• Title/Summary/Keyword: 통과열차

Search Result 118, Processing Time 0.023 seconds

Introduction and Preliminary Design of Floating Slab Track for Rapid Transit Railway (고속철도용 플로팅 슬래브 궤도의 도입과 기본설계)

  • Kim, Yong-Jae;Lee, Eun-Ho;Park, Myoung-Gyun;Moon, Je-U;Park, Man-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.141-144
    • /
    • 2008
  • Recently, railway has been pointed to the efficiency of transportation, rapid transit, and comfortable train ride. the construction of railway near the downtown area and station building are increasing for maximization of utilization and convenience. but the heavy of transportation and rapid transit lead to increase noise and vibration. the noise and vibration of railway may cause the civil appeal, decline in the serviceability and insufficiency of environmental standard. Therefore, the solution to avoid environmental matters becomes one of the most important factor in constructing railway. In this study, floating slab system which is one of the solution to avoid noise and vibration in railway has been introduced, and the concept of preliminary design and vibration absorber of floating slab system according to the isolator has been introduced.

  • PDF

Evaluation of Curving Performance and Running Safety of New High-Power Electric Locomotive (신형 고출력 전기기관차의 곡선추종성 및 주행안전성 평가)

  • Ham, Young Sam
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.6
    • /
    • pp.827-832
    • /
    • 2013
  • In this study, curve responsiveness was assessed based on the lateral force and running safety was evaluated based on the wheel unloading ratio and derailment coefficient, which is the ratio of the wheel load and the lateral force. The evaluation of the curving performance and running safety of the new high-power electric locomotive showed that the derailment coefficient appeared higher when the wheel-set was set to the front of the train instead of being placed backward, and the maximum value of the derailment coefficient was recorded as 0.572 on the Gyeongbu line. Furthermore, the lateral force increased in curved sections, and it appeared to be proportional to the curve radius. Meanwhile, a maximum axis lateral force of 77.6 kN was recorded on the Taebaek line, and the wheel unloading ratio was 47.6% on the Yeongdong line. Finally, the running safety at the maximum speed as well as the through-curve performance of the curve radius satisfied the required standards.

Analysis for Optimal Rail Grinding Amount by Rolling Contact Fatigue Test in High Speed Railway (구름접촉피로시험을 통한 고속철도 레일연마량 분석)

  • Sung, Deok-Yong;Chang, Ki-Sung;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.2
    • /
    • pp.141-146
    • /
    • 2012
  • The rail surface defects which are generated on repeated rolling contact fatigue are getting increased according to high speed, high density, and minimum weight. In addition, Increasing noise and vibration are affected by these also impact load generated as well. Because of this phenomenon, more serious and critical damages were occurred. In fact, in order to control them, the rail grinding amount in Korea. This study evaluated how depth of hardening on rail surface is formed and suggested optimal rail grinding amount by RCF(rolling contact fatigue) test with generated contact pressure between KTX wheel and UIC60 rail by applying FEM analysis. Therefore, the amount was generated approximately 0.2mm/20MGT to maintain integrity of rail surface by getting rid of depth of hardening on rail according to rail accumulated passing tonnage.

The Risk Analysis for the Rail Transport of Explosives (폭약류의 철도수송에 따른 리스크 평가)

  • Lee, Jae-Hean;Song, Dong-Woo;Lee, Su-Kyung
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.2
    • /
    • pp.33-39
    • /
    • 2011
  • This study presented quantitative risk analysis in case of transporting explosive materials by railway. Accident types were classified into accidents of in station and in transit. And the study presented an initial value of accident frequency through derailment accident and crushing one according to each type, and drew the results of accident frequency through event tree analysis. Damage impact evaluation used TNT equivalent method and probit analysis method. As the result of risk evaluation, railway transportation of explosive materials passing through areas which are high in population density is appeared to be able to cause a large number of personnel injury when occurring accidents. Specially, the accident of explosive transportation combined with petroleum was forecasted as easily resulting in large explosive accident. Consequently, there is a necessity to reduce consequences by decreasing passage through areas where are high in population density, and take measures for lessening the risks in case of transporting dangerous explosive materials.

A Study of Dynamic Behavior of Track and Train Interaction on Rail Open Gap (레일 개구부에서의 궤도-차량 상호작용에 대한 연구)

  • Kang, Yun Suk;Kang, Young Jong;Yang, Shin Chu;Cho, Sun Kyu;Han, Sang Yun
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.4
    • /
    • pp.345-355
    • /
    • 2007
  • During winter, the CWR (continuous welded rail) may be broken when a temperature drop below the neutral level changes the axial force, causing tensile fracture and creating a rail gap. The passage of a train on a rail with an open gap may lead to very costly derailments. In this paper, the use of a track-and-train-coupled model whose rail has an open gap is proposed for dynamic interaction analysis. Linear track and train systems were coupled in this study by a nonlinear Herzian contact spring, and the complete system matrices of the total track-train system were constructed. Moreover, the interaction phenomenon considering the presence of an open gap in the rail was toughly defined by assigning the irregularity functions between the two sides of the gap. Time history analysis, which has an iteration scheme such as the Newmark-$\beta$ method (based on the Modified Newton-Raphson methods), was conducted to solve the nonlinear equation. .Finally, numerical studies were conducted to assess the effect of the various parameters of the system when applied to various speeds, open-gap sizes, and support stiffnesses of the rail.

Simplified Collision Analysis Method for Submerged Floating Railway Using the Theory of a Beam with an Elastic Foundation (탄성지지 보이론을 이용한 해중철도 간이 충돌해석법)

  • Seo, Sung-Il;Kim, Jin Sung
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.3
    • /
    • pp.202-206
    • /
    • 2013
  • A submerged floating railway is an innovative tunnel infrastructure passing through the deep sea independent of wave and wind so that high speed trains can run on it. It doesn't depend on water depth and is cost effective due to modular construction on land. The construction period can be reduced drastically. This paper introduces the concept design of a submerged floating railway, and for securing safety, proposes a method to analyze the structural behavior of the body in case of collision with a submarine. The theory of a beam with an elastic foundation was used to calculate the equivalent mass of the body so that the perfect elastic collision could be applied to calculate the collision velocity. The maximum deformation and bending moment was analyzed based on energy conservation. To verify the results, a collision analysis using a finite element analysis code was made. Comparing the results confirmed that this simplified collision analysis method gives enough accurate deformation and bending moment to be used for actual estimation in the initial design stage.

Evaluation of the Roadbed Behavior During Tilting-train Operation in Curved Track Using Numerical Analysis (틸팅차량의 곡선부 운행시 수치해석을 이용한 노반거동 평가)

  • Jeon, Sang-Soo;Eum, Gi-Young;Kim, Jae-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.6
    • /
    • pp.115-126
    • /
    • 2007
  • The tilting-train is very attractive to the railroad users in the world because it runs with high speed in curved track using pre-existing infrastructure. The tilting-train has a unique allowable speed and mechanism expecially in curved track. Therefore, it should be evaluated in terms of the stability of the train operation and roadbed. In this study, when the tilting-train is being operated with the allowable speed, the behavior of the roadbed is evaluated by examining the settlement and bearing capacity of the roadbed. Additionally, the stability of the roadbed is estimated in the condition of soft roadbed influenced by the weather effects and cyclic train loading. The numerical results show that the roadbed settlements satisfy the allowable settlement when Young's moduli of the upper roadbed and in-situ soil are more than $2,300t/m^2\;and\;3,300t/m^2$, respectively, in the continuous welded rail (CWR) and $3,800t/m^2\;and\;4,600t/m^2$, respectively, in the rail joint.

Diurnal Variation of the Dust Concentration in a Railway Tunnel (도시철도 터널 내 부유먼지의 일변화 특징)

  • Woo, Sang Hee;Kim, Jong Bum;Hwang, Moon Se;Tahk, Gil-Hyun;Yoon, Hwa Hyeon;Yook, Se-Jin;Bae, Gwi-Nam
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.280-287
    • /
    • 2016
  • In railway tunnels, dust is generated when trains run due to the contact between the wheels and the rails. The generated dust is suspended due to the train-induced airflow, with some of it deposited due to gravitational sedimentation. In this study, the diurnal variation of the dust concentration was investigated in a railway tunnel. A single lane of a tunnel was selected in which to observe more easily the dust concentration due to the passing of a train. Four particle-measuring instruments were utilized to detect dust ranging from 5nm to $20{\mu}m$. To synchronize the train passing time at the measuring location, a three-dimensional ultrasonic anemometer and a video camera were used. It was found that the dust concentration was significantly increased from $50{\mu}g/m^3$ to $150{\mu}g/m^3$ due to the train. Particularly, the dust concentration was greatly increased to more than $250{\mu}g/m^3$ during the morning rush-hour times.

Evaluation of Applicability of Apparent Track Stiffness Measured by Light-Weight Deflectometer as a Ballasted Track Condition Index (소형동평판재하시험기로 측정한 궤도 겉보기 강성의 자갈궤도 상태평가 지표로서의 적용성 고찰)

  • Choi, Yeong-Tae;Hwang, Sung Ho;Jang, Seung Yup;Park, Bongsik;Shim, Gwang Seop
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.2
    • /
    • pp.37-44
    • /
    • 2018
  • Ballasted track has been widely used due to its flexibility. However, the plastic deformation of ballasted track causes the evolution of track geometrical errors, and hence it requires continuous maintenance; increase in number of trains, weight, and speed expedites maintenance frequency and cost as well. Ballast stiffness is well-known as an indicator of design and maintenance. In this regard, this paper aims to suggest the method to measure ballast track stiffness using light-weight deflectometer (LWD) and thus verify its applicability as a maintenance measure. Preliminary field tests determined simple field testing protocol to measure track stiffness. The apparent ballast stiffness by LWD shows good corelation with TQI (Track Quality Index) and maintenance length. That is, as average of apparent stiffness increase, TQI and tamping length decrease exponentially. Therefore, apparent stiffness can be used as an index for ballast condition assessment.

Evaluation of the Degradation Trend of the Polyurethane Resilient Pad in the Rail Fastening System by Multi-stress Accelerated Degradation Test (복합가속열화시험을 통한 레일체결장치 폴리우레탄 탄성패드의 열화 경향 분석)

  • Sung, Deok-Yong;Park, Kwang-Hwa
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.6
    • /
    • pp.466-472
    • /
    • 2013
  • The use of a concrete track is gradually growing in urban and high-speed railways in many part of the world. The resilient pad, which is essentially when concrete tracks are used, plays the important role of relieving the impact caused by train loads. The simple fatigue test[1] to estimate the variable stiffness of resilient pads is usually performed, but it differs depending on the practical conditions of different railways. In this study, the static stiffness levels of used resilient pads according to passing tonnages levels were measured in laboratory tests. Also, the simple fatigue test and the multi-stress accelerated degradation test for new resilient pads were performed in a laboratory. The static stiffness of the used pad was compared with the results of tests of usage times and cycles. The results of the comparison showed that the variable static stiffness levels of the used pad were similar to results of the multi-stress accelerated degradation test considering the fatigue and heat load. With a T-NT equation related to the degree of the multi-stress accelerated degradation, a model of multi-stress accelerated degradation for a resilient pad was devised. It was found through this effort that the total acceleration factor was approximately 2.62. Finally, this study proposes an equation for a multi-stress accelerated degradation model for polyurethane resilient pads.