• Title/Summary/Keyword: 판넬 블록

Search Result 6, Processing Time 0.026 seconds

Development of simulation-based ship production execution system(SPEXS) for a panel block assembly shop (판넬블록 생산관리를 위한 시뮬레이션 기반 조선생산실행시스템 개발)

  • Lee, Kwang-Kook;Kim, Young-Hun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.11
    • /
    • pp.2313-2320
    • /
    • 2011
  • The management of a panel block shop in a shipyard is a complex process that entails the largest amount of work and in which many decisions are involved. Shipbuilders have considered the process as a bottleneck since every panel for every ship and offshore hull structure must be processed through the shop. In order to maximize process productivity, simulation-based ship production execution system(SPEXS) is proposed for panel block operations utilising discrete-event simulation and simulated annealing. An application of panel block assembly shop, called SPEX-Panel supports production planners by general dispatching rules and metaheuristics to make better scheduling decisions on the shop floor. In addition, the system will help increase productivity in the yard with continuous improvement.

The Simulation System for Scheduling Validation of the Panel Block Shop (판넬 블록공정 모델에 대한 일정검증 시뮬레이션 시스템)

  • Lee, Phi-Lippe;Oh, Dae-Kyun;Lee, Kwang-Kook;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.6
    • /
    • pp.641-649
    • /
    • 2009
  • There were many simulation models that made for validation of industrial environment and estimate of efficiency to be constructed. And there will be more simulation models made for same reason, too. Already, there have been a lot of simulation models in industry field and scholar labs. To reuse these simulation models, it is necessary to find common properties and make the high abstract simulation model. Based on this idea, this study shows to define the high abstract simulation model to be able to specialize in need and to make the software framework for connecting the specific simulation model to the abstract model. And it is held up as the example that applying the simulation framework to the Ship Panel Block shop simulation model.

Study on Simulation Model Generation of a Shipyard Panel Block Shop using a Neutral Data Format for Production Information (생산 정보의 중립 데이터 포맷을 이용한 조선소 판넬 공장의 시뮬레이션 모델 생성에 관한 연구)

  • Lee, Dong Kun;Back, Myung Gi;Lee, Kwangkook;Park, Jun Soo;Shin, Jong Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.5
    • /
    • pp.314-323
    • /
    • 2013
  • Production simulation technology is beneficial to solve the complicated and fluctuated problems in a shipyard. It takes too much time and effort to build simulation models in the field, though. This research proposes a feasible method to reduce the difficulties related to simulation modeling for the factory or shop capacity analysis. In addition, a proposed neutral data format for production information is efficient to manage information acquisition for simulation modeling automation. A panel block shop model is contributed to comparison between the conventional technique and the automated one. The automation technique is highly recommended to run a rapid simulation in the shipyard problem.

Analysis for Behavior of Green Geosynthetic Reinforced Soil Walls by Laboratory Model Tests (실내모형실험에 의한 녹화보강토벽의 거동분석)

  • Cho, Yong-Sung;Kim, You-Seong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.4 no.1
    • /
    • pp.11-17
    • /
    • 2003
  • The existing geotextile reinforced soil wall methods have a demerit in terms of esthetic view because concrete panel or block are used as wall facing of the methods. If grass planting walls could be used in reinforced soil slope or wall methods, efficiency of the methods would be increased with maximization of advantage of the methods. In this study, some possible methods in which grass planting wall is used as wall facing are devised. A series of laboratory model tests were performed to investigate the behavior of newly devised methods in order to compare with the results of each others. As a major result, it was found that this kinds of grass wall facing methods could be accepted as a new construction method even in the sense of stability.

  • PDF

Surveying for Pig House Facilities of Pig Farms by Holding Scale (양돈농가의 사육규모별 축사시설 분석)

  • Seo, K.W.;Min, B.R.;Choi, H.C.;Lee, D.W.
    • Journal of Animal Environmental Science
    • /
    • v.15 no.3
    • /
    • pp.231-240
    • /
    • 2009
  • In this research pig house facilities what are 3,029 houses hold over 1000 heads were surveyed by scale and province. Full-time farms hold over 1000 heads breed total 7,229,892 heads. And farms breed 2,386.9 heads averagely. Pig houses were constructed august 1995 averagely. Each of houses have $3,017.2\;m^2$ scale. The construction type of pig house was winch-curtain type 77.2% which was most popular, confined type 51.3%, litter type 7.4% and loft type 4.6%. The winch-curtain type was popular than windowless type in pig farms which have 1,000-1,999 heads. But pig house construction type which have more than over 10,000 heads was windowless type more than winch-curtain type. Manure removing type was slurry 72.3% and scraper 38.5% in farms which have 1,000-1,999 heads. Manure removing type was slurry 83.3% in farms which have over 10,000 heads. Proportion of roof type of pig house was slate 51.2%, panel 46.1%. But in middle or small farms, slate type was only 25.0%. Proportion of wall type of pig house was 41.9%, block 21.9%, concrete 7.6%, winch-curtain 6.3%, and bnck 5.9%. Ventilation type of pig house was natural winch 46.1%, mechanical windowless 69.8% and mixed type 53.1%. So, mechanical windowless type was popular than natural winch type. Especially the farm scale is bigger the mechanical widowless type was more. Utilization period of pig house was 8.1 years about automatic feeder, 8.3 years about waterer, 8.2 years about electric facilities and 9.0 years about floor material. Thus, almost of facilities were used at least 8 years.

  • PDF

Field Survey on the Structure and Manure Treatment of Two-Storey and Sawdust Pig Houses in Korea (국내 2층 돈사와 톱밥돈사의 구조 및 분뇨처리 실태조사)

  • Jeong J. W.;Yoo Y. H.;Song J. I.;Kim T. I.;Jeon B. S.;Yang C. B.
    • Journal of Animal Environmental Science
    • /
    • v.11 no.3
    • /
    • pp.169-176
    • /
    • 2005
  • The farm house structure, ventilation system and manure treatment of two-storey buildings and sawdust pig houses were surveyed and analyzed. Based on the data for ten selected farms in five provinces during eight months, the goal is to eventually establish a standard two-storey pig house. Manure treatments were composting, slurry and activated sludge in two-storey pig houses, while fermentation method was done in sawdust pig house. The depth of sawdust as a litter material were 10 to 60cm, with a duration of 1/2, 1, 3 and 6 months, respectively. The ventilation systems were the mechanical type in two-storey pig houses and natural system in the sawdust pig house. Side wall in the two-storey pig house was enclosed with insulation materials such as block, colored metal sheet and sandwich panels. The minimum ceiling height in the first floor of the two-storey pig house was 2.0m and the maximum was 3.0m. On the second floor, ceiling height ranged from 2.0 to 2.7m. The construction cost in the two-storey systems were $700\~140$, and sidewall curtain systems were $30\~40$ thousand Won/pyung.

  • PDF