion. Fourthly, insurance coverage should be extended. In the long run, it is essential to enlarge the scope of the security not only to property damage but also to human losses. Finally, an accident record sharing system should be established among insurance companies, so that proper insurance premiums or discounts can be made based on the system.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Development of Driving Evaluation model of a truck for UBI (화물자동차 UBI 도입을 위한 운행 평가 모델 구축)

  • Yoo, GeonGeun;Won, Jong-Un;Lee, Suk;Kwon, YongJang
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.12
    • /
    • pp.469-481
    • /
    • 2016
  • Freight car accidents occur frequently and have a high mortality. In this reason, freight can insurance fee has been raised drastically. But speeding and overloading of trucks are still not decreased. We need to consider a measure about voluntary safe driving of truck drivers. We select UBI(Usage-Based insurance) as a measure for safe driving of truck drivers. UBI is a car insurance system and insurance fee is flexible. If vehicle drivers drive safely, insurance fee is discounted. The other way, if vehicle drivers drive dangerously, insurance fee is increased. In now, very high insurance fee for truck drivers, UBI is a effective way for leading a truck driver to safe driving. The most important thing in UBI is to evaluate truck driver rationally and accurately. In this paper, we select the reasons of truck accidents and develop driving evaluation model from multiple regression analysis and correlation analysis with accident reasons and truck accidents.

A study on the Logical Reclassification of Parcel Service Tariffs (택배요금기준의 합리적 재설정에 관한 연구)

  • Cho, Yoon-Sung;Lee, Tae-Hwee
    • Journal of Distribution Science
    • /
    • v.10 no.5
    • /
    • pp.45-55
    • /
    • 2012
  • In Korea, the parcel delivery service was launched officially in 1992, and the market has grown to 13.2 billion units, or 3.5 trillion won, as of 2011. The service companies accept small packages under 30 kg and deliver them on the next day in most domestic areas. This service plays an important role in business and personal activities. The parcel service companies have themselves designed the tariff for the delivery service based on two criteria: weight and the sum of three side lengths. Further, the tariff is graded in steps of three or four rate structures based on size (small, medium, large, and extra-small). However, the basic freight rate is generally decided according to the cargo's weight or measurement size, and an extra rate is added according to some factors (handling, stowability, liability, and so on). The parcel service tariff adopted by the companies is illogically designed, and this study was carried out to assess the need for redesigning the tariff structure. The cargo volume cannot be logically reflected by three side lengths. For example, two parcels measuring 160 cm based on three side lengths may have different volumes, one measuring 0.152 cbm (53.33 cm × 53.33 cm × 53.34 cm) and the other 0.05 cbm (100 cm × 50 cm × 10 cm). A small package of less than120 cm (sum of three side lengths) may have a volume of as much as 0.064 cbm (40 cm × 40 cm × 40 cm). Sample comparison showed that 17% of medium-size parcels (based on the sum of three side lengths) are small-volume packages, 24% of large-size parcels are small- or medium-volume packages, and 40% of extra-big-size parcels are big- or under-size packages. Therefore, if parcel service companies rate their services for volume cargo based on the three side lengths standard, users may have to pay higher than normal rates, particularly because a large percentage of parcels are volume cargo. According to this study, the average weight per 1 cbm is less than 300 kg. Therefore, users face an increasing risk of paying higher than logical freight charges. Generally, transportation companies are called "public interest enterprises," and parcel service companies operate as postal services. Public interest enterprises must provide the delivery service to all customers without discrimination at a reasonable service level and logical service charges. Therefore, parcels service tariffs must be designed and adopted logically. In this study, freight theories and prior research findings were used to consider the importance of freight rates, and distortion of parcel service rates based on the three side lengths system was verified through regression analysis of a parcel sample and sample comparison. In conclusion, volume sizes based on three side lengths have a higher correlation to the rate level than does the sum of three side lengths. Further, compared to the sum of three side lengths, volume size has a higher correlation to cargo weight, which is the most basic factor determining transportation cost. Therefore, the existing parcel service tariff should be changed to weight- and volume-based rates, and the tariff must be graded in steps of 8 to 10 higher rate structures for a logical freight schedule based on service cost.

  • PDF

Development of an Appropriate Deposit-Estimation System for Restoration of Land-Use-Changed Forest Lands Using the Delphi Technique (델파이 기법을 활용한 적정 산지복구비 산출체계의 개발)

  • Koo, Kiwoon;Kweon, Hyeongkeun;Lee, Sang In;Kwon, Semyung;Seo, Jung Il
    • Journal of Korean Society of Forest Science
    • /
    • v.110 no.4
    • /
    • pp.630-647
    • /
    • 2021
  • We determined the current problem of the restoration deposit-estimation system, stipulated by the Mountainous Districts Management Act, using the Delphi technique. Consequently, we proposed a standard model for forest land restoration to derive a reasonable deposit-estimation system. With the result of the Delphi survey, the inappropriateness of land-use type and slope gradient classifications was shown; the insufficiency of standard works was a significant problem in the current system. A way to solve these problems was devised, to reorganize the current land-use type into the subject of the site. The specific subjects included the following: (i) to permit or report forest land-use change and temporary use of forest land, (ii) to report temporary use of forest land, (iii) to permit stone collection or sale for mineral mining, and (iv) to allow sediment collection. The current slope gradient subdivision into (a) θ<10°, (b) 10°≦θ<15°, (c) 15°≦θ<20°, (d) 20°≦θ<25°, (e) 25°≦θ<30°, and (f) θ≧30° and the reorganization of 17 standard works into 22 standard works were deemed as solutions, along with seven additional works. We developed 24 standard models for the forest land restoration project based on the aforementioned results. The deposits estimated by these models ranged from 34,185,000 (Korean) won to 607,403,000 won. If additional works, premiums, discounts, and supervision fees are added to the models, the deposit increases to an estimated 668,143,000 won subject to permission for stone collection or sale and mineral mining. Experts agree on the distribution of the restoration deposits estimated by these models at a high level in the Delphi survey. Our findings are expected to contribute to securing the appropriateness of the restoration cost deposited for the smooth performance of the vicariously executed restoration project.

A Study on the Timing and Method of the Final Price of Air Ticket in Computerised Booking System (인터넷 항공권 예약시스템에서의 '최종가격' 표시시기와 방법 - 2015년 1월 15일 EU사법재판소 C-573/13 판결을 중심으로 -)

  • Sur, Ji-Min
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.32 no.1
    • /
    • pp.327-353
    • /
    • 2017
  • The issue submitted to the Court of Justice on the merits of case C---573/13 originated from a claim brought in the context of a dispute between Air Berlin and the German Federal Union of Consumer Organisations and Associations. The challenge concerned the way in which air fares were displayed in Air Berlin's computerised booking system. The system was organised in such a way that, after selecting a date and a departure airport, one would find all possible flight connections in a summary table. However, the final price of the ticket was displayed only for the clicked connection, and not for all connections, thus preventing customers from being able to compare such price with the prices of other connections. The German Federal Union took the view that this practice did not meet the requirements laid down by Article 23 of Regulation (EC) No. 1008/2008, which requires transparency in the prices set for air services. This led the German State to bring an injunctive action to cause Air Berlin to discontinue said practice. The claim was upheld at both the application and appeal stage of the relevant proceedings. Subsequently, Air Berlin submitted the matter to the German Federal High Court, which decided to stay the proceedings and ask for a preliminary ruling from the Court of Justice as to 1. whether Article 23 of Regulation (EC) No. 1008/2008 must be interpreted as meaning that, during the computerised booking process, the final price to be paid must be indicated at all times when prices of air services are shown, including when they are shown for the first time; and 2. whether, during the computerised booking process, the final price must be indicated only for the air service specifically selected by the customer or for each air service shown. In a nutshell, the Court, by the here---discussed judgment determined that Article 23 of Regulation (EC) No. 1008/2008 must be interpreted as meaning that, in the context of a computerised air ticket booking system, the final price to be paid must be indicated not only for the air service specifically selected by the customer, but also for each air service in respect of which the fare is shown. Clearly the above judgment will place air companies under an obligation to update and adjust (when needed) their computerised ticket booking and payment systems, in consideration of the primary need for consumers to be aware at all times of the actual price payable for a ticket and be able to compare the price of the service selected with the prices for other air services in respect of which the fare is shown.

  • PDF