• Title/Summary/Keyword: 학교 BTL

Search Result 55, Processing Time 0.022 seconds

A research on remodelling of the laboratory of S high school of broadcasting for converting into specialized one in the section of broadcasting industry (방송 산업 분야의 특성화고등학교로 전환을 위한 S방송고등학교의 실험.실습실 리모델링에 관한 연구)

  • Oh, Seung-gyun;Lee, Myung-Eui;Lee, Yong-soon;Kim, Jinsoo
    • 대한공업교육학회지
    • /
    • v.34 no.1
    • /
    • pp.87-112
    • /
    • 2009
  • The aim of this research is to suggest the model of reconstruction and remodelling of S high school of broadcast for converting into a specialized one in the section of broadcast industry. The method of reconstruction of the laboratories by each department is as follows. First, the names of laboratories, ground plans, and perspective drawings are designed according to the principle of constructionism. Second, each department is recommended to install 7 laboratories. For the department of broadcasting facilities, a laboratory of processing broadcasting machines, a laboratory of broadcasting machines, and a laboratory of screen picture machines are needed. For the department of broadcasting, electricity, and communication, a laboratory of image and sound edition, a laboratory of broadcasting and communication, a laboratory of broadcasting system, and a laboratory of stage illumination. For the department of broadcasting stage construction, a laboratory of broadcasting stage building, a laboratory of broadcasting stage design, a laboratory of broadcasting stage decoration and etc. Third, an office room is designed by department in the form of seminar room and places for practice is formed by department to be a laboratory. Fourth, a room for industrial-educational cooperation is installed by department, by which education of industrial-educational cooperation is carried out harmoniously. And one example of a remodeled laboratory by one department is shown with laboratory name, ground plan, perspective drawing, and running method. Especially employment of teachers working both school and business, professional club which is concerned with broadcasting technique, and attraction of enterprise in school is suggested as important elements to manage broadcasting laboratories efficiently. Finally, it is desirable for us to attract private capital, that is, Build-Transfer-Lease(BTL) because much budget is required for purchasing the broadcasting equipments and remodelling the laboratories to succeed as specialized high school on broadcasting section.

A Study on the Application of Criteria of the Indoor Environment through the Case of Green Building Certification Criteria for School (사례분석을 통한 학교건축 친환경 인증기준의 실내환경 평가항목 적용현황에 관한 연구)

  • Eun, So-jin;Lee, Jong-kuk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.1
    • /
    • pp.23-31
    • /
    • 2010
  • Recently, there are effects such as commercial investment and introducing new technology by introducing a BTL project. As a result, School's conditions are getting better and Numbers of certified schools are increasing, because the Green Building Certification Criteria was created in 2002 and expanded to schools in March, 2005. But the certificated schools just get the minimum score for certificate level 'good' about 65 points and there is no certificated school level 'very good'. The users of school stay in long time in the facility cause of the unique function of school. It means Indoor Environment Quality Criterion of the school is very important than any other criteria. Therefore, this study aims to analyze the indoor environment factor for the plan of the certificated school by green building rating systems. And this study also wants make the basement of a substantial technical application and development of the criteria in the plan for sustainable green school.

A Study on Application of Performance Warranty Contract to Building Construction (성능보증계약제도의 건축분야 적용 방안에 관한 연구)

  • Ko, Hyun;Kim, Kyung-Hwan;Lee, Youn-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.687-690
    • /
    • 2007
  • This study is a basic research on looking onto bringing performance warranty contract into the country, to consider the usage in architecture which it is usually used on road pavement in developed countries. The study will also apply performance warranty contracts on public private partnerships through examination and analysis of various matters which will lead to globalization of the korean architecture industry, the increase of quality of result, better convenience for the orderer, the decrease of cost, and the acceleration on research for technical development.

  • PDF

Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF

Facilities Standards by Local Education Offices and Characteristics of Spatial Composition Applied by Changes in the Construction Documents Phase - Focused on Schools in Gyeonggi, Deajeon and Chungcheong Districts - (교육청별 시설기준과 실시설계시 변경 적용된 공간구성의 특징 -경기, 대전, 충청지역 학교를 중심으로-)

  • Park, Im-Ho;Jung, Jin-Ju
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.18 no.4
    • /
    • pp.57-67
    • /
    • 2011
  • In this study, it did comparative analysis on the arrangement, construction and size of rooms applied in the early design stage at the time of prize-winning with the changed ground plans in the final design of those prize-winning works in design contests and BTL hold since 2007 for middle and high schools in Gyeonggi, Daejeon, Chungcheong regions. Through the analysis, this study intends to present those matters to be changed in the facilities standards of each local education office so that it can be referred to the assessment of spatial construction and proper size being planned in the future for middle and high schools and reflected flexibly in consideration of various educational conditions and characteristics of schools by regions. Furthermore, it has the objective to play a part for the establishment of much better environment of educational facilities by provision of reference materials to those matters being changed into proper ones not into the minimum ones of the school facilities standards as the national level. For case analysis, it analyzed various rooms classified by necessary spaces. Since names of rooms and spatial constructions to constitute facilities are different from each local education office and also the analysis by each room has some limitation in the changes and improvement of rooms for a wide range, it proceeded with detailed classifications of school building facilities by each necessary space.

  • PDF