• Title/Summary/Keyword: 폭포상위

Search Result 2, Processing Time 0.018 seconds

Analysis of Physical Factors and Obesity Condition in Cascade Stomach Group (폭포상위를 가진 검진자의 신체적 요인 및 비만상태 분석)

  • Park, Myung-Je;Ji, Tae-Jeong;Im, In-Chul
    • Journal of radiological science and technology
    • /
    • v.30 no.4
    • /
    • pp.343-347
    • /
    • 2007
  • Cascade Stomach is commonly found in obese patients. This study examined the physical factors, such as gender, age, height, weight and level of obesity, associated with a cascade stomach. Over a 12 month period between 2007 a series upper gastrointestinal examinations were carried out on 3,320 people, which included 564 patients with a Cascade Stomach. The results are as follows : 1. A cascade stomach was observed in 564(16.9%) out of 3,320 subjects. 2. A body mass index(BMI) > 120% was observed in 226 of the 564 cascade stomach patients. 3. Among those with a BMI > 120, 63.7% were female, 45.6% were aged between 50-59 years, 49.1% were between 151-160 cm in height and 31.0% were above 76 kg in weight. 4. The symptoms observed in the cascade stomach and obesity groups were subclinical(62.6% and 57.5%, respectively), dyspepsia(16.8% and 17.3%, respectively) and gastric soreness(10.8% and 15.0%, respectively). The incidence of a cascade stomach is higher in those with obesity. In addition, there is a higher incidence in females, those aged between 50 and 59, those between 151 and 160 cm in height and those weighing more than 76 kg. The main symptoms observed were subclinical, followed in order by dyspepsia and gastric soreness. This study showed a strong association between a cascade stomach and obesity. However, more studies will be needed to confirm this.

  • PDF

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF