• Title/Summary/Keyword: 프로젝트 경영

Search Result 557, Processing Time 0.03 seconds

An Analysis on the Priority of Educational Needs of Teachers in Charge of Educational Contents of Invention Intellectual Property in Secondary Vocational Education (중등단계 직업교육에서의 발명·지식재산 교육내용에 대한 담당 교사의 교육요구도 우선 순위 분석)

  • Lee, Sang-hyun;Lee, Chan-joo;Lee, Byung-Wook
    • 대한공업교육학회지
    • /
    • v.40 no.2
    • /
    • pp.155-174
    • /
    • 2015
  • The purposes of this study were to analyze the property of educational needs of teachers for educational contents of invention and intellectual property in secondary vocational education and provide fundamental data for the development of job training programs so as to develop the capabilities of teachers, the base for effective education of invention intellectual property in secondary vocational education. To achieve them, educational needs for the educational contents of invention intellectual property and the priority of the educational needs in secondary vocational education based on the recognition of the teachers were analyzed and suggested. Concrete results of this study can be suggested as follows. First, the average of educational needs of the teachers for the educational contents of invention intellectual property in secondary vocational education was 5.02. There were 23 items of the educational contents whose educational needs were higher than the average of the whole items and for those items and the average of each item, there were F4(The average of patent applications) 6.72, F5(Modification and supplementation of specification sheets) 6.46, F2(Writing of patent floor plans) 6.39, F3(Writing of patent specification sheets and abstraction) 6.31, A5(Invention method and activity) 6.27, E6(Invention design project) 6.15, H3(Invention commercialization) 5.97, F1(Patent information and application) 5.90, E5(Design obligation) 5.78, E3(Designing process of inventional design) 5.77, A4(Invention and problem solving) 5.57, G2(Patent investigation and classification) 5.47, C2(Thinking method of inventional problem solution) 5.45, E4(Production of inventional design product) 5.45, B5(Inventional patent project) 5.42, A2(Creativity development) 5.26, C4(Inventional problem solving project) 5.26, H4(Invention marketing) 5.26, H2(Analysis on invention commercialization) 5.20, D4(Invention and management) 5.16, C3(Problem solving activity) 5.14, E2(Inventional design devise and expression) 5.11, B3(Actuality of inventional method) 5.08 in order. Second, for the priority of educational needs of the teachers for the educational contents of invention intellectual property in secondary vocational education, there were 13 items of the educational contents for the first rank, 10 for the second rank and 17 for the third rank. The items of the educational contents for the first rank were A4(invention and problem solving), A5(inventional method and activity), B5(Invention patent project), C2(Thinking method of inventional problem solution), C4(Inventional problem solving project), E3(Inventional design process), E4(Production of inventional design product), E5(Design obligation), E6(Invention design project), F1(Patent information and application), F2(Writing of patent floor plan), F3(Writing of patent specification sheet and abstract), and H3(Invention commercialization. The items of the educational contents for the second rank were A2(Creativity development), B3(Actuality of inventional method), C3(Problem solving activity), D4(Invention and management), E2(Invention design devise and expression), F4(Range of patent demand), F5(Modification and supplementation of specification sheet), G2(Patent investigation and classification), H2(Analysis on invention commercialization), and H4(Invention marketing). The items for the third rank were the educational contents except the ones of the first rank and the second rank.

The Key Success Factors of University Entrepreneurship Education: Implication from USA University Cases (대학 창업교육 핵심 성공요인: 미국 대학 사례의 시사점)

  • Choi, Jong-In;Park, Chygwan
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.8 no.3
    • /
    • pp.85-96
    • /
    • 2013
  • Entrepreneurship courses and programs in Korean universities tend to increase steadily but seem to have some limitations. They are usually recognized as another domain of Business Administration. Entrepreneurship program is practical like Business Administration but should be much more interdisciplinary than that. Because Korean Entrepreneurship programs are in the early stage, they must be reinforced with factors such as education culture, faculties, curriculum and relationships with communities. This study aims to get some implications from Entrepreneurship programs have been run by universities in America in order to facilitate Entrepreneurship program in Korean universities. Based on 11 success factors found by our case universities' Entrepreneurship programs and Kauffman Campus, this study has drawn implications of critical success factors of Entrepreneurship programs as follow. First of all, because Entrepreneurship programs should focus on Entrepreneurship mind sets such as innovative idea generation and courage to overcome risk, it is more desirable that Entrepreneurship programs are introduced in all departments of universities such as Arts, Science and Engineering. These programs also need to take interdisciplinary approach and required to be opened from liberal arts course. In order to be sustained during all their academic careers, vision, mission and strategy for Entrepreneurship programs should be based on strong leadership and support of top leaders. Entrepreneurship culture of each university is also one of the most important success factors. Entrepreneurship programs not only as major programs but also as specific Entrepreneurship minors designed for departments such as Arts, Science and Engineering could be considered according to each university's situation. This study also suggest to make a motivation system for Entrepreneurship faculties, Ph d. programs for Entrepreneurship, communication network for Entrepreneurship programs and mentor system in community. To begin Entrepreneurship programs, it also needs to develop good education contents as many as possible. When it concerned with teaching method, project based 4 year program can be suggested to be effective and efficient. To introduce project based program that should be consistent till participants' graduation, university must prepare regulations to support team teaching, mentor and interdisciplinary cooperation. To dissipate the concept that Entrepreneurship is another version of management, this study support the idea that Entrepreneurship programs should be designed and run by independent and central-focused governance system, Entrepreneurship education center.

  • PDF

Efficient Application Way of Six Sigma at Railway Construction Project (철도건설사업의 6시그마의 효율적 적용방안)

  • Hong, Sung-Heui;Jung, Sung-Bong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1251-1262
    • /
    • 2011
  • K-company, being in charge of domestic railway construction and facilities management, got a success rate of 41% with the implement of a improvement scheme by prosecuting of 6 Sigma and the achievement of CTQ (Success criteria : more than 0.5 in achievement of CTQ). It is clear that the factors having an effect on achievement of CTQ are the level of project when pushing forward the project(Big Y and small y according to the scope of the work), the degree of interest of an officer in charge like sponsors, and the continuous feedback toward the implement of a improvement scheme. For improvement CTQ achievement, firstly redefine about a type of project. Secondly, derive small y by Big Y and derives a unit work by small y. Then grouping the unit works and achieve Big Y by performing of every unit work as an executive subject. Thirdly organize a committee of subject selection which is supervised by the general manager. Therefore exhibit staff's leadership, for example motivation, by strong incentives. Lastly, provide ongoing learning and enhance system monitoring about a result management of an betterment execution department.

  • PDF

Priority Analysis of Project Stage-wise Risk Factors : Focusing on New Product Development Projects in ICT Industry (프로젝트 단계별 리스크 요인들의 우선순위 분석 : ICT(정보통신기술)산업 분야의 신제품 개발 프로젝트를 중심으로)

  • Jang, Heeseok;Choi, Sungyong;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.72-82
    • /
    • 2018
  • In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.

An Empirical Study on the Impact of China's One Belt and One Road Initiative on Asian Countries and North Korean Economy in the Aspect of Digital Transformation of the 4th Industrial Revolution (4차 산업혁명의 디지털 트랜스포메이션 측면에서 중국의 일대일로 구상이 아시아 국가와 북한 경제에 미치는 영향의 실증 연구)

  • Park, Chul-Soo
    • Knowledge Management Research
    • /
    • v.21 no.4
    • /
    • pp.59-88
    • /
    • 2020
  • This study is to examine the influence of Asian countries on the economic field, and to explain the characteristics and purposes of China's Belt and Road Initiative using data analysis. The purpose of this study is to identify and analyze the influence and characteristics of China's One-to-One Road Initiative on the economic sector by examining trade and investment in Asian countries adjacent to China. In particular, the One-to-One Road initiative is proceeding in a way that connects China and neighboring countries. It is to understand the dependence of the Asian countries in China on the Chinese economy. In addition, it is intended to derive implications by grasping and evaluating what the level is based on data. This study also attempts to grasp the influence and ripple effects of the one-on-one strategy on the Chinese economy and the North Korean economy, where dependence is deepening. Recently, the strategy for Asian countries through a one-to-one initiative in China has been restructured in the framework of the construction of the "21st century Maritime Silk Road" and emphasizes the cooperation mechanism led by the country. In progress of the one Belt and One Road, Chinese ICT companies are remarkable. This study looked at the influence of China's digital one Belt and One Road on Asian countries.

Categorization of UX method based on UX expert's competence model (UX 전문가의 역량 모델에 기반한 수행역량유사도에 따른 UX 방법론 분류에 대한 연구)

  • Lee, Ahreum;Kang, Hyo Jin;Kwon, Gyu Hyun
    • Design Convergence Study
    • /
    • v.16 no.4
    • /
    • pp.1-16
    • /
    • 2017
  • As the local manufacturing industry has entered a phase of stagnation, service and product design based on user experience has been highlighted as an alternative for the innovation. However, SMEs(Small and Medium-sized Enterprises) are still struggling to overcome the current crisis. One of the reasons is that SMEs do not have enough contact points with the validated UX firms and experts. Thus, SMEs has a high barrier to invest in new opportunity area, user experience. In this study, we aim to figure out UX experts' competence to perform the UX method to solve the UX problems based on the KSA framework(Knowledge, Skill, Attitude). Based on the literature review and expert workshop, we grouped the UX method according to the similarity of the competence required to conduct the method. With cluster analysis, 5 different groups of UX method were defined based on the competence, Panoramic Analysis, Meticulous Observation and Analysis, Intuitive Interpretation, Agile Visualization, and Logical Inspection. The results would be applied to compose a portfolio of UX experts and to implement a mechanism that could recommend the professional experts to the company.

A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims (해외 대형건설공사 공기지연클레임의 공기연장기간 입증방법)

  • Kim, Young-jae;Kim, Tae-kyoung;Jo, Duk-sang;Lee, Hwang-ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.165-176
    • /
    • 2015
  • Recently many Korean large-sized construction companies as well as specialty contractors have been expanding their business in the overseas market to mitigate impacts from long-term stagnation in the domestic market. Such as a result, it has been arisen as a major issue that contractors effectively manage the delays which have been commonly faced with in international mega-projects. Therefore it can be said that the ability of the delays management leads a success of project. This paper presents a review of literature for delay analysis methods such as time impact analysis(TIA) and raises practical problems to rationally substantiate the duration of extension of time(EoT) in international mega projects which have wide scope of works as well as complicated and detailed contract baseline programs by taking theoretical approaches. We suggest the two improvement concepts to substantiate the EoT claims which are effectively applicable to practical projects. The first is to sort out dominant delays among numerous delays in advance of applying a delay analysis. The second is to set up the delay sections with the advanced concept for analysing delays' effects by TIA. This study performed a case study on an actual international mega-project. to confirm the effectiveness of improvement concepts that this practical approach is applicable for the assessment of EoT. In conclusion, this paper supposes to provide practitioner in charge for an EoT claim with an advanced substantiation methodogy when they not only analyse the construction delays by using TIA, but also negotiate with stakeholders about with the assessment of EoT.

Improvement of the Code Classification Structure in Piping Material Management for Petrochemical Plant Projects (석유화학 플랜트의 효율적 배관자재 관리를 위한 코드분류체계 개선)

  • Lee, Jong-Pill;Moon, Yoon-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.1
    • /
    • pp.39-49
    • /
    • 2015
  • The objective of this study is to improve the classification structure of commodity code for piping material management which is considered as the fundamental of commodity code and piping material management system. It enhances the efficiency of piping material management directly or indirectly affecting the engineering, procurement and construction in a petrochemical plant projects. To establish an improved code classification structure, this study identifies the problems of former code classification structure in details, as well as the characteristics of other domestic and global EPC company's code classification structures and presents the improved direction considering the recently mega-sized and specialized projects. Accordingly, to efficiently enhance piping material management, the improved code classification structures have been derived from defining suitable code classification structure for specific piping component, adding more standard attribute, expanding the number of code digits and classifying code hierarchy. The results of applying the improved classification structure of commodity code to on-going project have led to reduce the rate of rework from 4.98% to 2.48% for developing purchase description and also have saved working time for executing piping design by 3D modeling from 6 months by two persons to 4 months by a person which is decreased 67% consequently. In addition, the structures of pyramid code management have resulted to accumulation and analysis of the various piping data for other disciplines such as procurement and estimation team which require commodity code information through the company's material control system.

  • PDF

Problem Analysis and Improvements Plans for PF ABCP of Apartment Housing Development Projects (공동주택 PF ABCP의 문제점 분석 및 개선방안에 관한 연구)

  • Kim, Soo-Yeol;Hwang, Uk-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.133-142
    • /
    • 2011
  • The purpose of this study is to analyze the problems of the parties involved in the issuance of apartment housing development projects. The adapted research method selected four apartment housing development as PF ABCP projects. This study carried out the case about participant institution of PF ABCP funding project including developer, constructor, financial institution so as to draw problems by participant institution. On the basis of the selected case, this thesis proposes methods for involved parties to negotiate and work out problems of the PF ABCP. The results of this study are as follows 1) Launching long-term project financing should be developed, including operating funds and strengthen the ABS and ABCP issuance of credit assessment procedures, combined with the simplicity of the instruments. 2) The Low-risk contract for the construction of simple managerial focus should be the construction, financial institutions essentially dependent on project financing feasibility verification purpose loans to prevent the division a true story, the development should be of interest to be preserved. The proposed included, among other, partial guarantee based on the construction plan financial institutions' share-based investment, and the supplement of legal issues.

A Study on the Importances, Usages, and Contributions of IT system between Line and Project base processes (정보시스템의 중요도, 활용도, 기여도에 관한 제조업 현장인식에 관한 연구 - 공정간 차이에 대한 IPA 분석을 중심으로)

  • Hyun, Mincheol;Cho, BooYun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5942-5954
    • /
    • 2015
  • IT system in supply chain management(hereafter, SCM) has been regarded as one of competitive advantage to win over competing supply chain. SCM participants rush to adopt IT system to be agile for changing environment. Companies expect the improvement of the process integration over the supply chain, which enhance the overall SCM performance. IT system has been considered to influence on effective communication over the wall of firm boundaries. But, the profitability or the effectiveness of IT investment are controversial. This study try to reemphasize the importance of IT system considering the differences of processes, and the influences on the collaboration of supply chain participants. We want to know the perception level of functional managers for the importances, usages, and contributions of IT system in manufacturing sector. Also, we compare the different perception for collaborative SCM among supplier, buyer, and employees of buyer, and try to understand the context in which the IT investment acceptance occurs. We collected 297 responses(199 from line process and 98 from project process respectively). Results show that the importances, usages, and contributions of IT system are higher in the line process than in the project process.