• Title/Summary/Keyword: 표준공법

Search Result 175, Processing Time 0.021 seconds

Particle Velocity Equation for Korean Surface Blasting Type (노천발파 표준공법의 진동예상식)

  • 양형식;김원범;최미진;장선종
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.27-33
    • /
    • 2004
  • Particle Velocity Equations were suggested in this paper for Korean surface blasting types, which were developed by Korean Society for Explosive Engineers (KSEE). Standard charges per delay for types and distances also were determined. USBM equation which was adopted by MOCT (Korean Ministry of Construction and Transportation) shows many problems for Korean situations.

Practical Experimental Design Strategy and Analysis for the Comparison of Two Treatments (두 개의 처리 비교를 위한 실용적인 실험 계획 전략과 분석)

  • Lim, Yong-Bin
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.156-160
    • /
    • 2005
  • We consider practical experimental design strategies and analysis to find out whether a modified method give better results than the standard method. The most practical design strategy is for experimenter to make r successive runs under the current standard method and then, change the standard method to a modified method to make another r successive runs under a modified method. To test a statistically significant difference between the population mean of the standard method and a modified method, additional recent data for sufficient number of consecutive responses under the standard method is needed to construct external reference distribution(Box, et al., 1968). Upon those informations unavailable, the practical design strategy is to run the experiment by split plot designs. In this paper, two types of split plot designs are proposed and how to determine efficiently the number of repetition within a given method and replication of those two methods are discussed based on results of the level of significance ${\alpha}$= 0.05 and the power being at least 0.9 at the detectable difference of ${\mu}_2-{\mu}_1=1.5{\times}{\sigma}$.

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation (유닛 모듈러 공법의 효율성 확보를 위한 공장제작, 운반, 현장설치의 최적 공정 제안)

  • Lee, Kwang-Bok;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.14-21
    • /
    • 2011
  • A unit modular system is a construction method which installs on site by manufacturing 50%~90% of the whole process in the factory. This method can minimize the process in the site and maximize the operation, which will reduce the duration and improve the overall quality. The recent paradigm of construction is to be sustainable building. Modular system can be regarded as a sustainable building construction method because it can reduce the amount of construction waste by recycling partial or whole part of overdue building be torn down. A unit modular system is the answer to cope with the increasing market of small size housings. A unit modular system is the most appropriate option at this point. This research proposes the standard operation and construction process of modular system, which enable to optimal system. A case study of reconstructing small-size housing was introduced to support this proposal. Finished unit modular is the reasonable way. However, 80% of complication rate of the modular is the most rational when a defect occurrence during delivery is considered.

급팽창 금속혼합물(REMM)과 그 반응촉발장치를 이용한 파암공법의 설계 및 시공방법에 관한 연구

  • Kim Il-Jung;Kim Young-Geun
    • Proceedings of the KSEE Conference
    • /
    • 2004.08a
    • /
    • pp.127-149
    • /
    • 2004
  • 건설교통부 표준발파패턴 중 암파쇄굴착공법(pattern-1)에 해당하는 구간에서 적용할 수 있는 공법중의 하나로서 새로운 물질과 반응촉발장치를 이용하는 파암공법이다. 본 공법에 대한 이해를 돕기 위해 새로운 물질의 특성시험, 파암진동과 발파진동과의 비교 고찰하고, 각종 화약류와의 폭발소음을 비교분석 하였으며, 본 공법을 파암현장에 적용함에 있어 암질에 따른 설계기법 및 시공방법 등에 대해 연구하였다.

  • PDF

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

A Study on the MDS Blasting Method Applicability by Test Field Construction (시험시공을 통한 MDS 발파공법의 현장 적용성에 관한 연구)

  • Bong-Hyun Lee;Sung-Oong Choi
    • Explosives and Blasting
    • /
    • v.42 no.1
    • /
    • pp.23-33
    • /
    • 2024
  • Recently, various techniques and patented methods on blasting operation are being newly developed. In this study, test construction of the MDS blasting method was performed, and the fragmentation size and the occurrence rate of rocks exceeding 300mm were measured and analyzed in comparing to normal blasting method. Test construction was performed three times each for normal and the MDS at the same bench for each round, and fragmentation size(P80) and occurrence rate of rocks exceeding 300mm(S30) were measured using digital image processing. A sieve bucket was also manufactured on-site to sort oversized rock particles from muck piles, and their weights and equivalents were measured to calculate actual values. As a result, the fragmentation size decreased of 21.0% with the MDS compared to normal, and 100-S30 decreased of 10.1%, with actual values decreasing of 7.6%. Although there were variations in blasting effects for each round due to differences in rock quality at site, overall, the MDS proved to be more effective compared to normal blasting method under equivalent conditions.