• Title/Summary/Keyword: 프로젝트 특성분석

Search Result 495, Processing Time 0.027 seconds

The Strength of Network Ties in TV Drama Making Project: Performance Implication (TV 드라마 제작 프로젝트의 사회 네트워크 연결강도: 성과에 대한 함의)

  • Choo, Seungyoup;Limb, Seong-Joon
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.6
    • /
    • pp.1-12
    • /
    • 2015
  • This study attempted to verify the influence of strong and weak ties on the performance of project based organizations by examining various tie relationships in the Korean TV drama making industry. The extant literature has suggested that the impact of network ties depends not only on their strength but also the network contexts (i.e., project characteristics). Due to artistic and creative nature of TV drama making, it is hypothesized that weak tie networks among critical human resources would outperform strong tie networks. Empirical results support the hypothesis that weak tie networks indeed outperform strong tie networks in terms of viewing rate of drama.

Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

Analysis of Learning Effects According to Characteristics of Students on Project Based Multimedia Authoring (프로젝트기반 멀티미디어 저작 교육에서 학습자의 특성에 따른 성취도 분석)

  • Cho, Soo-Sun
    • Journal of Korea Multimedia Society
    • /
    • v.8 no.5
    • /
    • pp.691-699
    • /
    • 2005
  • One of the important objects in the multimedia instruction is improvement of ability to make multimedia contents. In order to achieve this goal, instructing project based multimedia contents authoring and examining the effectiveness can be contributable to enhance the instruction strategies. In this study, we analyzed the teaming effects according to characteristics of students on project based multimedia contents authoring which has performed during one semester, at a university to enrich the purpose of multimedia instruction. As the result, differences on teaming effects according to personal characteristics such as 'ages', 'admitter or not', were found to be significant in statistics. And 'interestedness in projects', 'roles in projects' also have lead to distinct differences on students' performance.

  • PDF

Assessment of Equity Market Responses on the Construction Project Awards (건설프로젝트 수주에 대한 시장의 평가)

  • Choi, Jong-Soo;Heo, Seong-Tae;Lee, Hee-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.221-228
    • /
    • 2010
  • A construction firm's performance is largely attributable to performance in individual projects. In this regard, the awarding of an individual project has significant implications. However, project awards have received limited attention in the construction sector from amarket assessment perspective. This event study focuses on an analysis of market responses at the time of project awarding. A total of 252 samples wereselected through a rigorous sample screening processes. Performance was measured as cumulative abnormal return, which is traditionally adopted in event analysis. Research results indicated that the overall return is positive, and that the level isstatistically significant. Equity holders realized a higher return for projects awarded from the foreign countries compared to domestic projects. No relationship was observed between project size and the level of return. Other research findings and implications were discussed in detail from a management perspective.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

A Study on Quality Improvement Methods of Small Scale Projects with Audit Activity Analysis (감리 활동 분석을 통한 소규모 프로젝트의 품질 향상 방안 연구)

  • Hong, Sung-Ho;Kim, Neung-Hoe;In, Hoh Peter
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.04a
    • /
    • pp.512-513
    • /
    • 2016
  • 정보시스템은 기업에 반드시 필요하며 고품질의 정보시스템이 요구되고 있다. 하지만, 고품질의 정보시스템을 구축하는데 많은 어려움이 있다. 이에 따라 정부에서는 감리제도를 도입하여 고품질의 정보시스템 구축에 대한 문제를 해결하고자 노력하고 있지만 소규모 프로젝트의 경우에는 감리대상의 범위에 들어가지 않고 적은 비용으로 인해 프로젝트 품질 관리활동이 없이 품질 관리에 어려움을 겪고 있다. 본 연구에서는 요구분석 영역에서의 감리활동 사례를 분석하고 자주 발생하는 지적 사항을 토대로 이해당사자들이 프로젝트의 특성에 맞게 점검항목을 만들어 AHP 분석을 통하여 중요도를 산정하고 추가적인 점검사항을 더해 품질 향상을 위해 소규모 프로젝트에 적용 가능한 품질 관리 프로세스를 제안한다.

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

Research of Some Features of Project Planning and Controlling Processes Using PMMM (PMMM을 통한 한국 IT프로젝트 계획과 통제 프로세스의 특성에 관한 연구)

  • Yong, Hwan-Seong;Lee, Seouk-Joo;Kang, Jae-Woo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.1345-1348
    • /
    • 2011
  • 프로젝트 관리 성숙도(Project Management Maturity Model)란 기업 조직의 프로젝트 관리 관행이나 도구 및 기법 적용의 성숙도 단계를 정의한 것이며, 계량적인 성숙도 측정을 통해 프로젝트 관리의 장단점을 파악하고 개선하여 기업의 성과를 향상시키는데 그 목적이 있다. 본 논문에서는 프로젝트 관리성숙도를 활용하여 첫째, 한국 IT산업의 프로젝트 관리 성숙도를 측정하였고 둘째, 프로젝트 관리영역 중 범위관리와 원가관리의 계획 프로세스와 통제 프로세스간 성숙도를 비교 분석하였다. 연구 결과로 원가관리와 위험관리의 성숙도가 타 영역에 비해 낮아 개선의 노력이 필요하며, 범위정의 프로세스와 범위변경통제 프로세스간 프로젝트 관리 성숙도의 차이가 있는 것으로 나타났다. 본 연구의 성과로는 프로젝트 관리 성숙도 측정과 분석을 통해 기업의 프로젝트 관리 성숙도 향상과 프로젝트 성과 및 기업 성과 향상에 기여하는데 있다.

World Class 300 지원사업의 산업군별 경제적 성과분석

  • O, Han-Seok;Choe, Gyeong-Hyeon
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2020.06a
    • /
    • pp.203-210
    • /
    • 2020
  • 본 연구에서는 대표적인 국내 중소·중견기업 육성사업인 "World Class 300 프로젝트" 수혜기업을 대상으로 R&D 지원사업의 성과를 측정하고자 한다. 특히, 수혜기업을 산업군(소재·부품·장비·모듈·소비재 기업)별로 세분화해 R&D 지원사업이 산업군별 특성에 따라 어떻게 차별화되는지에 대해 실증분석하였다. 분석은 2011년부터 2017년까지 World Class 300 프로젝트에 선정된 총 272개 기업을 대상으로 수행되었으며, 패널회귀 방법론을 통해 얻은 분석결과는 R&D 지원이 산업군에 따라 기업의 성과(당기순이익)에 상이한 영향을 미치는 것으로 확인되었다. 소재, 부품, 장비 기업 표본에서는 성과에 통계적으로 유의한 영향을 미치지 못했고, 모듈 기업 표본에서는 성과에 부정적인 관계가 있는 것으로 나타났으나, 소비재 기업 표본에서는 성과에 긍정적인 영향을 미친 것으로 분석되었다. 본 연구는 향후 R&D 지원효과를 극대화하기 위해서는 산업군별 특성에 맞는 차별화된 지원정책의 기획·집행이 필요하다는 점에서 기존 연구들과의 차별성을 확보할 수 있다.

  • PDF

Cash flow Forecasting in International Construction Projects through Categorized Risk Analysis (특성별 리스크 분석을 통한 해외건설공사 현금흐름 예측에 관한 연구)

  • Yeom, Sang-Min;Han, Seung-Heon;Kim, Du-Yeon;Nam, Ha-Na;Park, Hee-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.295-300
    • /
    • 2006
  • In this research, risk factors which can raise project cost are identified in the initial stage and picked out through the decision maker's baseline. And also this probable risks are implemented to the project cash flow to estimate the contingency and to build a risk management system in the level of project. The risks that affect the projects profits were classified in two categories in the risk checklist. Firstly, financial risks derived from the external economic conditions for example exchange rate, escalation, interest rates etc. are analyzed through the stochastic methods, Monte-Carlo Simulation. Secondly, the project individual risks which are come from the project characteristics, for example country risk, clime, owner etc., are evaluated using the utility curve of the decision maker. Finally these risk analysis methods are used to forecast the actual project cash flow and final profit.

  • PDF