• Title/Summary/Keyword: 프로젝트 계약

Search Result 131, Processing Time 0.025 seconds

An Empirical Study on Absorptive Capacity, Perceived Incentive Benefit and the Quality of Collaboration in Project-based Supply Chain (프로젝트 공급망 참여기업의 흡수능력, 지각된 인센티브 혜택 및 협업의 질에 관한 실증연구)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.11 no.7
    • /
    • pp.83-95
    • /
    • 2013
  • Supply chain management for engineering project focuses on planning acquisitions, identifying and choosing the right suppliers and subcontractors, planning and negotiating appropriate contracts, and administering the collaboration with the suppliers and subcontractors. This paper aims to identify the determinants of SCM performance of the suppliers and subcontractors participating in the project-based supply chain. This study proposes the absorptive capacity, fairness of suppliers' evaluation, the quality of collaboration and incentives as major research variables, and collected the survey responses from the suppliers and subcontractors having experiences with major engineering projects. The statistical results indicate that the incentives, absorptive capacity and the quality of collaboration influence SCM performance of suppliers, and that the fairness of suppliers' evaluation has some impact on the incentives and the absorptive capacity. But on the contrary to our expectation, the incentives have no significant impact on the level of absorptive capacity.

Developing a Project Management Information System for Construction Claims (건설 클레임에 대비한 정보관리시스템 개발)

  • Wang, Hankyeom;Park, Junil;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.70-81
    • /
    • 2018
  • Claims in the construction industry can have a serious impact on the profitability of the project or can even result in project failure if it fails to take appropriate prevention. In order to properly prevent and respond to the potential claims and legal disputes throughout the project execution, it is necessary to continuously accumulate informations and clearly define the roles and responsibilities of the important activities systematically. Based on these needs, this study develops and verifies the project information management system(PMIS) that can prevent and respond possible claims for construction projects. Developed system includes such management modules as schedule, cost, PM/CM, design, collaboration, and claims. The system was validated by adopting it to the practical projects. The results showed that information systems tailored to the construction claim need to elevate users' familiarity to be more useful. Besides, the system can be more functional when used by both owners and contractors.

A Study on Development of Maintenance Cost Estimation System for BTL Project of Education Facilities Using Optimization Methodology (최적화기법을 활용한 교육시설물 BTL 사업 운영관리비용 비용예측 시스템 개발 기초연구)

  • Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jea-On
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.45-57
    • /
    • 2009
  • BTL (Build-Transfer-Lease) Project for Education Facilities are contracted as a package which consists of several education facilities. The general maintenance period of BTL project for education facilities is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Project. This research develops a cost forecasting system using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. This system helps owner's decision-making to estimate the total project cost with various constraints changing. The result of this research suggests more reasonable and effective forecasting model for the maintenance facilities package in the BTL project.

A Study of the Influencing Factors for Decision Making on Construction Contract Types : Focused on DoD Construction Acquisitions with Firm Fixed Price and Cost Reimbursable in FAR (건설공사 대가지급방식의 의사결정 영향요인에 관한 연구 - 미국 연방조달규정에 따른 미국 국방성의 정액계약과 실비정산계약을 중심으로 -)

  • Son, Young-Hoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.23-35
    • /
    • 2024
  • This study analyzed the correlation between each of the 12 influencing factors in FAR 16.04 and the decision-making process for construction contract types, using data from a total of 2,406 DoD Construction Acquisitions spanning from 2008 to 2022. The study considered 12 independent variables, grouped into 4 Characteristics with 3 factors each. Meanwhile, all other contract types were categorized into two types: Firm-Fixed-Price (FFP) and Cost-Reimbursement Contract (CRC), which served as the dependent variables. The findings revealed that FFP contracts significantly dominated in terms of acquisition volume. In line with prevailing beliefs, logistic data analysis and Analytical Hierarchy Process (AHP) analysis of Relative Weights from Experts' Survey demonstrated that independent variables like Uncertainty of the Scope of Work and Complexity found out to be increasing the likelihood of selecting CRC. The number of contractors in the market does indeed influence the possibilities of contract decision-making between CRC and FFP. Meanwhile, the p-values of the top 3 influencing factors on CRC from the AHP analysis-namely, Appropriateness of CAS, Project Urgency, and Cost Analysis-exceeded 0.05 in the binominal regression results, rendering it inconclusive whether they significantly influenced the construction contract type decision, particularly with respect to payment methods. This outcome partly results from the fact that a majority of respondents possessed specific experiences related to the USFK relocation project. Furthermore, influencing factors in construction projects behave differently than common beliefs suggest. As a result, it is imperative to consider the 12 influencing factors categorized into 4 Characteristics areas before establishing acquisition strategies for targeted construction projects.

The Current State and Application of project Financing followed by Sale after Building System of the Apartment (공동주택 후분양 전환에 따른 프로젝트 금융의 현황 및 활용방안)

  • Lee Sung-Rock;Moon Hwi-Young;Lee Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.218-225
    • /
    • 2004
  • The supply for the apartment complex in Korea has been accomplished by the sale before building system as a way of institutional means to support massive housing supply in the past. Although this sale before building system has helped the provision of the housing, the necessity of that has been weakened in the current housing market. As this market is changed to emphasize on consumer, the necessity of conversion to sale after building system was raised and finally enforced partially. However, the sale after building system has difficulty in ensuring construction fund and the safety of housing business. So, the diversification in the style of business structure we and the strategy for the activation of construction fund will solve these problems. Consequently, this essay examine the change and influence in the construction fund after adopting sale after building system and suggest the appropriate strategy in project financing for providing fund and reducing the risk in construction business.

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.

Preliminary Analysis of the Bid Success Ratio according to the Characteristics of Overseas Construction Projects (해외건설 프로젝트 특성에 따른 입찰 성공률 분석에 관한 기초연구)

  • Kim, Seung-Won;Lee, Kang-Wook;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.122-133
    • /
    • 2019
  • In the construction industry, bidding competitiveness is the most basic and important competence of the company. Bidding competitiveness comes from competitive advantage, but the strategy of the company to capture bidding competitiveness varies with the characteristics of the project. In particular, overseas construction is where uniqueness of the construction industry and the specificity of international business coexist. This study analyzes the bidding success ratio and the level of bidding difficulty by project characteristics with 12,952 overseas construction bidding cases. Consequently, it was found that the bidding success ratio of Middle East and North Africa (MENA) and civil engineering was the lowest in each group of project characteristics, and therefore the level of bidding difficulty is high, respectively. In addition, it was confirmed that the bidding success ratio of small size or short duration project was relatively high, and the bidding success ratio of both the negotiated bidding in the bidding method group and the private sector in the client type group was respectively high. However, Kruskal-Wallis test in contract type and period shows that there is no statistically significant difference in the bidding success ratio by group.

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.

Study on Procedure for Escrow Account to Resolve Controversy of Intellectual Property Right of Software for Rolling Stock (철도차량 Software 지적 재산권 분쟁 해결을 위한 Escrow Account 적용 절차에 대한 연구)

  • Park, Jun-Hyung;Cho, Chi-Hwan;Kang, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1479-1485
    • /
    • 2008
  • This paper shows the result of study on the detailed applicable procedure of software Escrow account applied for rolling stock. The customer as end-user requires software source code, related critical technical documents etc. about software based system of train for maintenance purpose through software modification and enhancement after completion of warranty period. Otherwise, it is not easy to keep up with the customer's requirement of demanding supplier's exclusive information because it is considered as intellectual property rights of supplier as software developer. Therefore, the main contractor(normally called as Car-builder) need to introduce software Escrow service in order to coordinate the different a standpoint between software developer and end-user. Software Escrow is a legal arrangement in which an software Escrow packages (software source code, software development tool, build process, proprietary information, copyright and etc.) is deposited into and Escrow account under the trust of a reliable third party (Escrow agent) depending on mutual agreement on Escrow contract condition as signing off Escrow agreement document. This paper deals with the study on the detailed procedure about the following general category of Escrow procedure and purpose to apply this specific procedure of Escrow into the future project onward.

  • PDF