• Title/Summary/Keyword: 피난개시시간지연

Search Result 4, Processing Time 0.022 seconds

The Analysis of Evacuation Safety by Smoke Alarm in Housing Fire (주택형화재경보기 작동에 따른 피난안전해석)

  • Choi, Young-Sang;Jeon, Heung-Kyun;Bak, Yeul-Sun
    • Fire Science and Engineering
    • /
    • v.25 no.6
    • /
    • pp.73-82
    • /
    • 2011
  • This study was performed to analysis the influence of smoke alarm detector on evacuation safety in housing fire. The analysis was conducted by CFAST fire simulation program and building EXODUS evacuation program. The effects of the earlier response time on evacuation safety were investigated by using evacuation simulation program with several steps of different response time and smoke alarm activation time for 4 occupants. The smoke detecter was activated 37.1 second after fire. The first two mortuary were occurred for 170 seconds of response time at the end of living room near exit. But for the 37.1 seconds of response time 4 occupants evacuated safely. From this study, the fire alarm detector is more important for safety evacuation in housing fire.

Effects of evacuation delay time and fire growth curve on quantitative risk for railway tunnel fire (철도터널 화재 시 피난개시시간지연 및 화재성장곡선이 정량적 위험도에 미치는 영향)

  • Ryu, Ji-Oh;Kim, Hyo-Gyu;Lee, Hoo-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.809-822
    • /
    • 2018
  • A quantitative risk assessment has been introduced to quantitatively evaluate fire risk as a means of performance based fire protection design in the design of railway tunnel disaster prevention facilities. However, there are insufficient studies to examine the effect of various risk factors on the risk. Therefore, in this study, the risk assessment was conducted on the model tunnel in order to examine the effects of the evacuation start time delay and the fire growth curve on the quantitative risk assessment. As a result of the analysis of the scenario, the fatalities occurred mainly when escapes in the same direction as the direction of the fire smoke movement. In addition, after the FED exceeded 0.3, the maximum fatalities occurred within 10 minutes. In the range of relatively low risk, distance between cross passages, evacuation delay time and fire growth curve were found to affect the risk, but they were found to have little effect on the condition that the risk reached the limit. Especially, in this study, it was evaluated that the evacuation delay time reduction, fire intensity and duration reduction effect were not observed when the distance between cross passages was more than 1500 m.

Analysis on Activation Characteristic of Heat Detectors in a Compartment Fire (실내화재에서의 열감지기 동작특성 분석)

  • Ryu, Hocheol
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.4
    • /
    • pp.598-608
    • /
    • 2014
  • The first operation of alarm system starts at a detector. And the largest effect is produced on the operation of detector by the fire source position and installation position. Nevertheless, the Korean standard for the installation of detector only specifies matters of fire detector installation according to area and height, without consideration of installation position and fire source position. Therefore, this study carried out a fire test in consideration of detector installation position and fire source position (5 places) in order to minimize casualties owing to the fast operation of fire detector when a fire occurred. Considering that it took the longest time for a detector close to a wall to work in the results of this test, it was possible to find that a minimum clearance to the wall was required.

A Study on the Safety of Evacuation according to Evacuation Delay Time and Fire Door Openness: Based on Residence Types (피난 지연시간의 적용과 방화문 개방 정도에 따른 피난 안전성 확보에 관한 고찰 : 주거형태를 중심으로)

  • Seo, Dong-Gil;Kim, Mi-Seon;Gu, Seon-Hwan;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.156-165
    • /
    • 2020
  • In this paper, the application of evacuation delay time (Cognition time + initiation time) and examine the degree of opening of fire doors in households for evaluating evacuation safety and suggest a realistic alternative. In order to proceed with this study, first of all, the preliminary investigation on evacuation safety evacuation of residential-type buildings (Apartment, urban living houses, etc.) among the performance-oriented design targets of Gwangju Metropolitan City, which was implemented until June 2018. Then, for the two representative types that are commonly used among the previously surveyed buildings, evacuation delay time is applied to W1, W2, and respectively simulating the opening of the doors is applied to th full open, 1/4 open, the leakage gap and evacuation safety evaluation was performed. As a result of evaluating evacuation safety was found that it is difficult to secure evacuation safety regardless of evacuation delay time W1 and W2 when the fire door is fully open and 1/4 open, Only when the leakage gap is applied evacuation safety was ensured even if evacuation delay time W2 was applied. Therefore, when a residential building is subject to performance-oriented design, evaluating the application of W2 rather than W1 is considered for evacuation delay time to reflect concern about privacy infringement due to CCTV installation, etc. In order to secure the Smoke blocking performance of the fire door and to improve the performance-oriented design, I would like to propose to consider the method of applying a leak gap to the degree of opening of the fire door. Through this, it is expected that the performance-oriented design will be a step further by performing evacuation safety evaluation with more realistic data.