• Title/Summary/Keyword: 피난 터널

Search Result 73, Processing Time 0.024 seconds

Comparison of Egress Modeling for the Connected Space from Subway Car to Platform (지하철 차량과 승강장의 연계공간에 대한 피난모델링 적용비교)

  • Kim, Jong-Hoon;Seo, Dong-Hoon;Eo, Deuk-Gang;Kim, Woon-Hyung;Lee, Duck-Hee;Jung, Woo-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.870-873
    • /
    • 2011
  • The circumstance as platform and tunnel is very important in evacuation from passenger train car on fire. The comparison of egress modeling by SIMULEX, PATHFINDER, STEPS was conducted in order to analyze for the influence of platform to egress from subway car. Model subway car is seoul metro subway car. Model platform was designed by code 'Complementary design guide for connecting and convenience facilities, and urban subway station'.

  • PDF

Experiments of Horizontal Movement in Train Car on Non-lighting (철도차량에서의 무조명 상태 시 수평이동에 관한 실험)

  • Kim, Jong-Hoon;Kim, Woon-Hyung;Roh, Sam-Kew;Lee, Duck-Hee;Jung, Woo-Sung
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.04a
    • /
    • pp.506-509
    • /
    • 2010
  • 국내에서는 철도차량의 화재안전성능을 향상시키기 위해 성능평가를 적용하기 위한 연구가 진행되고 있다. 철도차량에서의 화재 시 피난은 여러 가지 시나리오들이 존재하며, 이중 하나가 터널내부에서 정전이 되어 무조명상태가 되는 것이다. 철도차량은 물리적 공간적 환경이 건축물과 차이가 있다. 또한 문화적 인종적 차이로 인해 외국의 데이터를 바로 적용하는 것도 바람직한 일은 아니다. 그러므로 시나리오를 분석하기 위해 필요한 데이터는 실험을 통해 확보해야할 필요성이 있는 것이다. 무조명 상태에서의 피난인의 행태와 이동속도의 차이 등을 분석하기 위해 실험을 수행하고 그 결과를 분석해 보았다.

  • PDF

A Study of Smoke Movement in a Short Tunnel (짧은 터널 내의 연기거동에 관한 연구)

  • Kim, Sung-Chan;Ryou, Hong-Sun;Kim, Chung-Ik;Hong, Ki-Bae
    • Tunnel and Underground Space
    • /
    • v.12 no.1
    • /
    • pp.31-36
    • /
    • 2002
  • This paper concerns smoke propagation in tunnel fires with various size of fire source. Experiments carried out in model tunnel and those results were compared with numerical results. The Froude scaling law was used to scale model tests for comparison with larger scale tests. In order to validate for numerical analysis, temperature distribution of predicted data was compared with measured data. Examining the temperature distribution, we found that smoke layer does not come down under 50% of tunnel heights for a short tunnel heights for a short tunnel firs without ventilation. Front velocity of smoke layer is proportional to the cube root of heat release rate. And it is in good agreement with existing empirical expression and numerical prediction. In a short tunnel fire, horizontal propagation of smoke layer is more important than vertical smoke movement for evacuation plan.

Analysis of the peak particle velocity and the bonding state of shotcrete induced by the tunnel blasting (발파시 터널 숏크리트의 최대입자속도와 부착상태평가 분석)

  • Hong, Eui-Joon;Chang, Seok-Bue;Song, Ki-Il;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.3
    • /
    • pp.247-255
    • /
    • 2010
  • Bonding strength of shotcrete is a significant influential factor which plays the role of collapse prevention of tunnel crown and of debonding prevention of shotcrete induced by the blasting vibration. Thus, the evaluation of the shotcrete bonding state is one of the core components for shotcrete quality control. In this study, the peak particle velocities induced by blasting were measured on the shotcrete in a tunnel construction site and its effect on the bonding state of shotcrete is investigated. Drilling and blasting technique was used for the excavation of intersection tunnel connecting the main tunnel with the service tunnel. Blast-induced vibrations were monitored at some points of the main tunnel and the service tunnel. The shotcrete bonding state was evaluated by using impact-echo test coupled with the time-frequency domain analysis which is called short-time Fourier transformation. Analysis results of blast-induced vibrations and the time-frequency domain impact-echo signals showed that the blasting condition applied to the excavation of intersection tunnel hardly affects on the tunnel shotcrete bonding state. The general blasting practice in Korea was evaluated to have a minor negative impact on shotcrete quality.

Estimation of Safety in Railway Tunnel by Using Quantitative Risk Assessment (QRA를 이용한 철도터널 방재 안전성 평가)

  • Kim, Do-Sik;Kim, Do-Hyung;Kim, Woo-Sung;Lee, Du-Hwa;Lee, Ho-Seok
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.357-367
    • /
    • 2006
  • Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures grow longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest of safety in long tunnel have a growing and the safety standard of long tunnel is tightening. For that reason, at the planning of long tunnel, the optimum design of safety facility in long tunnel for minimizing the risks and satisfying the safety standard is needed. For the reasonable design of long railway tunnel considering high safety, qualitative estimation for tunnel safety is required. In this study, QRA (Quantitative Risk Assessment) technique is applied to design of long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design in long railway tunnel is tarried out to verifying the QRA technique for two railway tunnels. Thus, the inclined and vertical shaft for escape way and safety facilities in long tunnel are planned, and the risks of tunnel safety for each case are estimated quantitatively.

A study on design and performance test of fire door with high endurance performance in submarine tunnel (고내구성능을 갖는 해저터널 방화문 설계방안 및 성능시험 연구)

  • Park, Sang-Heon;Hwang, Ju-Hwan;Choi, Young-Hwan;An, Sung-Joo;Yoo, Yong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.331-346
    • /
    • 2018
  • In the tunnel of domestic high - speed railway, the main fire - fighting facility, fire - extinguishing passageway, is installed. However, due to the high pressure of the high - speed train, frequent breakage and maintenance are caused by strong shock and long - term vibration. In order to solve these problems, it is necessary to improve the fire door, but in Korea, it is installed by submitting a certificate by simple KS F 2296 performance test. At present, it is developed as a simple test certification by producing a real scale fireproof door without the theoretical examination in advance, so that a high cost for improvement is occurring in Korea. Therefore, through this study, structural analysis study which can preliminary structure review was carried out in order to design the refuge connection passage fire door and to improve the performance improvement. In order to secure the reliability of the result value, the official authentication test (KS F 2296) were compared.

A Study on the Model Experimet and MLZ Model Analysis for Predicting Fire Behavier in Road Tunnel (도로터널에서의 화재성상 예측을 위한 축소모형실험 및 MLZ모델 분석에 관한 연구)

  • Han, Jung-Chul;Lee, Ju-Hee;Kwon, Young-Jin
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.294-297
    • /
    • 2012
  • 본 연구는 MLZ을 활용하여 도로터널의 다양한 화재시나리오별 화재성상예측을 목적으로 1/20 Scale 모형실험을 통하여 소형차, 버스화재 시 FAN의 작동 비작동, 소형차 2대 직렬 병렬화재, 소형차 2대+버스 혼합 화재실험을 바탕으로 FAN작동시 배기구 방향으로 고온의 열기층이 생성됨을 확인하였다. 축소모형실험과 MLZ 해석결과를 비교하여 화원으로부터의 약 20m 정도의 이격거리부분 온도가 유사하게 나타났고, 시간별 온도분포를 확인한 결과 플래시오버 이전단계에 피난계획을 세우는 단계에서 예측이 가능했다.

  • PDF

A Study on the Behavior of an Existing Tunnel and the Safety Implications on its Facilities from a New Tunnel Blasting (신설 터널 발파 시 기존 터널 거동 및 시설물 안전에 관한 연구)

  • Kim, Sung Hoon;Cho, Woncheol
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.2
    • /
    • pp.57-64
    • /
    • 2010
  • In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.

  • PDF

A study on the effect of gusty wind on smoke control performance in road tunnel (돌풍이 도로터널의 제연성능에 미치는 영향 연구)

  • Baek, Doo-San;Cho, Hyeon-Seok;Lee, Seung-Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.95-108
    • /
    • 2022
  • The increase in the use time of tunnel users due to the lengthening of the road tunnel may increase the evacuation time in case of fire, resulting in a large number of casualties. In order to reduce the casualties caused by fire, the "Road Tunnel Design Manual, Part 6 Tunnel" and "Road Tunnel Disaster Prevention Facility Installation and Management Guidelines" stipulate that ventilation facilities should be installed along with the extension of the tunnel. The ventilation system design factor considers the wind speed of the external natural wind to be at least 2.5 m/s, and it is applied upward according to the characteristics of the tunnel. As a result of analyzing the five-minute average wind speed data in the Daegwallyeong region for the past 6 years, it was analyzed that 15.8% of the windy days were winds of 10 m/s or more, and the maximum was 20 m/s. Therefore, in this study, when a fire occurs in a tunnel, the pattern of natural wind flowing into the tunnel and the backlayering distance of the tunnel fire smoke according to the maximum wind speed were analyzed. As a result, it was analyzed that a backflow of up to 490 m occurs when a gust of 20 m/s blows.