• Title/Summary/Keyword: 특별피난계단

Search Result 18, Processing Time 0.024 seconds

Study on Measurement Method of Air Egress Velocity in Vestibule of Smoke Control System (특별피난계단 부속실 제연설비의 방연풍속 측정 방법에 관한 연구)

  • Lee, Su-Kyung;Hong, Dae-Hwa
    • Fire Science and Engineering
    • /
    • v.25 no.3
    • /
    • pp.85-90
    • /
    • 2011
  • This study of the vestibule of pressurizing smoke control system installed in domestic high-rise buildings for evacuation in case of fire, when the door is open to forming characteristics of the air flow was analyzed using fire dynamics simulator and analyzed of variance. Vestibule which is compartment of the design condition, air flow in the exhaust damper was formed severe turbulence confirming preceding research. The door position is in the range of formed vortex, unsteady flow of air occurs at the point that the door could be confirmed. According to the NFSC 501A, door to symmetrically separate the average of 10 points or more as measured from the average of wind speed to do is based. Under these conditions, it is difficult to measure the characteristics of the upper air flow of upper points. so measuring points are subdivided by more than 64 points method presented in TAB because severe deviation of wind speed.

Design for Pressurizing System about Vestibule by Stack Effect & Engineering Analysis - Focused on Case Study - (굴뚝효과와 공학적분석에 의한 부속실 가압시스템 설계 - 사례를 중심으로 -)

  • Kim, Yong-Kwang
    • Fire Science and Engineering
    • /
    • v.23 no.4
    • /
    • pp.145-153
    • /
    • 2009
  • We are generally applicate smoke control only vestibule about special escape staircase, it is one of some smoke control model of NFSC 501A. But there are some point at issue in this system. The smoke control system on supervision field of writer is smoke control only vestibule same as the other resemble field. Writer studied in the concrete to find a solution at this issue, and derived a conclusion the most reasonable system on the field is "same time smoke control for staircase and vestibule" by the engineering analysis considering stack effect.

Smoke Control Performance of a Serial Structure Using "CONTAM" (CONTAM을 이용한 직렬형태 구조의 제연성능 구현에 관한 연구)

  • Kim, Mi-Seon;Seo, Dong-Gil;Gu, Seon-Hwan;Yoo, Young-Min;Song, Young-Joo
    • Fire Science and Engineering
    • /
    • v.33 no.6
    • /
    • pp.53-62
    • /
    • 2019
  • A recent trend shows that more buildings are being constructed as mixed-use (residential and commercial) properties for efficient land use. This has led to an increased frequency in the occurrence of fires and the associated potential risks. In particular, in case of high-rise apartments, at least one of the elevators in each building is installed for evacuation purposes separately from the emergency elevator; therefore, for a combined ancillary room and emergency elevator platform situation, the structure is inevitably in series with the evacuation elevator platform. Thus, a proposal for a new type of ventilation zone based on existing national fire safety codes is required to achieve smoke control performance. To this end, the air egress velocity and differential pressure of each ventilation zone are checked using the "CONTAM" software; further, an alternative is proposed to secure smoke control performance for series structures.

The Experimental Study on the Leakage of Automatic Pressure Differential · Overpressure Control Dampers (자동차압 · 과압조절형댐퍼의 누설량 실험 연구)

  • Shin, Pyung-Shik;Kim, Hak-Joong
    • Fire Science and Engineering
    • /
    • v.29 no.6
    • /
    • pp.71-75
    • /
    • 2015
  • Recently, Since buildings are bigger and higher, the damage of human life can be increased by fire flame and smoke in fire. Smoke control system is necessary to decrease this damage. Therefore, Air supply pressurization smoke control system is applied to vestibule of escape stairway. NFSC requires pressure differential of 40 Pa~60 Pa, but pressure differential is over 60 Pa in the field. It is known that the cause of this over pressure differential is much leakage of damper. Over pressure differential can bad effect to escaper by pressurizing the door. Analyze the real leakage of damper by testing for identifying this problems. The result of testing, leakage is $0.090m^3/s{\sim}0.154m^3/s$. It is necessary to limit the leakage of dampers for safe of escapers.

The Experimental Study on the Leakage of Automatic Pressure Differential·Overpressure Control Dampers by Increasing the Number of Damper Operation (자동차압·과압조절형댐퍼의 개폐동작횟수 증가에 따른 누설량 실험 연구)

  • Shin, Pyung-Shik;Kim, Hak-Joong
    • Fire Science and Engineering
    • /
    • v.30 no.2
    • /
    • pp.56-61
    • /
    • 2016
  • Recently, Since buildings are bigger and higher, the damage of human life can be increased by fire flame and smoke in fire. Smoke control system is necessary to decrease this damage. Therefore, Air supply pressurization smoke control system is applied to vestibule of escape stairway. NFSC requires pressure differential of above 40 Pa, but pressure differential is excessively overpressure in the field. It is known that the cause of this over pressure differential is much leakage of damper. Over pressure differential can bad effect to escaper by pressurizing the door. Analyze the real leakage of damper by increasing the number of dampers operation for identifying this problems. The result of testing, the leakage has difference between new dampers and increased the number of operation dampers. As the static preassure increase, the leakage difference increase. Comparison with preceding study, this result has similar linear tendency.

A Brief Study on Smoke Suppression Effects by Sprinkler Spray System (스프링클러설비에 의한 연기제어효과 고찰)

  • Cha, Jong-Ho;Yoon, Myung-O;Choi, Chun-Bae;Lee, Sun-Kyung
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.560-565
    • /
    • 2006
  • Sprinkler system is the most effective fire suppression with high confidence among active fire extinguishing systems. According to the installation of the related system on buildings, more separation area of fire protection can be considered to the fire protection design, and also lower differential pressure (12.5 Pascal) is permitted on lobby of fire escape stairs and emergency elevator (25 Pascal shall be considered for none sprinkler system) with economic factor. More details will be handled on the related studies.

  • PDF

A study on measures for the mitigation of fire damage in Korea super high-rise building through the improvement of domestic·foreign standards (국·내외 기준개선을 통한 국내 초고층 건축물의 화재피해경감 대책에 관한 연구)

  • Ko, Jaesun
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.233-248
    • /
    • 2017
  • Uniform laws and regulations and reasonable design is necessary for the prevention of possible fire in super high-rise building. To this end, this study focused on super high-rise and massive building-related architectural review performance-based design (PBD) evaluation disaster impact assessment (DIA), and provided fire engineering measures for improving fire prevention on the basis of performance-based design by analyzing the buildings subject to these systems and problems in terms of contents. Above all, in the aspect of law and standard improvement, first, with regard to dual parts of two statutes though significant portion of them has the same contents in performance-based design (PBD) evaluation and disaster impact assessment (DIA), it is necessary to operate the systems after making them conform with each other and consolidating or abolishing them. Second, if it is impossible to consolidate or abolish performance-based design (PBD) evaluation and disaster impact assessment (DIA), the areas of contents of performance-based design (PBD) evaluation and disaster impact assessment (DIA) should be precisely classified and established. Next, engineering improvement measures against fire hazard in super high-rise building are as follows. First, it is necessary to revise the provisions of straight-run stairs in special escape stairs. And in case of installing a mechanical smoke exhaust system instead of smoke vent, sandwich pressurization used in the United Stated should be permitted. Second, with regard to smoke control system for special escape stairs, it was shown that there was necessity for revising the standards in order to enable air to be supplied according to section in case of fire, carrying out performance-based design, and the like from the early design stages to the completion stages. In the future, it is expected that an epoch-making contribution will be made to a decrease in casualties and property damage due to fire in case of super high-rise building where the results can be reflected after carrying out a study on maintenance and carrying out an additional study on other considerations of super high-rise building together with reflecting the improvement measures provided in the above-mentioned study.

A Study on Smoke Extract Vents in a Subway with Screen door by Evacuation Performance Evaluation through RSET vs. ASET based on Computer Simulations (스크린도어가 설치된 지하철 승강장의 대피안전성 평가를 통한 제연환기구의 방재성능 개선방안 연구)

  • Park, Hyung-Joo;Lee, Young-Jae;Shin, Dong-Cheol;Baek, Dong-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.511-519
    • /
    • 2007
  • This study provides comprehensive design improvements covering technical issues concerning life safety matter In case of fire train stoppage in the middle of a tunnel. Recently Government announced that most of subway platforms will have screen doors in 3 years. Therefore, many fire safety engineers considered that they may contribute on life safety on train stoppage in tunnel. Especially The screen door can protect platform from smoke along tunnel ceiling when fire train stopped in tunnel. The study showed that platform ventilation ducts and the a tunnel ventilation chimney in the middle of tunnel in exiting subway tunnel could not guarantee life safety ability in terms of RSET vs. ASET comparison. Furthermore during evacuation process many peoples may be threatened from the smoke spread from the origin of fire. Although only additional vertical route can be installed in tunnels In order to decrease RSET, it will costs high or no spaces remains in outside on the road. The study suggested that increase of ASET can be best solution without additional escape route, therefore alternative design methods suggested on the base of simulation results. Finally the study shows alternative methods can give good result in terms of evacuation performance evaluation. The evacuation performance evaluation helps the decision-maker to determine the preferred alternatives or upgrades to existing tunnel infrastructure and other measure to meet safety objectives. Finally, the study details the effectiveness of measures the can be taken to reduce the risk of incidents in subway tunnels.