The Analysis of Current Daily-Report System and The Proposal of Improvement Framework (작업일보 현황 분석에 따른 개선방향 제시)

  • Kim Bong-nyoun;Kim Chang-Duk;Ee Hyun-Soo;Kim Sun-Kuk;Seo Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.66-73
    • /
    • 2003
  • Building construction projects are performed by a number of sub-contractors specialized in diverse trades. Therefore information management among these constituents is quite challenging especially due to exponentially increasing manpower and material resources. In recognition of the importance of information management in project sites a number of systems have been suggested, but the application is limited one of the main reason is that general contractors use these systems and sub-contractor's participation understanding and financial ability are limited. Besides other problems such as loss along communication channel, distortion of information due to inefficient input device and tremendous amount of time and labor are required for collection analysis, and management of information to prepare a daily-report. Therefore the Purpose of this study is to improve reporting process through analyzing current daily reporting system. This paper also suggests the direction of the improved daily reporting system to enhance the performance of construction projects through incorporating sub-contractor's participation in daily reporting system.

A methodology for Predicting Equity Input Timing/Amount for Decision Making of Financing Apartment Housing Projects - From the Perspective of Mid-sized Construction Companies - (공동주택 PF사업 참여 의사결정을 위한 자기자본 투입 시점/규모 예측방법론 - 중견 건설사의 관점에서-)

  • Yoo, Jinhyuk;Cha, Heesung;Shin, Dongwoo;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.21-30
    • /
    • 2016
  • The current PF project is entirely relying on construction company's credibility. As such, it has increased a negative and bad recognition in domestic real estate economy. In addition, PF experts has a perception that a project's safety of future cash flow profitability is more important than the construction company's credibility. So many PF experts make an effort in order to set aside safe project structure of PF and analyse systematically the risks of the project. In common feasibility study of the PF Project, financial specialists and real estate specialists are forecasting and evaluating the suitability of the project through reviewing the development profit from the project of sales. However, cash flow analysis and evaluation from the perspective of mid-sized construction companies are still in the primary level. Therefore, this study has analysed the current feasibility study and go/no go decision making procedures. Then the authors have a new cash flow analysis method from the perspective of mid-sized construction companies, by improving the feasibility study and go/no go decision making procedures.

The hierarchical structures of cause-and-effect relationships on the profit factors in overseas construction projects (해외건설공사 수익성 영향인자의 계층구조 및 사레적용에 관한 연구)

  • Han, Seung-Heon;Sun, Seung-Min;Park, Sang-Hyuk;Jung, Do-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.64-76
    • /
    • 2006
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposure through contract negotiation and its adjustment. This research discusses the trend of environment in international construction markets. Then, it identifies the key factors that affect the profitability significantly through the structured surveys from 59 actual overseas projects, and it analyzes the key factors by using statistical methods. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors using the result of statistical analysis, literature review and structuring their cause-and-effect relationships. The profitability casual hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative and quantitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

Distributed Coordination of Project Schedule Changes by Using Software Agents (소프트웨어 에이전트를 이용한 건설공사 공정관리의 분산화)

  • Kim Kee-soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.85-90
    • /
    • 2002
  • In the construction industry, projects are becoming increasingly large and complex, involving multiple subcontractors. Traditional centralized coordination techniques used by the general contractors become less effective as subcontractors perform most work and provide their own resources. When subcontractors cannot provide enough resources, they hinder their own performance as well as that of other subcontractors and ultimately the entire project. Thus, construction projects need a new distributed coordination approach wherein all of the concerned subcontractors can reschedule a project dynamically. To enable the new distributed coordination of project schedule changes, I developed a novel agent-based compensatory negotiation methodology, which allows software agents to simulate negotiations on behalf of their human subcontractors. This research formalizes the necessary steps that would help construction project participants to increase the efficiency of their resource use, which in turn will enhance successful completions of whole projects.

  • PDF

A Basic Study for Establishing Decision Making Governance System in Urban Regeneration (도시재생 개발사업의 의사결정 거버넌스 체계 구축을 위한 기초연구)

  • Shin, Seung-Woo;Lee, Jee-Hee;Yi, June-Seong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.247-251
    • /
    • 2008
  • There are many stakeholder whose interests against the rest and lots of complex projects in Urban Regeneration. Moreover, there are various communication routes and complex decision making structure because the benefits among stakeholder are conflict. Eventually, the lots of decision making task and complex structure cause inefficiency and delay of Urban Regeneration business. This Is a basic study for establishing decision making governance which help efficient decision making in Urban Regeneration. This study was conducted follow process. Through the analysis the Urban Regeneration process and literature study of "Governance", we characterize the decision making of Urban Regeneration, and based on that character we founded "decision making governance composition". Finally we suggest the "Decision Making Governance System Concept in Urban Regeneration"

  • PDF

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

An Analysis of Core Competency of Construction Field Engineer for Cost Management (건설기술자의 원가관리 업무역량 분석 연구)

  • Choi, Jae-Hong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.26-34
    • /
    • 2013
  • Recently, many companies recognize the individual human resource as a core asset of the corporate value creation and devote a lot of effort to develop and manage competency-based human resource in order to strengthen the corporate competitiveness. As the integrated construction company taking the major portion in Korean construction industry, its construction engineers perform the construction supervision task with various related parties at each stage of the life cycle of the construction project. Therefore, the competency of a construction engineer is an important factor which have a direct impact on the success of the construction project. However, the current capability evaluation scheme of the domestic construction engineers is mainly oriented on the qualification factors such as the certificates or the seniority and this is quite different from evaluating the actual ability for construction management tasks. In this point of view, this study proposes the appropriate level of proficiency in cost management by analyzing the work process and its detailed items of the cost management that is the one of the basic management items of the construction industry. Based on this, this study analyzes the current competency level of the construction engineer by comparing with the required competency of each job position and also performs the engineer's work competency analysis of each work step.

The Characteristics of Informal Networks of Venture Companies in Daegu Region (대구지역 벤처기업의 비공식 네트워크)

  • Lee, Chul-Woo;Kim, Myeong-Yeob
    • Journal of the Korean association of regional geographers
    • /
    • v.10 no.4
    • /
    • pp.713-726
    • /
    • 2004
  • This paper aims to investigate the characteristics of innovation activities and informal networks of venture companies in Daegu region. The most important knowledge source of them for innovation is in house. The next are customers, competitors, and public supporters. And it was investigated that regional venture companies have participated in 1-5 informal network organizations. They primarily achieve such knowledges as, technologies, new business opportunities, and marketing information, through participation in informal networks. The reasons why they have taken part in informal networks are to get new informations and acquire new business opportunities. Particularly The informal networks between ventures companies and other regional economic actors have helped the regional venture companies to obtain more economic performance and to establish social capital, such as faith, with other economic actors.

  • PDF

Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.