• Title/Summary/Keyword: 프리캐스트 기둥

Search Result 47, Processing Time 0.037 seconds

Effect of Flexural Performance on U-Shaped Precast Concrete Beams with Noncontact Lapped Splice (비접촉 겹침 이음된 프리캐스트 U형 보의 휨성능에 미치는 효과)

  • Ha, Sang-Su;Kim, Seung-Hun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.6
    • /
    • pp.119-128
    • /
    • 2008
  • In this study, new moment-resisting precast concrete beam-column joint is proposed for moderate seismic regions. It has the connection reinforcing bars, penetrated the joint and lap-spliced with the bottom bars of precast U-shaped PC beam. To evaluate the performance for noncontact lapped splice, experimental and analytical works were conducted. Major variables for tests are the length of lap, the diameter of connection reinforcing bars, and the distance between lapped bars. Analytic research was performed nonlinear finite element method. Analytic research focused on crack pattern, load-deflection curve, comparison of internal force, evaluation of ductility strains of reinforcement bar. Results of experimental and analytical works show that the these variables has much influence on flexural strength and ductility, and joint behavior.

Analysis on the Behavior of Modified DDC, Precast Beam-Column Concrete Connectors for Apartments (공동주택을 위한 건식 프리캐스트 보-기둥 변형 DDC 접합부의 거동분석)

  • Song, Hyung-Soo;Lee, Bo-Kyung;Yu, Sung-Yong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.9-12
    • /
    • 2005
  • Four precast concrete beam-column connectors for the apartment buildings were considered to develop a modified model which was adapt to domestic construction conditions from the DDC(Dywidag Ductile Connectors) of Germany. Special H-shape steel were used to decrease the width of column and beams for the construction of external frames of apartments. It was found that the DDC had high joint strength and ductility, however failed in x-shape crackings in the columns. The modified one showed better behaviors in tests because they did not show critical column crackings at failure. The test result of modified one with grouting were compared to that of the one without grouting within the duct. The one with grouting showed higher strength and ductility in failure than that without grouting.

  • PDF

Analysis on the Behavior of Post-tensioned Precast Beam-Column Concrete Connectors (포스트텐션 프리캐스트 보-기둥 건식 콘크리트 접합부의 거동분석)

  • Song Hyung Soo;Ryu Jung Wook;Kim Yun Soo;Yu Sung Yong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.41-44
    • /
    • 2005
  • Three precast concrete beam-column connectors for the high-rise office buildings were considered to investigate the prestressing effects of the DDC(Dywidag Ductile Connectors) of Germany and of the modified DDC. The specimens of DDC, DDC with post-tensioning and modified DDC with post-tensioning were constructed and tested to verify the safety. The DDC with and without post-tensioning showed reliable joint strength and ductility but failed in critical x-shape crackings at the column. The modified one showed better behaviors in tests because they did not show critical column crackings at failure. The use of prestressing did not helpful significantly to increase the strength and ductility of connectors but helpful only to develop self-centering behavior for stability.

  • PDF

Shear Resistance Capacity of Precast Post-tensioned Concrete Beam-Column Connection (프리캐스트 포스트텐션 콘크리트 보-기둥 접합부의 전단성능)

  • 조경호;이종규;최광호;김상식
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.769-774
    • /
    • 2000
  • The first thing in developing precast post-tensioned concrete frame system verify the shear resistance capacity of the beam-column connection at which the transfer of member forces become discontinuous. Complying with the necessity of such experimental research, shear tests have been performed for six test specimens which were cast and cured at Dong-Ah Concrete Manufacturing Company and post-tensioning at Concrete Laboratory of Inha University. Shear key and magnitude of post-tensioned force are taken test variables. From the test results, it has been observed that the shear resistance of the specimens attained to higher values than those of theoritical calculations based on the shear friction with shear friction coefficient being 0.6.

  • PDF

The Experimental study on the behavior of precast Girder-Infilled Steel Tube Column joint (프리캐스트 보와 충전형 강관 기둥 접합부의 거동에 관한 실험적 연구)

  • 정재우;박성무
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.10a
    • /
    • pp.317-322
    • /
    • 1995
  • This study is to examine the usefulness in using precast girder-infilled steel tube column in reinforced concrete structures through the analysis of the test results, in order to develope the new composite structural system using precast girder-Infilled steel tube column, The variables of specimen are strength of concrete, the numble of hoops, the form of beam-column The variables of specimen are strength of concrete, the number of hoops, the form of beam-column joints. By raising strength of concrete and incresing number of hoops in beam-column joint, it becomes clear to take similar structure capacity to monolithic structures.

  • PDF

Construction Cost Analysis of HPC Method by PC Construction Project Cases (사례분석에 의한 HPC공법의 공사비 분석)

  • Noh, ju-seong;Kim, Jae-yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

Application of PC Beam-Column Interior Joint with Splice Type Re-bar (PC 다층 연성 골조시스템의 현장적용 사례 연구)

  • Kim Joon-Ho;Jeon Byong-Kap;Park Soon-Kyu;Kim Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.9-13
    • /
    • 2006
  • The purpose of this study was to introduce the applied care of PC beam-column interior joint with splice type rebar. In this case, although the erection time of the introduced case was a little bit higher than that of general precast concrete method, this method was more effective than general precast concrete method in aspect of direct cost and the number of column joint. Therefore, this method could be adopted in the construction of the commercial and residential building in the future.

  • PDF

Performance of Precast Concrete Beam-Column Connections Subjected to Cyclic Loading (반복하중을 받는 프리캐스트 콘크리트 보-기둥 접합부의 거동 연구)

  • Kim, Kyu-Rhee;Park, Hong-Gun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.619-622
    • /
    • 2004
  • In this study, a moment resisting precast concrete beam-column connection is proposed. An experimental study was carried out to investigate the connection behavior subjected to cyclic loading. Three precast beam-column interior connections and one monolithic connection were tested. Variable included the detailing used at the joint to achieve structural constructability and the location of mild steel reinforcement and high strength bar. During specimen fabrication, the joint details enables ease and speed of construction. Connection performance is evaluated on the basis of ductility, energy dissipation capacity, connection strength, and drift capacity. Based on test results, the precast concrete beam-column connection is capable of matching or exceeding the performance of the monolithic connection.

  • PDF

Experimental Test for Seismic Performance of PCS Structural System (PCS 구조 시스템의 내진 성능 분석)

  • Park, Soon-Kyu;Yeo, In-Seok
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.3
    • /
    • pp.313-322
    • /
    • 2007
  • The PCS system, which consists of precast concrete column and steel beam, is a kind of composite structural systems. In this paper, experimental study has been conducted to analyze seismic performance of bolted beam-to-column connections for the PCS system. Based on experimental results from the seismic testing of eight interior PCS specimens, it shows that behavior of PCS system is satisfactory to seismic performance criteria of ACI such as strength deterioration, stiffness degradation and energy dissipation capacity except initial stiffness. All of the specimens maintain their strength at large levels of story drift without significant loss of stiffness and show high ductility level for inelastic behavior. The energy dissipation capacity is two times greater than requirement of ACI criterion. But the initial stiffness of all specimens does not satisfy ACI criterion, and this phenomenon is similar to the other composite structural systems such as RCS, CFT system.

Development of Precast Concrete Method for Eco-Pillar Debris Barrier with Hollow Cross-Section (중공트랙형 단면의 프리캐스트 에코필라 사방댐 공법개발)

  • Kim, Hyun-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.542-552
    • /
    • 2018
  • In this paper, the precast method of a concrete eco-pillar debris barrier was proposed to improve the construct ability and economic efficiency. The performance was validated by experimental and structural analysis. The steel debris barrier has a high construction cost and causes environmental damage with corrosion. The construction of a concrete eco-pillar debris barrier has been increased recently. On the other hand, there are no design standards regarding debris barriers in Korea, and debris barriers are being designed by the experience and sense of engineers. Therefore, in this study, a method to determine the design external forces was proposed and the design was performed by applying a hollow cross-section to the debris barrier. In addition, three types of connection methods of a concrete cantilever column with the maximum bending moment acts were proposed, and validation of the performance of each type was performed with a real-scale experiment. The experimental results showed that the type with loop reinforcement had the highest rigidity and the type with anchorage performance exceeded the maximum bending moment according to the ultimate load. In the manufacturing procedure of mock-up debris barriers, the type with an anchorage-bar was found to have superior construct ability.