• Title/Summary/Keyword: 한국토지주택공사

Search Result 622, Processing Time 0.029 seconds

Proposal of PC Core System for Modular Housing (모듈러주택 적용을 위한 PC코어 시스템 제안)

  • Minjun, Kim
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.115-122
    • /
    • 2023
  • Modular construction is popular as a smart building system because it can shorten the construction period. This study proposed a precast concrete (PC) core system that can further shorten modular construction time. The system was developed and its structural performance was verified through computational analysis. The proposed PC core system is a complete PC construction method using dry bonding. The results of the study indicated that the proposed PC core system has structural stability and performance suitable for modular housing.

A Comparative Study on the Business and Financial Structure of Public Housing Agencies in Asia: Korea, Japan, Singapore and Hong Kong (아시아 공공주택기관의 사업특성 및 재무현황 비교 연구 : 한국, 일본, 싱가포르, 홍콩을 중심으로)

  • Kim, Yong-Tai;Park, Shin-Young;Cho, Seung-Youn
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.529-538
    • /
    • 2011
  • Recently, one of the critical issues in Korea is the huge debt and future role of Korea Land and Housing Corporation. In this regards, the purpose of this study is to get implications from other public housing agencies in Asian countries such as UR of Japan, HDB of Singapore and HA of Hongkong. The changes of housing policy since 1960s, business and financial structure of housing agencies in each nation are investigated and compared. As a result, some policy directions can be proposed as follows : review of current mass housing program, relaxing qualifications for public rental housing, promotion of urban renewal projects, reinforcing cooperation with private sector and local governments, more government's support to LH's financing and loss from businesses for public interests and re-evaluation of LH's debt. The contribution of this study is that suggestions to improve housing policy and to alleviate financial problem of LH are based on the actual conditions of public housing agencies in Asian countries where the housing policy implementation system is similar to Korea, not on the theoretical basis.

가스시설 기술기준

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.314
    • /
    • pp.73-84
    • /
    • 2016
  • 최근 기술개발과 건설시장의 다양화로 가스설비공사 분야의 성능기준과 제도 및 법령도 빠르고 다양하게 변하고 있다. 이에 따라 가스법령 및 KGS코드에 대한 이해와 올바른 시공방법, 기술기준 등을 현장에서도 쉽게 이해하고 편리하게 활용할 수 있도록 한국토지주택공사에서 일목요연하게 정리한 자료를 게재한다.

  • PDF

가스시설 기술기준

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.315
    • /
    • pp.45-48
    • /
    • 2016
  • 최근 기술개발과 건설시장의 다양화로 가스설비공사 분야의 성능기준과 제도 및 법령도 빠르고 다양하게 변하고 있다. 이에 따라 가스법령 및 KGS코드에 대한 이해와 올바른 시공방법, 기술기준 등을 현장에서도 쉽게 이해하고 편리하게 활용할 수 있도록 한국토지주택공사에서 일목요연하게 정리한 자료를 게재한다.

  • PDF

가스시설 기술기준

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.313
    • /
    • pp.57-68
    • /
    • 2016
  • 최근 기술개발과 건설시장의 다양화로 가스설비공사 분야의 성능기준과 제도 및 법령도 빠르고 다양하게 변하고 있다. 이에 따라 가스법령 및 KGS코드에 대한 이해와 올바른 시공방법, 기술기준 등을 현장에서도 쉽게 이해하고 편리하게 활용할 수 있도록 한국토지주택공사에서 일목요연하게 정리한 자료를 게재한다.

  • PDF

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

A Study on the Invigoration of BIM Design of Public Institutions : Focused on the Case of LH (공공기관의 BIM 설계 활성화 방안 연구: LH 사례를 중심으로)

  • Yang, Dong-Suk;Lee, Ji-Eun
    • Land and Housing Review
    • /
    • v.7 no.4
    • /
    • pp.291-297
    • /
    • 2016
  • Recently, foreign construction companies through the BIM-design have the effect of improving productivity and quality construction. On the other hand, domestic BIM-design is a little depressed because of lack of additional costs and professional personnel problem. The construction industry of recession, as reasons of construction market is downsizing. First must, enabling the design in public institutions, mainly BIM.. Design for BIM the construction sector, as well as an early stage actively introducing and spreading of the performance of him and domestic BIM technology should be able to promote the development. Public institutions in accordance with this study presented measures that can stimulate the BIM design on LH. To that end, the public agency's design were analyzed, and suggested the Improvement and Application of the four aspects for Modular Coordination BIM Design. Also, gradually formulate a "road map for public institutions applied design bim" in order to carry out the plans put forward and presented the expected effect of him. The proposed work was public institutions will be used as a pilot project in Korea Land Housing Corporation.

Analysis of Ventilation Impact in Multi-Family Residential Building Utilizing TOPSIS Method (다기준 의사결정방법을 이용한 공동주택 내 환기장치 종류별 효과분석)

  • Park, Kyung-Yong;Kim, Gil-Tae;Kim, Tae-Min;Ji, Won-Gil;Kwag, Byung-Chang
    • Land and Housing Review
    • /
    • v.13 no.3
    • /
    • pp.107-113
    • /
    • 2022
  • With increasing airtight building construction aimed at reducing energy consumption, indoor relative humidity is increasing which can lead to condensation and moisture damage in multi-family residential buildings. This has led to increased implementation of mechanical ventilation to control indoor moisture. However mechanical ventilation systems consume additional energy and generate noise. As this leads to occupant discomfort, it is necessary to select a ventilation system that addresses the energy and noise issues. This research measured the ventilation performance, energy consumption, and noise level of mechanical ventilation devices in multi-family residential buildings. TOPSIS, a multi-criteria decision making technique was used to determine appropriate ventilation strategies in addition to occupant ventilation system operation preference.

Flexible Unit Floor Plan of Off-Site Construction Housing Considering Long-Lasting Housing Certification System (장수명주택 인증을 고려한 OSC공법 주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun;Roh, Jeong-Yeol;Kwon, Soo-Hye;Kim, Seung-Mo
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.103-117
    • /
    • 2021
  • With the current rapid changes in population and technology, the long-lastig housing certification system is a means of prolonging the physical and functional lifespan of a building. The certification requires differentiation between the structure and infill elements to allow for variability and ease of repairs. This works well with prefabricated houses so this study investigated the possibility of applying the long-lastig housing certification requirements to apartment construction using off-site construction (OSC) methods focused on the installation of bathrooms (plumbing and toilet) that differ from the traditional wet method. This study examined three different sized floor plans at 22 m2, 46 m2, and a combined one resulting in 69 m2. The larger 69 m2 plan utilized a removeable non-load bearing wall to increase flexibility in the layout of the floorplan. The apartments are constructed of steel reinforced concrete composite columns on a 9 m × 10.5 m grid with integrated slabs. The exterior and interior infill walls are all non-load bearing with some containing plumbing. This separation of the structure and infill walls can help meet some of the criteria in the long-lastig housing certification, particularly with the ease of repairs. Technologies that facilitate the replacement of infill elements that contain plumbing and other building services can benefit the nation by reducing carbon emissions and therefore tax incentives should be introduced to increase the adoption of the proposed construction methods.

분당 신도시 9월 입주에 대비한 관계부처 종합점검 회의자료(건설부장관 주재, 관계부처 차관회의)

  • 한국주택협회
    • 주택과사람들
    • /
    • s.11
    • /
    • pp.88-92
    • /
    • 1991
  • 1. 이 자료는 최초입주하게 되는 2,500여세대 주민들에게 불편이 없도록 공공시설과 생활편익 시설을 차질없이 설치하고자, 분당현지에서 건설부장관이 주재하에 3월 8일 오후 2시 관계기관 차관회의를 개최한 내용임. - 회의일시: 1991.3.8 $14:00{\~}16:00$. - 회의장소: 분당신도시내 토지개발공사 건설현장사무소 . - 참석: 12개기관 국무총리 행정조정실장 경제기획원차관 내무부차관 교육부차관 동력자원부차관 체신부차관 환경처차관 철도청장 경기도지사 서울특별시 부시장 경기도교육위 교육감 한국토지개발공사 사장. 2. 이번 회의에서는 다음 사항들을 중점 논의할 계획이다. - 분당신도시 건설사업의 종합적인 추진대책의 협의. - 최초 입주자에게 불편이 없도록 편익시설$\cdot$기반시설의 적기 설치. $\cdot$ 학교, 동사무소, 우체국, 파출소 등 필수 공공시설. $\cdot$ 도로, 상하수도, 난방 등 도시기반시설. $\cdot$ 병원, 상가 등 생활편익시설.

  • PDF