• Title/Summary/Keyword: 하자보수

Search Result 103, Processing Time 0.02 seconds

아파트 하자 보수에 대한 견해-아파트 하자 보수 책임 기간 지났어도 건설사 책임

  • An, Jong-Seok
    • 주택과사람들
    • /
    • s.201
    • /
    • pp.102-103
    • /
    • 2007
  • 아파트 하자 담보 책임 기간이 지났어도 부실 시공에 따른 아파트 하자 보수 비용은 아파트 건설.분양 업체와 보증 회사에 존속된다는 법원의 판결이 나왔다. 하자 보수 비용에 따른 잇따른 소송으로 책임 소재가 불분명한 경우, 그 비용을 어떻게 해결해나가는지 실례를 들어 살펴보자.

  • PDF

A Study on use state of Defect Deposite based on Actual use data - focused on 3 years after moving in apartment complex - (실적자료에 기초한 공동주택 하자보수보증금 사용실태 분석연구 - 3년차 단지를 중심으로 -)

  • Seo, Deok-Seok;Choi, Jung-Hyun;Kim, Ok-Kyue;Park, Kang-Woo;Cho, Jae-Hun;Park, Jun-Mo;Kim, Kwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.81-88
    • /
    • 2010
  • Under the law of Management of Apartment Complexes, the Apartment Supplier should satisfy the demands of residents for the repair of defects found in Apartment Housing. But in the cost of defect repair, the expense of resident complaints is not included, and only the actual defect repair expense is counted. So in this study, the actual use state of defect deposits for 3 years after moving in is analyzed based on the actual use data of 39 apartment complexes. The study shows that more than 50% of defect repair deposits are spent to satisfy expenses arising from complaints by residents. This is not only caused by irrational demands of residents, but also by the adoption of a stopgap policy by Apartment Suppliers.

A Study on the Completion procedure of Defect Repair for Apartment Housing (공동주택의 하자보수 종료 절차에 관한 연구)

  • Jun Woo-Taek;Nam Gyoung-Woo;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.283-286
    • /
    • 2002
  • Defect problems happening in the course of stressing quantity expansion of residence supply due to lark in maintenance are intensifying insincerity of construction business resulting from the psychological and economic damage, and there are many quarrel between residence suppliers and consumers. Because an apartment house's qualify is decided by various elements from design, to lotting-out, construction, and after-management, it is limited to express house capacity and standard to appraise defect objectively and quantifiably. The bound of defect and the period of guarantee expressed cleary in regulation of apartment house lack in quantifiable concept, and guarantee of defect is composed of a general concept. Therefore the big difference in opinion about defect and the bound of repair makes repair process slow and only to increase social costs. This research will give residence suppliers and consumers a resonable way to solve repair process during tile obliged period of guarantee since moving into from a process which are design, planing, construction, and after management. Furthermore it will present each business and role to conclude defect repair easily, so I planed to promote maintenance after conclusion of defect repair.

  • PDF

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building (공동주택 하자소송의 균열하자보수비 비교.분석 연구)

  • Kim, Beop-Su;Park, Jun-Mo;Choi, Jeong-Hyun;Seo, Deok-Seok;Kim, Ok-Kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.142-150
    • /
    • 2011
  • Defect dispute has been increasing to claim by condominium, in increasing to demand and concern in value, quality, and management of apartment building since 2000s. In this study, for checking property of cost in crack issue with precedure of lawsuit on defect, it is analyzing details about repairing cost of concrete crack defect that formed 77 percent of repairing cost. Futhermore, it is studying of composition of repairing cost and difference of repairing cost by repairing method. This is checking details that cost growth has a difference whether court accept a acceptable range of crack width, and repairing method and reinforcement work has to choose between a surface treatment method, a filling method and a injecting method. Meanwhile, it is considerable that disparity of repairing cost whether is a method of painting work.

Prediction Model Development of Defect Repair Cost for Apartment House according to Performance Data (실적 자료에 의한 공동주택 하자보수비용 예측모형 개발 방안)

  • Kim, Byung-Ok;Je, Yeong-Deuk;Song, Ho-San;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.459-467
    • /
    • 2011
  • The work of constructing apartment housing involves various fields of industry that are linked to each other, and is based on a design document prepared by multiple technicians and architects. Consequently, design errors, material flaws or faulty construction works can cause defects, which sometimes overlap with each other. Construction companies should repair any defects found in a completed building within a specified period of time, and to do this, should establish a business plan by efficiently predicting the cost of defect repair. As it is very difficult for companies to accurately predict the occurrence of defects, historical performance data is used as a base. For domestic apartment housing units, data on the cost of defect repair is insufficient, so there are hardly any methods that can be used to make precise predictions. Therefore, the intent of this study is to develop a model that can predict the cost of defect repair by supply type and area, based on historical performance data with ten years worth of post-completion.

Improvement Measures for the Defect Determination and the Application of Repair Method for Interlayer Cracks in Apartment Houses (공동주택 층간균열의 하자판정 및 보수공법 적용에 대한 개선방안)

  • Choi, Sangjin;Shin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.23-33
    • /
    • 2022
  • Cracks, which account for the largest proportion of defect lawsuits in apartment buildings, are not clear on the criteria for defect determination, so judgments about defects are mixed. Interlayer cracks, which account for most of the crack defect judgment amount, tend to be judged as defects regardless of the crack width or condition, and repair methods are mostly set uniformly. This starts from the problem that the standards of the Ministry of Land, Infrastructure and Transport and the Construction Appraisal Practice, which the courts use as standards, do not match. It is necessary to establish a defect determination standard that can be applied to all stakeholders through the amendment of laws and the revision of the Court Appraisal Practice. In addition, it is necessary to apply the crack repair method according to the width and condition of the interlayer crack. If the defect determination and the application of the repair method for cracks are rationalized, it could serve as an opportunity to change the current trend of defect disputes that rely only on litigation.

Analysis of Importance by Defect Type in Apartment Construction (공동주택 건축공사 하자유형별 중요도 분석)

  • Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.357-365
    • /
    • 2020
  • While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.

Improvement of Process and Calculation for Premium Rate in Maintenance Bond (하자보수보증보험의 프로세스 및 요율산정 개선)

  • Choi Min-Yong;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.366-369
    • /
    • 2004
  • Construction demands will become high. Defects liability is treating with a consumer on a defect. Maintenance bond is overlooking excessive responsibility of construction industry participants. This study classified the problem that are divided to systematic and internal matter. And this study presented an improvement proposal. An improvement proposal of a process may reduce a financial burden of contractors and sub-contractors. And improved rate decision will do additional consideration of the study result, so that it is appropriated a rate rationally.

  • PDF

A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.