• Title/Summary/Keyword: 투찰률

Search Result 4, Processing Time 0.015 seconds

An Understanding of Domestic Construction Clients' Tender Behavior (투찰률을 통한 국내 건설업체들의 입찰행태에 대한 이해)

  • Bae, Juhyeon;Han, SangUk;Kim, Byungi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.74-79
    • /
    • 2018
  • The establishment of an effective bidding system is critical to ensure both the high quality of civil infrastructure and proper earning of contractors. However, the continuous changes of a bidding system in South Korea reveal that problems such as a dumping or high price winning have not been fully resolved yet. This study thus aims at understanding the bidding behavior and strategies of contractors by analyzing a tender ratio in historical data. Multiple regression analysis is conducted to understand the effect of internal and external factors (e.g., estimated cost, combined value of construction performance evaluation) on a tender ratio. The results statistically show that such factors affect the tender ratio an individual bidder determines and have the varying effect on the tender ratio by contractors' firm size.

Analysis of Construction Company's Bidding Practice under the Lowest Bidding System (최저가낙찰제하에서의 건설업체의 투찰 형태 분석)

  • Lee, Hyungwoo;Chang, Chul-Ki;Kim, Yong-Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.975-983
    • /
    • 2006
  • This study analyzed bidding data for construction projects ordered by the Public Procurement Service under the lowest bidding system since 2001 by using statistical technique in terms of construction types, company sizes, bidding prices. This study brings out construction company's bidding practices and problems caused by the current lowest bidding system and suggests the way to mitigate the problems and to improve the lowest bidding system. The analysis shows the problem of winning a bid in abnormally low price under the lowest bidding system, feared at the start, was realized. As bidding practice has polarized with low and high price, the analysis shows that the lowest bid system's market has a high possibility to be distorted by construction companies' bid strategies. To complement the lowest bidding system's problem, the analysis shows that introduction of the bidding system using particulars where bidders estimate construction quantities and unit prices by themselves is needed.

A Study on Method for Damage Calculation Caused by Bid Rigging in Alternative Tenders for Construction Projects -Utilizing the Difference of the Design Score & Bidding Rate as Factor - (건설공사 대안입찰 담합으로 인한 손해액 산정모델 연구 - 설계점수 및 투찰률 차이 인자 활용 -)

  • Min, Byeong-Uk;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.741-749
    • /
    • 2018
  • The purpose of this study is to propose a rational and scientific damage calculation model in relation to damages caused by bid rigging in construction projects. Previous studies and precedents in relation to calculating damages from bid rigging suggest that the main issue was the lack of consideration in standards for deciding successful bids, selection of inadequate standard comparative markets, insufficiency in analyzing the appropriateness of competitive bid price influence factors, and absence of calculation model verification. In order to improve on these issues, a damage calculation method on alternative tenders for construction projects was proposed. For this calculation model, first, a standard market adequate to the successful bid selection standards was determined, second, an appropriate factor was selected by analyzing the correlation between competitive bid price influence factors, and third, a regression analysis was conducted on the selected factor. Lastly, this was demonstrated through verification of appropriateness, significance & normality of the proposed model and application of actual bid rigging cases. Through the proposed calculation model, this study seeks to serve as a base to prevent opportunity damages for parties involved in related court cases by early resolution of disputes and relief from issues of unfair damage burdens on a particular party.

A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.