Estimating the Moments of the Project Completion Time in Project Networks (프로젝트 네트워크에서 사업완성시간의 적률 추정)

  • Cho, Jae-Gyeun
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.22 no.1
    • /
    • pp.61-67
    • /
    • 2017
  • For a project network analysis, a fundamental problem is to estimate the distribution function of the project completion time. In this paper, we propose a method for evaluating moments(mean, variance, skewness, kurtosis) of the project completion time under the assumption that the durations of activities are independently and normally distributed. The proposed method utilizes the technique of discretization to replace the continuous probability density function(pdf) of activity duration with its discrete pdf and a random number generation. The proposed method is easy to use for large-sized project networks, and the computational results of the proposed method indicate that the accuracy is comparable to that of direct Monte Carlo simulation.

인간지놈지도완성과 미래사회

  • Korean Federation of Science and Technology Societies
    • The Science & Technology
    • /
    • v.33 no.6 s.373
    • /
    • pp.43-69
    • /
    • 2000
  • 세계인의 이목이 사람의 유전자정보를 밝히는 인간지놈계획(Human Genome Project)에 집중되고 있다. 인간지놈지도 완성이 몰고올 파장이 엄청날 것으로 보기 때문이다. 인간지놈프로젝트의 배경부터 그 완성의 의미 그리고 산업에 미치는 영향과 벤처기업 및 윤리적인 문제를 총 점검해 본다.

  • PDF

태국의 가리 프로젝트 현황

  • 한국비료공업협회
    • 비료회보
    • /
    • s.567
    • /
    • pp.19-23
    • /
    • 2004
  • 아시아는 세계 속에서 가장 빠르게 성장하는 가리 시장이다. 현재 거의 모든 수요가 다른 지역으로부터의 수입에 의존하고 있다. 2003년에는 1,300만톤 이상의 가리가 Arab Gulf, 발트해, 북미의 태평양 연안 등지로부터 아시아로 수입되었다. 태국의 Asia Pacific Resources 가리 프로젝트는 아시아의 엄청난 양의 가리 수요를 충족시킬 수 있는 가능성을 제공해준다. Mining지 기자인 Yolanda Torrisi는 최근 진행 경과에 따르면 이 프로젝트는 거의 완성되어 그 윤곽이 드러나고 있다고 한다.

  • PDF

A development of MTP e-portfolio evaluation model for the college students of science and engineering school (이공계 대학 학부생을 위한 MTP(Muti-grade Tutoring Project) e포트폴리오 평가 모형 개발)

  • Choi, Young-Mee;Choo, Moon-Won;Han, Young-Shin
    • Journal of The Korean Association of Information Education
    • /
    • v.10 no.3
    • /
    • pp.413-422
    • /
    • 2006
  • MTP(Multi-graded Tutoring Project) is a designed curriculum needed to perform a high quality project to improve teamwork and major skills for college student of science and engineering. Each student can experience teaching activities as a tutor and learning activities as a tutee in the MTP for three years. Through this curriculum, students are expected to obtain the capabilities to set up and search the goal of given projects, to make human network among multi-graded students and professionals which could be critical for finding careers, and to perform graduation projects in a more systematic and co-operated way, resulting in highly-qualified outputs. In this paper, MTP e-portfolio evaluation model is suggested. This model evaluates the individual-level performance operating in MTP curriculum. The evaluation model is described with three dimensional structure composed of participator, changes in learning, and learning processes. The resultant model could be utilized as tools for evaluating the curriculum set up for the multi-graded project-based teaching environment.

  • PDF

0-1 정수계획모형을 이용한 트랜스포터 일정 계획

  • Kim, Jeong-Min;Lee, Myeong-Ho;Kim, Si-Hwa
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.06a
    • /
    • pp.229-231
    • /
    • 2014
  • 조선 프로젝트는 일반적으로 많은 블록 공정들을 거쳐 완성된다. 하나하나의 블록들이 일정에 따라 완성되면 다음 단계의 공정을 위한 플랜트로 이동하게 되는데 이러한 공정에 따른 블록 수송을 원활하게하기 위해 블록 수송계획을 세운다. 블록 트랜스포터는 블록 수송을 위한 주요 장비인데 트랜스포터의 일정 계획은 계획된 조선 프로젝트 완성을 위한 전체적인 일정 관리에 매우 중요한 문제이다. 본 연구에서는 트랜스포터의 일정계획 문제를 0-1 정수계획 모형으로 정식화하여 최적일정계획을 수립하는 방법을 제안하였다.

  • PDF

Sensitivity Analysis of Expected Project Completion Time in a PERT Network with Discrete Distributions (이산형 활동시간 분포를 갖는 PERT 네트워크에서 평균사업완성시간과의 민감도 분석)

  • Cho, Jae-Gyeun;Park, Chul-Jae
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.12 no.1
    • /
    • pp.108-117
    • /
    • 2007
  • For a PERT network the sensitivity analyses are valuable tools for effective management and control of a project. In a previous article, a method was developed for the sensitivity analysis of the expected project completion time (${\mu}_{T}$) with respect to the expected duration of an activity (${\mu}_{i}$) under the assumption that the durations of activities are independent and normally distributed. In the present article, a method is presented for the sensitivity analysis of ${\mu}_{T}$ with respect to ${\mu}_{i}$ when the durations of activities are independent and follow discrete distributions, which utilizes the previous sensitivity analysis method with modifications. The accuracy of the proposed method is assessed using various example PERT networks, and the computational results indicate that the accuracy is comparable to that of direct Monte Carlo simulation.

  • PDF

Development of Work Breakdown Structure Basis for Mega-Project (메가프로젝트를 위한 업무분류체계기준(WBS Basis) 개발)

  • Lee, Hei-Duck;Seo, Yonng-Chil;Lee, Seung-Hoon;Woo, Yu-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.441-444
    • /
    • 2008
  • 메가프로젝트(Mega-Project)는 다양한 유형의 시설군을 복합 개발하는 건설사업으로서 규모가 크고 복잡한 경우가 많기 때문에 종합적인 사업관리에 어려움이 따른다. 따라서 메가프로젝트는 기존의 단위프로젝트 수준이 아닌 프로그램 수준에서의 관리체계를 필요로 하며 그에 적합한 업무분류체계(WBS)를 구축해야 한다. 업무분류체계는 사업관리를 위한 전체적인 구조를 수립하는 기반으로서, 현재 프로그램 관리 수준의 업무분류체계의 기준이 갖추어지지 않은 상황이다. 이에 본 연구에서는 메가프로젝트를 위한 업무분류체계기준(WBS Basis)를 개발하여 메가프로젝트의 업무분류체계 구축을 지원하고자 한다. 메가프로젝트 생애주기에 포함되는 전체 시설군, 업무 및 용역, 기록문서, 정보 등을 대상으로 하였으며, 기존 사례분석과 관련 분류체계들을 바탕으로 초안을 작성하였다. 이후 현장시험을 통한 검증을 거쳐 최종 업무분류체계기준을 완성하였고 분류내용과 활용방안을 소개한다.

  • PDF

Qualitative Analysis of IT fused Mentorship Project Performance with Gifted Secondary Students in Information Science Class (정보 영재반 중학생들의 IT 융합 사사 프로젝트 수행에 관한 질적 분석)

  • Jun, Youngcook
    • The Journal of Korean Association of Computer Education
    • /
    • v.19 no.4
    • /
    • pp.45-58
    • /
    • 2016
  • This paper tried to analyze cases of one year team-based project of gifted students who spent two year programs in a math-IT integrated class as part of formative evaluation and extracted the factors associated with future enhancement for the program. The researcher as an advisory professor tried to guide the students as minimally as possible considering their levels of IT skills so that they could self-directedly perform the IT-fused project on a team basis. The data collection included documents, annual report, photos, video, artifacts and interview data with the students for the whole team project carried out between February and December, 2015. The overall pattern of the project activities has been stabilized in the middle of the course compared to the initial stages of brainstorming and design work even though the students revealed the differences of their programming skills and preferences toward the project theme. Their project outcomes were qualitatively analyzed according to the 9 steps of R&E model and has shown individual differences according to low, middle and high level. At the end, the analysis suggested several implications for further improvement of the mentorship program.

An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off (BIM기반 물량산출 완성도 측정을 위한 지수 개발)

  • Lee, Chang-Hee;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.79-92
    • /
    • 2011
  • Quantity take-off is one of the critical tasks that determine the cost of a construction project, and its result should be accurate and reliable. BIM-based quantity take-off is a very attractive process for practitioners since the quantity take-off can be done automatically in a fast and accurate way. However, the result of BIM-based quantity take-off can be varied depending on how BIM was modeled. As a project progresses, more detailed design information is getting available, and it can be expected that the degree of completeness and accuracy for the BIMbased quantity take-off is going to be improved as well. However, when estimation is performed at each stage of a project life-cycle, there is no way to measure or forecast how accurate of the quantity take-off result from the BIM data given at the current stage. Therefore, this research derived factors that affect the BIM-based quantity takeoff and developed a methodology and framework to measure and forecast the completeness of BIM-based quantity take-off. The measurement framework and index that are proposed by this research was verified and validated for their consistency and feasibility through six pilot projects.