A Stability Analysis for Vehicle Impact in U-Channel Segmental Concrete Bridges (U-채널 세그멘탈 콘크리트 교량의 차량충돌에 대한 안전성 분석)

  • Choi, Dong-Ho;Na, Ho-Sung
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.6
    • /
    • pp.17-25
    • /
    • 2010
  • This paper studied on stability of the U-channel segmental concrete bridge under vehicle-impact loads. The U-channel bridge has advantages in that it reduces an additional dead load and the edge beams role as a barrier. But it has a dangerous factor which collapses the bridge structure when the edge beams are ruptured. Therefore, it is necessary to verify behaviors of the bridge system under vehicle-impact loads. Static and dynamic vehicle impact simulations were carried out on the basis of AASHTO LRFD design specifications. In case of the static analysis, equivalent static loads specified in the AASHTO codes are loaded on the edge beams and in case of the dynamic analysis, FEM vehicle models are modeled by applying the dynamic test specifications of AASHTO codes. As a result, it is shown that U-channel bridge system has sufficient safety against static and dynamic impact loads specified in the AASHTO LRFD design specifications.

Analysis on Failure Causes and Stability of Reinforced Earth Wall Based on a Field Case (현장사례를 이용한 보강토옹벽의 파괴원인 및 안정성 분석)

  • Hong, Kikwon;Han, Jung-Geun;Lee, Jong-Young;Park, Jai-Seok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.12 no.1
    • /
    • pp.109-114
    • /
    • 2013
  • This paper describes the global stability of the reinforced earth wall, which was collapsed by heavy rainfall. The seepage analysis was conducted to confirm the change effect of groundwater level on slope with reinforced earth wall. The seepage analysis result confirmed that the change of groundwater level is greatly influenced by rainfall. According to the change of groundwater level, the global stability analysis with reinforced earth wall was conducted based on the results of seepage analysis. The safety factor of the slope was 0.476 when the wall is collapsed firstly. The collapse cause analyzed that soil strength was weaken because the ground was saturated by continuous rainfall. Therefore, the global stability, which is considered heavy rainfall, should be conducted at design and construction of reinforced earth wall.

A Study on the Bahavior and Failure Mechanism of Soil Nailing Walls using Centrifuge Model Tests (원심모형실험을 이용한 소일네일링 벽체의 거동 및 파괴메카니즘에 관한 연구)

  • Kim, Young-Gil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.12
    • /
    • pp.5963-5973
    • /
    • 2011
  • Current design and analyzing methods about soil nailing structures, developed on the basis of results obtained from experiments in laboratory or in field and numerical analyses, have applied different interaction mechanisms between the reinforced nails and the surrounding ground, and different safety factors against failure have been obtained. They might be proper approaches if the assumptions about rigidity of nails and ground conditions are met with actual conditions occurred in field. Otherwise, they would result in designing on analyzing in inappropriate ways so that it is needed to evaluate the validity of them. Therefore, in this research using the Centrifugal Model Testing, numerical parameters experiments about soil nailing structures' behavior and failure mechanism were performed. In the numerical parameters experiments, transmuted nail's length, setting angle, nail's front panel, stiffness variously, and increased the level of gravity until wall model was destroyed. Based on experimental results, we compared the effect, failure mechanism caused from parameters changes. By reviewing and comparing centrifugal model test results and methods currently in use, verified validity of existing methods.

A study on failure probability characteristic based on the reliability analysis according to the variation of boundary conditions (신뢰성 기반 쉴드터널의 경계조건 변화에 따른 파괴확률 특성에 관한 연구)

  • Gyu-Phil Lee;Young-Bin Park
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.447-458
    • /
    • 2023
  • In this study, a comparison model considering the stochastic characteristics of the load and member resistance of the shield tunnel segment lining as well as the variability of the boundary condition was selected and reliability analysis was performed, and the adequacy of the limit state design was analyzed by calculating the probability of failure and reviewing the structural safety. For the analysis considering the probability characteristics of these ground constants, the ground spring coefficient was considered as the mean value by calculating the quantitative value by applying the Muirwood formula, and the coefficient of variation was selected based on the existing research data to review the models according to the change of ground boundary conditions. Through the structural analysis of these models and the reliability analysis using MCS technique, the failure probability and reliability index were calculated to examine the changes in the failure probability due to changes in ground boundary conditions.

An Applicative Estimation of Safety Factors about Driven Pile Using the Results of Static Loading Test on the Ultimate State (극한상태의 정재하시험결과를 이용한 타입말뚝의 안전율 적용성 평가)

  • Ki, Wan-Seo;Park, Noh-Hwan;Kim, Sun-Hak
    • The Journal of Engineering Geology
    • /
    • v.19 no.4
    • /
    • pp.441-457
    • /
    • 2009
  • This study estimated ultimate load by the determination methods based on ultimate load, yield load and settlement using experimental data from static load tests that applied load to driven piles used in sandy grounds at home and overseas until failure appeared markedly. Estimated ultimate load was normalized with actually measured failure load, and was compared among the determination methods according to the characteristics of pile. In addition, I have identified to the determination methods suitable for estimating ultimate load, and reevaluated the safety factor when determining allowable load. From the results of this study were drawn conclusions as follows. Among ultimate loads estimated by the ultimate-load-based determination methods, the value interpreted by Chin's method tended to overestimate actual measurements, and B. Hansen 80% standard and the stability plot method were considered most reliable as their results were closest to actual measurements. According to the results of this study, in calculating the allowable load, if the safety factor to be applied to failing load obtained by the method of determining extreme load is converted to the safety factor applied to the Standards for Structure Foundation Design, a value larger than 3.0 should be applied except the B. Hansen 90% method, and a value larger than 2.0 should be applied in the methods of determining yield load. In addition, if the safety factor to be applied to load obtained by the settlement standard is converted based on safety factor 3.0 for extreme load, a value smaller than 3.0 should be applied to the total settlement standard and the net settlement standard.

Calibration of Load and Resistance Factors in KCI Code Based on Domestic Data (국내 통계자료를 이용한 설계기준의 하중저항계수 검증)

  • Kim, Jee-Sang;Kim, Jong-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.4
    • /
    • pp.495-501
    • /
    • 2011
  • The load combinations in current KCI Design Code are determined with reference to those in ACI 318-05, which adopts the LRFD (load and resistance factor design) format. The load and resistance factors in LRFD format should be determined to meet the required levels of reliability index or probability of failure for various predetermined failure modes, which are also based on the statistical data reflecting locality and contemporary situation. However, the current KCI Design Code has been written utilizing foreign data, because of insufficiency in accrued data in Korea. This study considered the current safety levels of KCI Code based on published domestic data to evaluate appropriateness of the current KCI regulations. Based on the calibrated reliability index of the existing Code, the new resistance factors are suggested. The results presented in this paper can be considered as a basic research for establishment of unique design format for future Korean Codes.

Ship Collision Risk of Suspension Bridge and Design Vessel Load (현수교의 선박충돌 위험 및 설계박하중)

  • Lee, Seong Lo;Bae, Yong Gwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.11-19
    • /
    • 2006
  • In this study ship collision risk analysis is performed to determine the design vessel for collision impact analysis of suspension bridge. Method II in AASHTO LRFD bridge design specifications which is a more complicated probability based analysis procedure is used to select the design vessel for collision impact. From the assessment of ship collision risk for each bridge pier exposed to ship collision, the design impact lateral strength of bridge pier is determined. The analysis procedure is an iterative process in which a trial impact resistance is selected for a bridge component and a computed annual frequency of collapse(AF) is compared to the acceptance criterion, and revisions to the analysis variables are made as necessary to achieve compliance. The acceptance criterion is allocated to each pier using allocation weights based on the previous predictions. This AF allocation method is compared to the pylon concentration allocation method to obtain safety and economy in results. This method seems to be more reasonable than the pylon concentration allocation method because AF allocation by weights takes the design parameter characteristics quantitatively into consideration although the pylon concentration allocation method brings more economical results when the overestimated design collision strength of piers compared to the strength of pylon is moderately modified. The design vessel for each pier corresponding with the design impact lateral strength obtained from the ship collision risk assessment is then selected. The design impact lateral strength can vary greatly among the components of the same bridge, depending upon the waterway geometry, available water depth, bridge geometry, and vessel traffic characteristics. Therefore more researches on the allocation model of AF and the selection of design vessel are required.

Determination of Critical Slope Height for Large Open-pit Coal Mine and Analysis of Displacement for Slope failure Prediction (대규모 노천 석탄광산의 한계사면높이 결정과 사면파괴 예측을 위한 계측자료 해석)

  • Jung, Yong-Bok;SunWoo, Choon;Lee, Jong-Beom
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.447-456
    • /
    • 2008
  • Open-pit mine slope design must be carried out from the economical efficiency and stability point of view. The overall slope angle is the primary design variable because of limited support or reinforce options available. In this study, the slope angle and critical slope height of large coal mine located in Pasir, Kalimantan, Indonesia were determined from safety point of view. Failure time prediction based on the monitored displacement using inverse velocity was also conducted to make up fir the uncertainty of the slope design. From the study, critical slope height was calculated as $353{\sim}438m$ under safety factor guideline (SF>1.5) and $30^{\circ}$ overall slope angle but loom is recommended as a critical slope height considering the results of sensitivity analysis of strength parameters. The results of inverse velocity analysis also showed good agreement with field slope cases. Therefore, failure of unstable slope can be roughly detected before real slope failure.

Profile Design of Small Alluvial Rivers Considering the Safety of Bank (제방의 안전을 고려한 소규모 충적하천 횡단면의 살계기법)

  • Eom, Myeong-Jin;Jo, Won-Cheol
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.3
    • /
    • pp.241-250
    • /
    • 2002
  • In this study, the method of Cheema et al., which is used to decide stable width and depth of the small alluvial rivers, is improved to consider the stability of mass failure and shear failure of the bank effectively. This improved method is applied to the actual rivers, and this result is compared with the result of the method of Cheema et at.. While the method of Cheema et al. could be applied to the alluvial rivers with channel width below 50m, this improved method shows good results in estimating stable width and depth up to 200m. Therefore, this improved method can be suggested as an effective technique in the profile design of small alluvial rivers.

An Analytical Study on the Relationship between Factor of Safety and Horizontal Displacement of Soil Nailed Walls (쏘일네일 보강벽체의 수평변위와 안전율과의 관계 분석연구)

  • Kim, Hongtaek;Lee, In
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.2
    • /
    • pp.45-53
    • /
    • 2011
  • Soil nailing method was often designed by the slope stability analysis based on limit equilibrium. However, in the case of shorten length of nails, although the calculated factor of safety is within the design factor of safety, the horizontal displacement of soil nailed walls occurred above the allowable limit. In this study, relationship between the load and factor of safety, and relationship between the load and displacement ratio based on the test results were analysed. From the analysed results, the relationship between factor of safety and displacement ratio was estimated. For the mobilized horizontal displacement of the walls within the serviceability limit corresponding to the displacement of less than 0.3% displacement ratio, the calculated factor of safety by limit equilibrium analysis had to satisfy above 1.35. Also, although the minimum factor of safety is estimated above 1.35, the maximum horizontal displacement is often mobilized above 0.3% of excavation height. Therefore, it is necessary to perform the numerical analysis of soil nailed walls in the case of low shear strength or high excavation.