• Title/Summary/Keyword: 프로젝트 수행

Search Result 1,706, Processing Time 0.028 seconds

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

CM at Risk Case Study on Guaranteed Maximum Price Contract - Focused on Cases for USA - (책임형 CM 발주방식의 최대공사비보증계약 사례연구 - 미국 공공발주 프로젝트 사례 중심 -)

  • Jeong, Jinhak;Han, Jonghoon;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.22-30
    • /
    • 2019
  • The purpose of this study is to derive basic data of the Guaranteed Maximum Price(GMP) process and to present specimens that can be used at the time of execution of CM at Risk project in South Korea. CM at Risk project is issued in South Korea, but the actual data is lack. On the other hand, CM at Risk project is universalized and the market of the CM at Risk is steadily growing. Because of that, in this study, The United States cases was selected as a sample. GMP consists of CM's fee, CM contingency, project direct cost, project indirect cost, allowance. GMP negotiations are performed before the end of design completion, and after 3 rounds of estimation comparison, preliminary GMP is confirmed. GMP can be multiple contract and it is useful for Procurement of long lead materials and early construction. If the actual cost is lower than expected GMP, sharing of the saving is an option since the conflict of interests between the client and the contractor can occur.

A Definition and Evaluation Criteria for Software Development Success (소프트웨어 개발 성공의 정의와 평가기준)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.2
    • /
    • pp.233-241
    • /
    • 2012
  • The object of the project management is to succeed in the project. However, could you definitely judge that the result of project performance is a success? In addition, do both customer and developer agree with the result of your judgement? There are a lot of definitions and measure for the success and failure of the software development suggested, but there is no definite standard for the classification. This paper examines the measures in order to decide the development success and re-defines the success and the failure of the project. We suggest the measure and the standard that judge the project achievement based on these definitions. Applying the suggested measure and standard, it is possible to reduce arguments between the customer and the developer on the classification of the success and the failure.

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

The Study on Software Maintenance Project Efforts Estimation Using Function Point (기능점수기법에 의한 소프트웨어유지보수 프로젝트의 소요인력 규모추정)

  • Ahn, Yun-Sik;Kim, Hyun-Soo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2002.11a
    • /
    • pp.286-292
    • /
    • 2002
  • 국내기업에서 대부분의 정보시스템이 정보시스템 수명주기로 불 때 운영단계로 진입하고 조직의 정보시스템의존도 및 시스템규모가 점점 늘어남에 따라서 정보시스템의 운영과정에서 발생되는 소프트웨어 유지보수에 투입되는 비용도 증가되고 있다. 그러나 소프트웨어유지보수 프로젝트에 소요되는 투입인력 규모예측에 관련된 연구는 소프트웨어개발부문에 비해 적은 것이 사실이다. 본 연구에서는 유지보수프로젝트를 대상 소프트웨어의 규모는 IFPUG에서 개발된 기능점수기법(function point model)을 적용하여 산정하고, 특정 소프트웨어유지보수 프로젝트 생산성에 영향을 미치는 유지보수환경, 프로덕트, 투입인력 등 3개 영역에서 도출된 총 10개 특성을 보정요소로 설정한 후, 유지보수프로젝트의 소요인력 규모를 추정하기 위한 비선형회귀모형을 제시하고 있다. 실제 수행된 26개 유지보수프로젝트로부터 수집한 실적데이터를 이용하여 이 모형을 실증 분석한 결과 유의한 모형임이 밝혀졌다.

  • PDF

Software Reliability Prediction Incorporating Information from a Similar Project (ACE64/256) (유사 프로젝트(ACE64/256)로부터 얻은 경험 데이터에 의한 소프트웨어 신뢰도 예측)

  • Lee, J.K.;Shin, S.K.;Nam, S.S.;Park, K.C.
    • Electronics and Telecommunications Trends
    • /
    • v.15 no.5 s.65
    • /
    • pp.94-102
    • /
    • 2000
  • 시험기간 동안 수집된 고장 데이터를 이용하여 소프트웨어 신뢰도를 예측할 수 있는 모델은 많으나 이 예측 방법은 정확하지 못하며, 특히 초기 시험 단계에서는 더욱 더 부정확하여 예측자들은 이러한 소프트웨어 신뢰도 모델의 적용을 주저한다. 한편 소프트웨어 신뢰도 성장 모델은 유사 프로젝트나 개발 초기에 얻은 정보를 가지고는 신뢰도 예측 데이터로 활용이 불가능하다. 예를 들면 최근의 소프트웨어 시스템들은 항시 유사 프로젝트들로부터 활용이 가능한 일련의 정보와 동일 응용 영역의 초기 또는 최신의 정보들이 변경, 개선되기 때문이다. 본 논문에서는 유사한 프로젝트로부터 얻은 공통의 데이터들을 활용하여 소프트웨어 신뢰도를 예측할 수 있는 방법들을 제안한다. 특히 일반적으로 사용되고 있는 Goel-Okumoto(G-O) 모델이나 고장 검출률을 이용하거나 시험 데이터를 활용하는 방법 등을 이용하여 모델 파라미터를 추정하고 실제 프로젝트 수행중에 얻어진 각종 결과를 토대로 해서 Numerical Algorithm이 아닌 통계적인 관점의 분석 결과와 MLE(Maximum Likelihood Estimation) 추정 방법 등을 동원하여 초기에 우리 프로젝트에 맞는 정확한 소프트웨어 신뢰도 평가 방법을 제안하였다.

KMTNet 프로젝트의 교육적 활용

  • Baek, Chang-Hyeon;Park, Byeong-Gon;Kim, Seung-Ri;Lee, Chung-Uk;Lee, Jae-U;Lee, Dong-Ju;Lee, Gang-Hwan;Park, Sun-Chang
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.94.2-94.2
    • /
    • 2012
  • NASA는 지난 15년간 주요 과학미션 비용의 약 1%를 교육과 public outreach에 투자했으며 NSF 천문학분야 연구비의 약 6% 이상이 교육과 특별활동에 사용되고 있다는 보고가 있다. 국내 천문학 연구 프로젝트에서도 교육 및 public outreach에 대한 예산 할당과 프로젝트의 교육적 활용 및 대국민 홍보 활동을 위한 구체적인 연구가 필요한 상황이다. 이번 연구에서는 국내 천문학 연구 프로젝트의 교육적 활용을 위하여 1)NASA의 과학미션과 관련된 교육자 가이드들을 사례조사 하였고, 2)사례조사 결과와 2007 개정 과학과 교육과정을 고려하여 KMTNet 프로젝트의 교육자 가이드를 e-book 형태로 개발 하였다. 이번 발표에서는 개발된 교육자 가이드의 배포 및 활용 방안과 국내에서 수행중인 천문학 프로젝트(KVN, GMT, SKA, ALMA 등)들의 교육자 가이드 제작을 위한 사업방안을 소개하고 산업체, 학교, 연구기관에 종사하는 분야별 전문가들로 부터 다양한 의견을 청취하고자 한다.

  • PDF

Research of KQI(Key Quality Indicators) Dashboard for the successful opening of the Project (성공적 프로젝트 오픈을 위한 핵심품질지표 Dashboard 활용에 관한 연구)

  • Park, YoungJin;Lee, SeoukJoo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2014.11a
    • /
    • pp.687-690
    • /
    • 2014
  • 프로젝트는 계획된 시간과 예산 범위 내에서 최적의 자원을 활용하여 사용자가 만족할 만한 수준의 품질을 구현하여 성공적으로 종료함을 그 목적으로 하고 있으나, 근래 금융권을 중심으로 수행되고 있는 차세대 프로젝트는 사업 범위 및 연계 시스템이 방대하여 성공적 오픈을 쉽게 보장할 수 없는 상황이다. 본 논문에서는 금융권 차세대 프로젝트를 중심으로 활용되어 성공적인 오픈에 기여한 핵심 품질 지표 대시보드 사례를 분석하고 이를 통해 핵심 품질 지표의 식별과 대시보드의 활용의 필요성 등에 대한 당위성 등을 제시하고자 한다. 본 연구의 성과는 금융권 차세대 프로젝트를 참조로 하여 추후 다양한 프로젝트가 보다 완벽한 품질을 확보한 상태에서 안정적으로 시스템을 오픈할 수 있도록 기여하는데 있다.

A study on the effect of the information system audit quality on the audit and project performance and re-purchase intention. (정보시스템 감리품질이 감리성과와 프로젝트성과 및 재구매의도에 미치는 영향)

  • Kim, Dong-Soo;Kang, Jae-Hwa;Yang, Kyung-Sik;Kim, Hyun-Soo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.449-454
    • /
    • 2006
  • 본 연구는 감리품질에 따른 감리성과와 프로젝트성과에의 영향으로 감리의뢰기관이 해당 감리기관에 재구매의도 또는 재계약의도에 대한 영향을 조사하였다. 연구결과, 설정된 연구모형을 중심으로 전반적인 분석을 수행하였으며, 경로분석 결과 모든 영향관계가 유의한 것으로 나타났다. 감리품질이 프로젝트성과와 감리효과 및 만족도에 정의 유의한 영향을 미치는 것으로 나타나 프로젝트성과와 감리 효과 및 만족도를 향상시키기 위해서는 감리품질뿐만 아니라 감리품질에 영향을 미치는 감리서비스요인에 대해 판단할 필요가 있으며, 감리효과와 만족도가 높으면 재구매에 정의 영향을 미치고, 프로젝트 성과가 높으면 재구매에 정의 영향을 미치는 것으로 나타났다.

  • PDF