• Title/Summary/Keyword: 프리캐스트 아치구조물

Search Result 7, Processing Time 0.028 seconds

Numerical analyses for mechanical behavior of cut-and-cover tunnel with precast arch type (프리캐스트 아치형 개착식 터널의 역학적 거동에 관한 수치해석)

  • Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.315-325
    • /
    • 2009
  • The thickness of the material can be thinned because arch cut-and-cover tunnel has the support mechanism by the axial force, and the ground reaction force due moderate deformation can be expected thereby making it be dynamically advantageous, therefore the arch cut-and-cover tunnel has become more widely used. An important characteristic of the arch cut-and-cover tunnel is that the thickness of the material can be thinned because precast arch type has the support mechanism by the axial force. However, there is a different stress state surrounding the structures between normally excavated tunnels and cut-and-cover tunnels, it should be considered at designing. Therefore, finite element method was carried out to examine the mechanical behavior of the precast arch cut-and-cover tunnel considering construction procedure.

Investigation for the deformation behavior of the precast arch structure in the open-cut tunnel (개착식 터널 프리캐스트 아치 구조물의 변형 거동 연구)

  • Kim, Hak Joon;Lee, Gyu-Phil;Lim, Chul Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.93-113
    • /
    • 2019
  • The behavior of the 3 hinged precast arch structure was investigated by comparing field measurements with numerical analyses performed for precast lining arch structures, which are widely used for the open-cut tunnel. According to the field measurements, the maximum vertical displacement occurred at the crown with upward displacements during the backfilling up to the crown of the arch and downward displacements at the backfill height above the crown. The final crown displacement was 19 mm upward from the original position. The horizontal displacement at the sidewall, which had a maximum horizontal displacement, occurred inward of the arch when compacting the backfill up to the crown and returned to the original position after completing the backfill construction. According to the analysis of displacement measurements, economical design is expected to be possible for precast arch structures compared to rigid concrete structures due to ground-structure interactions. Duncan model gave good results for the estimation of displacements and deformed shape of the tunnel according to the numerical analyses comparing with field measurements. The earth pressure coefficients calculated from the numerical analyses were 0.4 and 0.7 for the left and the right side of the tunnel respectively, which are agreed well with the eccentric load acting on the tunnel due to topographical condition and actual field measurements.

Seismic analysis and dynamic behavior characterization of rib-reinforced pre-cast tunnels (리브 보강 프리캐스트 터널의 내진 해석 및 동적거동 특성 파악)

  • Song, Ki-Il;Jung, Sung-Hoon;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.287-301
    • /
    • 2009
  • The novel cut-and-cover tunnel construction method using rib-reinforced pre-cast arch segments has been recently developed and applied for practice to secure a structural stability of high covering and wide width section tunnels. Cut-and-cover tunnels are usually damaged by the seismic behavior of backfill grounds in case of a low covering condition. Seismic analyses are performed in this study to characterize the dynamic behavior of rib-reinforced pre-cast arch cut-and-cover tunnels. Seismic analyzes for 2 lane cast-in-place and rib-reinforced pre-cast arch cut-and-cover tunnels are carried out by using the commercial FDM program (FLAC2D) considering various field conditions such as the covering height embankment slope and excavation slope. It can be concluded that the amplification of seismic wave is reduced due to an increase in the structural stiffness induced by rib-reinforcement. The results show that the rib-reinforced pre-cast arch cut-and-cover tunnels are more effective against the seismic loading, compared to the cast-in-place cut-and-cover tunnels.

Mechanical behaviour of tunnel liner using precast segment reinforced by rib (리브 보강 프리캐스트 터널 Liner의 역학적 거동 특성)

  • Lee, Gyu-Phil;Lee, Sung-Won;Shiin, Hyu-Soung;Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.295-302
    • /
    • 2008
  • Due to the limitation of construction efficiency and structural safety, the application of the high covering and wide width tunnels was limited prior to the introduction of precast cut and cover tunnels. Therefore, a cut and cover tunnel structure with rib reinforcement is proposed to mechanically improve the safety on condition of high covering and wide width tunnel. In this study, large-scale experiments are carried out to examine the mechanical behavior of the cut and cover tunnel structure with rib reinforcement under static load condition. Based on the results obtained from this study, the ultimate load of tunnel structure increases to about 3.3 times by rib reinforcement. Consequently, safety of tunnel structure increases compared to non-installed cases due to confining crown part by rib reinforcement.

  • PDF

Effect of Ground Boundary Condition on Evaluation of Blast Resistance Performance of Precast Arch Structures (지반경계조건이 프리캐스트 아치구조물의 폭발저항성능 평가에 미치는 영향)

  • Lee, Jungwhee;Choi, Keunki;Kim, Dongseok
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.32 no.5
    • /
    • pp.287-296
    • /
    • 2019
  • In this study, the effect of ground boundary conditions on the evaluation of blast resistance performance of precast arch structures was evaluated by a numerical analysis method. Two types of boundary conditions, namely, fixed boundary conditions and a perfectly matched layer (PML) were applied to numerical models. Blast loads that were much higher than the design load of the target structure were applied to compare the effects of the boundary conditions. The distribution and path of the ground explosion pressure, structural displacement, fracture of concrete, stress of concrete, and reinforcing bars were compared according to the ground boundary condition settings. As a result, the reflecting pressure shock wave at the ground boundaries could be effectively eliminated using PML elements; furthermore, the displacement of the foundation was reduced. However, no distinct difference could be observed in the overall structural behavior including the fracture and stress of the concrete and rebar. Therefore, when blast simulations are performed in the design of protective structures, it is rational to apply the fixed boundary condition on the ground boundaries as conservative design results can be achieved with relatively short computation times.

Structural Performance of Precast Concrete Arch with Reinforced Joint (보강된 이음부를 가진 조립식 프리캐스트 콘크리트 아치의 구조성능)

  • Chung, Chulhun;Joo, Sanghoon;Choi, Dongchan;Lee, Jongyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.29-47
    • /
    • 2014
  • The masonry stone arch bridge, due to its superior durability and aesthetics, has been one of the oldest and popular types of short span bridges. In Europe, this type of bridges have been continuously constructed, and numerous related researches have been conducted until recently. However, there are few construction cases in Korea since the economic efficiency and the construction effectiveness is not contentable. Therefore, this study proposed the reinforced joint to improve structural performance of the conventional arch systems which is proposed by previous researchers. The structural performance of the proposed reinforced joint, which consists of the transverse loop joint and the longitudinal reinforcement, is validated by experimental test of an arch bridge which is constructed using precast concrete segments. Based on this results of the experimental test, it is concluded that the strength of arch bridges can be enhanced by applying the proposed reinforced joints since the reinforced joint restrains hinge behavior and relative displacement between segments with a little reinforcement.

Waterproofing technology for PC double arch tunnel using synthetic rubber polymer gel and cooper sheet for root barrier (합성고무 폴리머 겔과 구리 방근시트를 이용한 P.C 쌍아치 터널 구조물 방수기술)

  • Lee, Jong-Yong;Park, Sang-Tai;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.44-45
    • /
    • 2020
  • The purpose of this study was to contemplate the effectual waterproofing materials and construction methods for the restoration of underground infrastructures using precast arches(PC-Arch). Until now, there were no proper waterproofing guidelines for waterproofing precast arch tunnel when restoring cultural heritage or building underground infrastructures for noise control. Asphalt membrane sheets were commonly used, but the efficacy of waterproofing done on the precast segment was vulnerable. This study aims to examine the Synthetic Rubber Polymerised Gel(SRPG) proposed in ISO TR 16475, a guideline for the repair of water-leakages, and to demonstrate field applicability based on the waterproofing solution used on the road improvement project in front of Changgyeonggung Palace in Yulgok-ro, Seoul, Republic of Korea.

  • PDF