• Title/Summary/Keyword: 통과열차

Search Result 118, Processing Time 0.022 seconds

Prediction of Cumulative Plastic Displacement in the Concrete Track Roadbed Caused by Cyclic Loading (반복하중에 의한 콘크리트 궤도 노반의 누적 소성 변위 예측)

  • Won, Sang-Soo;Lee, Jin-Wook;Lee, Seong-Hyeok;Jung, Young-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.1
    • /
    • pp.52-58
    • /
    • 2014
  • Plastic deformation of roadbed influences the stability and maintenance of concrete slab track. Long-term plastic deformation in a railway roadbed is generated primarily due to accumulated inelastic strains caused by repeated passing of trains. Prediction of cumulative plastic deformation is important in cost-effective maintenance of railway tracks as well as for the safe operation of trains. In this study, the vertical displacements in railway roadbeds with different thicknesses of reinforced roadbed were computed. Parameters of the power model for cumulative plastic strain were calibrated by using the data from triaxial tests and full-scale loading tests. Results of three-dimensional finite element analyses of standard roadbed sections provide us with design guidelines for the selection of the thickness of reinforced roadbed.

The Study on DBPL Encoder Design for Railway Balise Application (철도 발리스 응용을 위한 DBPL 인코더 설계 연구)

  • Lee, Jeong-jun;Yang, Doh-chul;Kim, Seong-jin;Kim, Bong-seob;Kim, Yu-hyeon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.2
    • /
    • pp.161-170
    • /
    • 2017
  • The balise is a device for the railroad signal control systems, which is installed between both rail. The balise sends fixed or variable data, named telegram, to the train with wireless method. The telegram includes the position information, the movable distance under the signal status, the gradient, the speed, the temporary speed limit, etc. This research is on a design of the DBPL encoder for the balise. Normally the DBPL encoder for the balise is with the ASIC or FPGA technology. In this research, the DBPL encoder is designed with commercial low power operable micro-controller. The firmware(logic level encode) and the SPI Bus function block(physical level output) of the micro-controller are used for the DBPL encode. Under the european standard, the required working speed of the DBPL encoder is 564.48Kbps. The DBPL encoder of this research is tested under the speed of 564.48Kbps, and it worked properly.

A Study on the Equivalent Fatigue Damage of the Steel Railway Bridge (강철도교(鋼鐵道橋)의 등가피로피해(等價疲勞被害)에 관한 연구(硏究))

  • Chang, Dong Il;Lee, Jong Deuk;Chung, Yeong Wha
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.2 no.4
    • /
    • pp.11-21
    • /
    • 1982
  • The dynamic strain-time(${\varepsilon}$-t) curves of the fatal members in three existing steel railway bridges was measured during the selected trains was passing, and was regulated statistically. By the results of these the equivalent fatigue damages of the selected members was calculated in comparison with the allowable stresses, and was examined. From these the base available in evaluating the stability and the lifeproof of the steel railway bridge was obtained. In addition to this, the following several properties which could be used availably in designing the steel railway bridges. It was conformed that the fatigue damages was different each other even in the same members, if the unit weight of the trains was same but the weights and the dispositions of the wheels of the trains was different each other. It was indicated that the fatigue damages was larger in the members which had the defects in components of the materials, the flaws being made during producing and constructing, and the corrosions, etc. It was considered that more a vailable data could be obtained, if the same studies were continued under the spans and the types of the bridges being changed continuously.

  • PDF

Dynamic Characteristics of Railway Plate Girder Bridges with Increase of Diesel Locomotive Speed (철도차량의 증속에 따른 판형교의 진동특성)

  • Cho, Eun Sang;Kim, Hyun Min;Hwang, Won Sup;Oh, Ji Taek
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.6
    • /
    • pp.769-782
    • /
    • 2006
  • As the ambient vibration test (AVT) of railway bridges has a limited range of speed, it has a limitation in examining the dynamic behavior of bridges accordingto speed. Thus, in order to analyze the correlation between the speed of a train passing over a bridge and the bridge's dynamic response, we conducted a speed-increasing experiment using a real diesel locomotive. To analyze the acceleration response characteristics, we attached seven vertical accelerometers at equal intervals throughout the entire section of the bridge except the supports, and one horizontal accelerometer to the middle span. Linear variable differential transformers (LVDT) were installed at the bridge's center in both vertical and horizontal directions to investigate the vertical and horizontal behaviors. The test train was statically loaded at the center and at the end of the bridge. And its speed was increased from 5 km/h to 90 km/h. With data obtained from the experiment, the vibration level was evaluated in each direction by the filtering frequency, and the level of horizontal vibration was examined in comparison with vertical vibration. The displacement and wheel load variation was analyzed by speed.

A Study on Fatigue Crack at Coped Stringers of the Plate Girder Subway-Bridge (플레이트거더 지하철교량 세로보의 피로 균열에 관한 연구)

  • Jo, Jae Byung
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.5 s.72
    • /
    • pp.713-724
    • /
    • 2004
  • A fatigue crack found at the coped stringer of the old dismantled Dangsan Subway Bridge was numerically simulated. A model of a single span of the plate girder bridge with its beam elements was created and analyzed in order to obtain the nominal stress history caused by trains. A detailed FEM analysis of the coped stringer was conducted using a shell element model. A fracture mechanical model was used to estimate crack propagation. The stress intensity factors were calculated using the J-Integral method. The simulation with some reasonable assumptions showed that the calculated crack lengths were comparable to those found on the site.

Load Factor Decrease In The Seoul Metro Circle Line through Analyzing Passenger OD Demand (2호선 혼잡구간 OD수요 분리유도를 통한 혼잡도 개선 방안 (교통카드 빅데이터 분석을 중심으로))

  • Eom, Jin Ki;Song, Ji-Young;Lee, Kwang-Sub
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.457-465
    • /
    • 2014
  • This study proposes a policy for urban railway travel demand management system in order to decrease the load factor of the Seoul metro Circle line, particularly for the segment between Sadang and Samsung stations, through analyzing the transit smart card data. We propose mixed train operations of the existing Circle line and a line that goes toward Samsung station in order to transport passengers that have two distinct groups: those with the destination of Samsung station and those with destinations after Samsung station. The introduction of a mixed train operation that encourages passengers passing through Samsung station to take a Circle line train will decrease the congested load factor by 11.3% during the morning peak hours using the mixed train operation of the Circle and Samsung lines. This policy could be an effective method to decrease the load factor and improve the comfort of rail passengers without extra investment in the railway facilities.

Field Tests and Resonance Behavior Corresponding to the Damping Ratio of a High Speed Railroad Bridge (고속철도 교량의 현장실험 및 감쇠비 개선에 따른 공진 시 동적응답의 분석)

  • Kim, Sungil;Kim, Hyunmin;Park, Donguk
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.305-310
    • /
    • 2013
  • In general, it is difficult to measure dynamic responses of a bridge with stepwise increasing speed of a train during commercial service on a high speed railroad. However, before opening the 2nd stage of the Gyeongbu high speed railroad, there was an opportunity for field tests and measurements of the bridge with stepwise increasing speed(from 170km/ h to 315km/h). The measured responses were compared with the results of a developed bridge/train interaction analysis. Although good agreement was found throughout almost the entire range of speeds, relatively large differences were found in the vicinity of the critical speed at which resonance behavior of the bridge occurs. To investigate the cause of this, reanalyses are performed with re-estimated damping ratios from field tests.

Rail Corrugation Effects on the Dynamic Behavior of Clips of Rail Fastening System in Operation Environment of Urban Railway (도시철도 운영환경에서 파상마모에 의한 레일체결장치 클립의 진동 특성)

  • Kim, Man-Cheol;You, Won-Hee;Sim, Hyoung-Bo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.489-497
    • /
    • 2016
  • The rail fastening system, which provides a structural connection between the rail and the sleepers, is a main track component that plays an important role in retaining the rail gauge within acceptable tolerances, as well as in passing the train load to the roadbed through the sleepers. In this paper, a modal test was first performed to evaluate the dynamic characteristics (e.g., natural frequency) of the clips of the railway fastening system under the condition of rail corrugation in urban railway operation. The corrugation-induced passing frequency was then compared with the natural frequency of the clips to investigate any resonance effect during train passage. Furthermore, a field test under train passage was conducted to measure the accelerations on the rail and the rail fastening clips as well as the strains on the rail fastening clips in the rail corrugation condition. The field measurements indicated that the accelerations on the rail and the rail fastening clips have a close relationship with the rail corrugation, but they had a minimal effect on the strains of the rail fastening clips.

A Study on Interoperability for North-South Korean Railway Direct Connection (남북철도 직결운행을 위한 상호운용성 고찰)

  • Park, Eun-Kyung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.6
    • /
    • pp.1161-1168
    • /
    • 2018
  • On April 27 2018, North-South Korea agreed to establish the practical methods for connecting the railway in the inter-Korean summit talks. This is often reported that the train will be operated directly between Busan and Europe. However, there are many problems for the railway to directly connect between Busan and Europe. Because a train from Busan to Europe should pass through North Korea, China or Russia, and each national railway systems are different. Thus, South Korean railway has to study thoroughly an interoperability before railways directly operates between a nation and another. The standards and technical harmony for direct connection with a different railway network is very important, because a rail transport is a total network system. This paper surveyed a European railway interoperability and studied on the basic direct operation for the North-South Korean railway systems.

The Fatigue Life Evaluation of Aged Continuous Welded Rail on the Urban Railway (도시철도 장기 사용레일의 피로수명 평가)

  • Kong, Sun-Young;Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.821-831
    • /
    • 2013
  • As a result of recent research, it is reported that the periodic replacements criterion of rails is able to extend as grinding rail surface and using the continuous welded rail (CWR). In this study, we carried out fatigue tests on existing laid rails. Based on the test results, an S-N curve expressing the remaining life of laid rails at a fracture probability of 50% was obtained using weighted probit analysis suitable for small-sample fatigue data sets. As rails used for testing had different histories in terms of accumulated tonnage, the test data were corrected to average out the accumulated tonnage. We estimated the remaining service lives for laid rails on the urban railway using equations developed in the past to estimate rail base bending stress and that surface irregularities into consideration. Therefore, estimating the remaining service life of laid rails showed that the rail replacement period could be extended over 200 MGT, although it is necessary to remove longitudinal rail surface irregularities at welds by grinding. Also, the fatigue test results under fatigue limit, Haibach's rule appling half slope of S-N curve under the fatigue limit was considered more reasonable than modified Miner's rule for estimating rail fatigue life.