• Title/Summary/Keyword: 하수관거공사

Search Result 16, Processing Time 0.028 seconds

Optimal Design of Drainage Pipe Considering a Distance of Storm Water Grate Inlet in Road (도로의 빗물받이 간격을 고려한 우수관거 최적설계)

  • Chang, Dong-Eil;Lee, Jung-Ho;Jun, Hwan-Don;Kim, Joong-Hoon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.5
    • /
    • pp.53-58
    • /
    • 2008
  • This study presented a design model optimizing a distance of inlet with drainage pipe laid under the gutter in road. When the distance of inlet changed, a basin for the gutter divided by the distance of inlet and the inflow coming into the gutter would be changed. In this case, the change of inlet distance causes the change of a diameter of drainage pipe and slope because of the change of capacity. Therefore, the optimization is needed to design the combination of them for the distance of inlet. Genetic Algorithm is used to determine the optimal combination of them. The conditions of road and the precipitation were assumed like a real and the range of inlet distance adopted $10{\sim}30\;m$ which has been introduced in domestic. This model presented the optimal distance of inlet and the combination of pipe and slope through the minimum cost. The result of the study is that the optimal distance of inlet is different from each slope of road and it can reduce about 20% of total cost for the distance of inlet.

Cost Allocation of River Water Quality Management Considering Development in Upper Basin and Total Pollution Load Management System (상류지역 개발과 오염총량관리제를 고려한 하천수질관리 비용분담 방안)

  • Yeo, Kyu-Dong;Kim, Gil-Ho;Jung, Young-Hun;Lee, Sang-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.822-822
    • /
    • 2012
  • 본 연구는 상류의 개발행위와 더불어 현재 수질관리의 기준이 되는 오염총량관리제를 대상으로 '규모의 경제'의 논리를 따른다는 가정 하에, 지자체간에 협조를 통해 비용을 절감하여 서로 혜택을 볼 수 있도록 상 하류 지자체와 중앙정부 등 관련 당사자들 간의 비용배분 방안을 도출하는 것을 목적으로 하였다. 이를 위해서 광주광역시에 위치한 평동산업단지와 영본B, 영본C를 대상으로 광주, 전남, 중앙정부를 이해당사자로 하여 협조적 상황 하에서 대상 비용배분 문제를 정의하였고, 협조적 게임이론에 근거한 SCRB법 및 샤플리법을 적용하여 비용배분 결과를 제시하였다. 우선 광주와 전남이 각각 삭감해야 할 오염량을 산정하고, 해당 삭감량 만큼 처리하기 위한 하수처리시설의 규모를 설정하였다. 또한 하수처리시설의 건설비와 하수관거 공사비, 유지관리비를 산정하였으며, 하수처리시설의 내용연수인 20년간의 총비용을 2010년 현재가치 기준으로 산정하였다. 상 하류 지자체가 공동으로 대처할 경우 20년간 총비용은 416,311.8 백만원, 개별로 대처할 경우 464,439.6 백만원이며, 공동 대처가 42,359.3 백만원이 절감되므로 양 지자체 모두 협조적 게임에 응할 기본배경은 성립되었다. SCRB법에 의한 지자체별 비용배분율을 산정 결과, 광주 74.24%, 전남 25.76%로 산정되었으며, 2001~2010년 하수도 세입현황을 기준으로 중앙정부의 지원 비율은 10년간 최소 23.98%, 평균 29.22%, 최대 34.17%로, 각각의 비율별로 중앙정부, 광주, 전남의 비용분담액을 도출하였다. 본 논문에서는 개략적으로 비용을 산정하였으나 오염총량관리 사업은 막대한 예산을 필요로 하기 때문에 실제로 두 지자체가 협조하여 비용배분을 하게 된다면 하수처리시설의 수질개선효과, 하수처리시설 위치선정, 사업비용 등을 세밀하게 분석해야 할 것이다. 본 논문은 오염총량관리제에서 제시하는 목표수질을 대상으로 하였으나, 지자체의 정책에 따라 친수활동 증대와 생태 자연환경 개선 등과 같은 수질개선에 따른 간접적인 효과를 고려하여 오염 총량관리제의 목표수질보다 더 나은 수질을 원할 수도 있을 것이다. 협조적 게임의 상황을 복잡하게 하여 해결 가능성이 낮아질 수 있으나, 수질개선에 의한 다양한 효과를 편익으로 산정할 수 있다면 이를 협조적 게임에 적용하여 전반적인 수질개선에 대한 지자체의 적극적 활동을 유도할 수도 있을 것이다.

  • PDF

A Study on the Risk Assessment Occurred Possibly in a Civil Project (토목공사에서 발생 가능한 리스크평가에 관한 연구)

  • Yoon, Yong-Kyun
    • Explosives and Blasting
    • /
    • v.29 no.2
    • /
    • pp.59-66
    • /
    • 2011
  • A variety of risks caused by natural, technological and biological hazards threaten a business continuity of an organization. Business continuity is very important issue for all organizations and its proper management may control success and failure of an organization. Business continuity plan (BCP) may be defined as a management process which provides a business continuity. BCP includes risk management, operational continuity plan, response/ recovery, exercise/study and crisis communication, etc. Risk management is a systematic method to identify, analyze, evaluate and treat emergency risks and risk assessment is composed of identifying, analyzing and evaluating emergency risks. Risk assesment is the first step for making BCP. In this study, risk assessment has been conducted for sewer laying project. Through assessing risks, 18 risks that may threaten the construction operation are identified and it is founded to be that high levels of risks which require treatment are 'collapse of excavation surface', 'breakage of ground infra-facilities', 'noise & dust dispersion' and 'rise of material costs'.

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.

Application of QUAL2K Model for Daejeon Tandongcheon, A Small Urban Stream and Evaluation of Terrace Land Constructed Wetland (도시 소하천, 대전 탄동천, 수질개선 대안 수립을 위한 QUAL2K 수질모델 구축과 제외지 인공습지공법 적용 효율 평가)

  • Yin, Zhenhao;Seo, Dongil
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.3
    • /
    • pp.192-199
    • /
    • 2013
  • The Tandong-cheon stream is a 7.4 km long small urban stream that passes through Daeduk Science Town in Daejeon Korea. Despite the stream has great potential as an educational and recreational site due to its central location in the science town and science museums nearby, environmental aspect especially for water quality has not been evaluated properly. Through field survey, major pollution sources of the stream were identified and effect of water quality improvement alternatives were evaluated using a QUAL2K water quality model for the stream. The study indicated that controlling major pollution sources of the stream alone may not be sufficient for reaching the water quality target. Therefore, additional pollution control methods are necessary. We applied the developed model to evaluate the effects of a constructed wetland on the terrace land, and analyzed whether the water quality target can be met at the outlet of the stream. It is expected that this study would provide a good reference for environmentally sound management of small urban streams in Korea.

Simulation of compound flooding using TUFLOW's 1D-2D coupling features (TUFLOW의 1-2차원 연계 기능을 활용한 복합 침수 모의)

  • Hwang, Donggyu;Kang, Teauk;Jin, Yongkyu;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.7
    • /
    • pp.451-460
    • /
    • 2024
  • It is necessary to apply a rational urban flood simulation method to analyze the causes of frequent urban flooding and to develop appropriate countermeasures. Previous studies in Korea have performed flood simulations by inputting the results of manhole overflow from sewer systems and river overflow into two-dimensional flood flow simulation models. It, however, is reasonable to simulate flooding from river and manhole overflows in a complex manner. In this study, we used the 1D-2D coupling functionality of the TUFLOW module, which is a part of XP-SWMM, to simulate the compound flooding of rivers and urban areas. That method was applied to the lower basin of the Naengcheon River in Pohang City, Gyeongsangbuk-do, where both inland flooding and river overflow coincided due to Typhoon Hinnamnor on September 5 and 6, 2022, to verify its applicability.