• Title/Summary/Keyword: 표준공종

Search Result 54, Processing Time 0.026 seconds

Comparative Studies of Standard of Estimated Unit Manpower and Material of Landscape Architecture Construction in Korea and Japan (조경공사 표준품셈의 한·일간 비교 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.29 no.3
    • /
    • pp.154-158
    • /
    • 2011
  • This research was carried out to compare the standard of estimated unit power and material in landscape architecture construction between Korea and Japan. It has also been done to offer a practical and reasonable information to Korea landscape architecture industry. The research results are as follows. First, both Korea and Japan's standard of estimated unit power and material in landscape architecture construction are part of civil construction. Second, Korea's detailed type of construction is centered on plant's type and size while Japan's centered on architectural construction. Third, Korea's standard of estimated unit power and material are composed of workforce construction, mechanical construction and addition of soil. On the other hand, Japan's estimated unit power and material are composed of workforce construction, time of transportation, date of transportation. Fourth, the planting specification of Korea seems to be more in detail than that of Japan, Japan's showing a wider implication. Fifth, when comparing the information regarding standard of estimated unit power and material between Japan and Korea, transportation, independent stalking for plant, soil for landscape architecture is difference between the two countries. On the base of this research results, Korea's standard of estimated unit power and material in planning construction should be more elastic in its implication and independent standard of estimated unit power and material in landscape architecture construction. Also, examination of transportation, independent skating for plant and soil for landscape architecture should be done in order for better improvements.

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

Development of Standard Work Type to Utilize Drone at Expressway Construction Sites (고속도로 건설현장에서 드론 활용을 위한 표준공종 개발)

  • Lee, Suk Bae;Jeong, Min;Auh, Su Chang;Kim, Jong Jeon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.461-468
    • /
    • 2021
  • The role of drones is increasing day by day in smart construction that manages construction sites with 3D data in every life cycles. This is because both the digital surface model (DSM) and the orthoimage obtained for the construction site through the drone are made of point cloud data. This study aims to develop standard work types for drone use in order to systematically utilize drones in expressway construction sites. For the study, two expressway construction sites in Korea were set as test beds, and construction types applicable to drones were derived and verified through a pilot project. As a result of the study, three construction work types were developed for road planning, road design and maintenance, respectively, and in road construction, twenty-one detailed construction types were developed for five construction work types. It is expected that drones can be used more systematically not only at expressway construction sites, but also at other road construction sites by utilizing the "standard work type at expressway construction site for drone use" developed in this study.

A Study on the Standardization of Construction Types for the Management of River Project (하천사업 공사관리를 위한 공종 표준화 방안 연구)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.486-486
    • /
    • 2021
  • 국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.

  • PDF

Identification of Primary Activity and Management Plan for Construction Standard Unit Price (건설공사 표준시장단가 핵심공종 도출 및 중점관리방안)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.589-601
    • /
    • 2020
  • The Construction Standard Unit Price (CSUP) sets the standard for calculating the estimated construction cost. The CSUP is used as basic data for preparing a standard price for public construction. Currently, the CSUP is calculated in consideration of the market and construction field conditions. However, a long-term management plan was established to prepare revised standards. As part of the plan, a field survey was conducted on changes in construction conditions and market prices. However, the plan continued for more than 5 years. Thus, the plan has a problem of difficulty continuously managing primary activities that have high importance and high price volatility. Therefore, to efficiently manage the CSUP, this study identifies the primary activities of the CSUP and presents a management plan. Through importance analysis and unit price volatility analysis, 242 primary activities in 35 activity groups were identified. Also, a management plan is presented based on the importance levels of activities. The primary activities and management plan could enable the timely revision of important activities. The results of this study provide a base for reflecting the appropriateness of construction cost criteria on time.

A Studies of Amendment a Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Work Classification (조경공사 표준품셈 공종 개정에 관한 연구)

  • Yun, Ju-Cheul;Lee, Kwan-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.5
    • /
    • pp.119-126
    • /
    • 2011
  • The standard unit manpower and material in landscape architectural construction was consist of a standard and universal work classification. However, these constructional methods have created a number of problems in utilizing and responding on a variety of recently-developed working methods such as new constructional skills and technologies. This research decided that presenting the amendments of work classification of a standard unit manpower and material in landscape architectural construction was very important, and investigated those work classifications which required these new amendments. First of all, assessment items were selected through the literature reviews and a preliminary survey. Then, these assessment items were surveyed to the total of 60 professional landscape architecture field. The results of this study were as follows; First, the utilization level of the a standard unit manpower and material in landscape architectural construction was highest in the area of work classification of planting unit manpower and material. Second, the work classifications that needed to be added were recognized as leveling the ground construction, landscape structure construction, paving construction, water facilities construction, and outdoor facilities construction. Third, in the field of the a standard unit manpower and material in landscape architectural construction, 66.7% of the respondents replied that some amendments were necessary, and those amendments needed work classifications were identified as work classification of planting unit manpower and material was gigantic plant, topiary tree, temporary planting, exchange dead tree, etc. In the area of digging out was gigantic plant and plastic tree were recognized. The survey respondents also answered that, in keeping and management work classifications some amendments in pruning waste were necessary, and in the fields of rubble masonry work classifications some improvements were required in rubble aperture planting unit manpower and material and sodding and herbaceous sowing was a realistic lawn size unit manpower and material was needed. Based on the results explained above, this study suggests that amendments for a standard unit manpower and material in landscape architectural construction are necessary, especially in the areas of planting size and quality of work classifications unit manpower and material and in the unit manpower and material that affects the quality of lands caping constructions.

Standardization of the Work Classification System in Spatial Data Construction - Laying Stress on the Basic Surveying - (공간데이터 구축의 공종분류체계 표준화 - 기본측량을 중심으로 -)

  • Choi, Byoung-Gil;Cho, Kwang-Hee;Kim, Sung-Soo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.2 s.36
    • /
    • pp.69-75
    • /
    • 2006
  • This study aims to standardize the work classification system in spatial data. It is the base frame to classify the general information systematically in spatial data construction process. Work process of the surveying firm and rules for basic surveying which is being accomplished in the NGII(National Geographic Information Institute) are investigated and analysed. Therefore, types, individual process, and results of surveying work is standardized. If the work classification system from this study is adopted as the national standard and is also advanced by construction methodology, the spatial data will be managed futuristically and systematically.

  • PDF

A Development of Work Breakdown Structure and Link to Standard Estimation System for 3D Printing Building (건축물 3D 프린팅 공종분류체계 도출 및 표준품셈 연계방안 제시)

  • Ju, Ki-Beom;Seo, Myoung-Bae;Park, Hyung-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.702-708
    • /
    • 2018
  • 3D printing technology is attracting increasing attention as a key technology of the fourth industrial revolution that can change the production paradigm of existing industries. The introduction of construction 3D printing technology has been slower than other industries because of the characteristics of the construction field. On the other hand construction automation using 3D printing is required to reduce the production population, as well as improve productivity and safety. In this study, a construction 3D printing work breakdown structure and link method to a standard estimation system were developed as a preliminary preparation for introducing 3D printing to construction. Based on expert consultation on construction and 3D printing, a hypothetical scenario was developed based on existing construction 3D printing technology. According to the scenario, 16 kinds of works required for 3D printing construction work were derived. The existing work breakdown structure and standard estimation system were analyzed, and the 3D printing work was linked. 3D printing works that were the same as the existing breakdown structure were found, and non-existent works were added to the similar breakdown structure. These results are expected to be helpful for future 3D printing construction management and cost estimation. The actual standard estimation system through 3D printing work will need to be calculated.

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.

Development of an Automatic Classification Model for Construction Site Photos with Semantic Analysis based on Korean Construction Specification (표준시방서 기반의 의미론적 분석을 반영한 건설 현장 사진 자동 분류 모델 개발)

  • Park, Min-Geon;Kim, Kyung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.58-67
    • /
    • 2024
  • In the era of the fourth industrial revolution, data plays a vital role in enhancing the productivity of industries. To advance digitalization in the construction industry, which suffers from a lack of available data, this study proposes a model that classifies construction site photos by work types. Unlike traditional image classification models that solely rely on visual data, the model in this study includes semantic analysis of construction work types. This is achieved by extracting the significance of relationships between objects and work types from the standard construction specification. These relationships are then used to enhance the classification process by correlating them with objects detected in photos. This model improves the interpretability and reliability of classification results, offering convenience to field operators in photo categorization tasks. Additionally, the model's practical utility has been validated through integration into a classification program. As a result, this study is expected to contribute to the digitalization of the construction industry.