A Study on Joint Position at Concrete Pavement with Box Culverts (박스 암거가 통과하는 콘크리트 포장의 줄눈 위치에 관한 연구)

  • Park, Joo-Young;Sohn, Dueck-Su;Lee, Jae-Hoon;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.45-53
    • /
    • 2012
  • Hollows are easily made and bearing capacity is lowered near underground structures of concrete pavement because of poor compaction and long term settlement of the ground. Distresses occur and lifespan is shortened because of larger stress induced by external loadings expected than that in the design. In this paper, the distresses of the concrete pavement slab over box culverts were investigated at the Korea Expressway Corporation(KEC) test road. The transverse cracking of the slabs over the culverts was compared between up and down lines with different soil cover depth. The box culvert without soil cover and concrete pavement were modeled and analyzed by the finite element method(FEM) to verify the transverse cracking at the test road. Wheel loading was applied after self weight of the pavement and temperature gradient of the concrete slab at Yeojoo, Gyeonggi where the test road is located were considered. Positions of maximum tensile stress and corresponding positions of the wheel loading were found for each loading combination. Joint position minimizing the maximum tensile stress was found and optimal slab length over the culverts with diverse size were suggested.

A study on the face pressure control and slurry leakage possibility using shield TBM model test (축소 모형실험을 통한 토피조건별 이수압식 쉴드 TBM의 챔버압 및 이수분출 가능성 평가)

  • Koh, Sungyil;Shin, Hyunkang;La, You-Sung;Jung, Hyuksang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.3
    • /
    • pp.277-291
    • /
    • 2020
  • Shield TBM is a tunnelling method that has a wider range of applications in the poor ground condition compared to conventional tunnels (Drill and Blast). Currently, a 13.3 m large-diameter slurry shield TBM is preparing for construction to pass under the Han River. Shield TBM is divided into slurry and EPB shield TBM, and management items during construction are different depending on each characteristic. In this paper, the equipment type, origin, application case and trouble case were analyzed for slurry shield TBM, which is mainly constructed in soft ground. In addition, 2D and 3D model tests were conducted on the condition of soil depth for the possibility of slurry leakage into front of the equipment, with appropriate chamber pressure. Based on this paper, it proposed to provide basic and reference data for proper excavation surface pressure and chamber pressure during construction of slurry shield TBM under soft ground conditions, and proposed measures to minimize stability and environmental decline due to slurry ejection.

Behavior of wall and nearby tunnel due to deformation of strut of braced wall using laboratory model test (실내모형시험을 통한 흙막이벽체 버팀대 변형에 따른 흙막이벽체 및 인접터널의 거동)

  • Ahn, Sung Joo;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.593-608
    • /
    • 2018
  • If a problem occurs in the strut during the construction of the braced wall, they may cause excessive deformation of the braced wall. Therefore, in this study, the behavior of the braced wall and existing tunnel adjacent to excavation were investigated assuming that the support function of strut is lost during construction process. For this purpose, a series of model test was performed. As a result of the study, the earth pressure in the ground behind wall was rearranged due to the deformation of the braced wall, and the ground displacements caused the deformation of adjacent tunnels. When the struts located on the nearest side wall from the tunnel were removed, the deformation of the braced wall and the tunnel deformation were the largest. The magnitude of transferred earth pressure depended on the location of tunnel. The increase of the cover depth of tunnel from 0.65D to 2.65D caused the increase of the earth pressure by 25.6%. As the distance between braced wall and tunnel was increased from 0.5D to 1.0D, the transferred earth pressure increased by 16% on average. Horizontal displacements of braced wall by the removal of the strut tended to concentrate around the removed struts, and the horizontal displacement increased as the strut removal position is lowered. The tunnel displacement was maximum, when the cover depth of tunnel was 1.15D and the horizontal distance between braced wall and the side of tunnel was 0.5D. The minimal displacement occurred, when the cover depth of tunnel was 2.65D and the horizontal distance between braced wall and the side of tunnel was 1.0D. The difference between the maximum displacement and the minimum displacement was about 2 times, and the displacement was considered to be the largest when it was in the range of 1.15D to 1.65D and the horizontal distance of 0.5D.

A study on the optimal reinforced zone of a small sectional shield TBM tunnel in difficult ground (특수지반 구간의 소단면 쉴드 TBM 터널 굴착 시 최적 보강영역 연구)

  • Kang, Byung-Yun;Park, Hyung-Keun;Cha, Jae-Hoon;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.735-747
    • /
    • 2019
  • Due to the lack of ground space by urbanization, the demand of utility tunnels for laying social facilities is increasing. During the construction of a utility tunnel in downtown area using a shield TBM, various problems may occur when difficult ground is encountered such as mixed ground and cobbly ground. Thus, in this study, using MIDAS GTS NX (Ver. 280), a numerical analysis was performed on characteristics of difficult ground, reinforced area, depth of cover and groundwater level to analyze the optimal ground reinforced area according to combination of parameters. As a result, it was difficult to secure stability in unconstrained excavation cases on both the mixed ground and the cobbly ground. However, when ground reinforcement grouting as much as 2.0D is applied, convergence occurred within the allowable limit, except for mixed ground with a depth of cover 30 m. In addition, excessive leakage occurred during excavation of both the mixed ground and the cobbly layers. It was able to secure stability after applying waterproof grouting.

Seismic analysis and dynamic behavior characterization of rib-reinforced pre-cast tunnels (리브 보강 프리캐스트 터널의 내진 해석 및 동적거동 특성 파악)

  • Song, Ki-Il;Jung, Sung-Hoon;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.287-301
    • /
    • 2009
  • The novel cut-and-cover tunnel construction method using rib-reinforced pre-cast arch segments has been recently developed and applied for practice to secure a structural stability of high covering and wide width section tunnels. Cut-and-cover tunnels are usually damaged by the seismic behavior of backfill grounds in case of a low covering condition. Seismic analyses are performed in this study to characterize the dynamic behavior of rib-reinforced pre-cast arch cut-and-cover tunnels. Seismic analyzes for 2 lane cast-in-place and rib-reinforced pre-cast arch cut-and-cover tunnels are carried out by using the commercial FDM program (FLAC2D) considering various field conditions such as the covering height embankment slope and excavation slope. It can be concluded that the amplification of seismic wave is reduced due to an increase in the structural stiffness induced by rib-reinforcement. The results show that the rib-reinforced pre-cast arch cut-and-cover tunnels are more effective against the seismic loading, compared to the cast-in-place cut-and-cover tunnels.

Investigation Study on Underground Cavity Scale Estimation Based on GPR Exploration (지하공동 규모 평가를 위한 GPR 탐사 기반의 조사 연구)

  • Byoung-Jo Yoon;Han-Joo Lim;Yeon-Gyu Kim
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.737-746
    • /
    • 2023
  • Purpose: Ground subsidence due to cavity can bring about various problems, such as casualties, decrease of the safety of the structures, and indirect social costs. Therefore, ground subsidence should be prevented through the exploration and recovery of the cavity under the pavements. Method: In this study, GPR exploration method was carried out on both actual roadway and mock-up site to compensate for the problems caused by excavation and restoration process. Result: This study compared the cavity scales obtained from GPR exploration results and the direct excavation of the identified cavity. It was confirmed that the predicted soil depth by GPR exploration was similar to the identified soil depth, but the predicted cavity scale by GPR exploration overestimated the longitudinal and cross-sectional widths compared to the identified cavity scale. Conclusion: Based on the correlation between the predicted cavity scales by GPR exploration, it is possible to qualitatively estimate the cavity scales using the empirical formula proposed in this study.

A comparative study on stability evaluation of caverns by 2D continuum analysis in terms of shape factor (2차원 연속체 해석에 의한 지하공동 형상비별 안정성 평가 비교)

  • You, Kwang-Ho;Jung, Ji-Sung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.193-205
    • /
    • 2008
  • The construction of underground structures such as oil and food storage caverns are recently increasing in our country. The stability of those underground caverns are greatly influenced by their shape and size. In this study therefore, the effect that the shape of an underground cavern have on its stability were analyzed in terms of safety factor. To this end, caverns with 5 different shapes were investigated and sensitivity analyses were performed based on rock class, overburden, and lateral earth pressure coefficient. The proper amount of shotcrete and rockbolt as supports of a cavern was also assumed based on the shape and site of the cavern and rock conditions. This study is expected to be helpful in designing and evaluating the stability of caverns in future.

  • PDF

Effect of Shotcrete Lining Adherence on Load Carrying Capacity of Lining (숏크라트 라이닝 층간 부착성이 라이닝의 하중지지력에 미치는 영향)

  • Yoo, Chung-Sik;Kim, Sun-Bin;Bae, Gyu-Jin;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.41-51
    • /
    • 2006
  • This paper concerns the effect of lining interface adherence on the lining's load carrying capacity. A series of reduced scale laboratory tests and finite element anlayses were carried out with the aim of gaining insight into the effect of shotcrete lining adherence on the load carrying capacity of double shell lining. The results indicated among other things that the load carrying capacity of a double shell tunnel is significantly affected by the adherence between layers. Also revealed was that for cases with low lining layer adherence stress concentration may occur due to relative movement between the lining layers with this trend being more pronounced with increasing tunnel cover depth. Practical implications from the results of this study are discussed in great detail.

  • PDF

The application of simplified risk assessment for tunnel (터널 리스크 평가 기법의 적용성에 대한 연구)

  • Kim, Sang-Hwan;Lee, Chung-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.63-74
    • /
    • 2007
  • Unexpected ground conditions have always been a major problem for the construction of tunnel. Therefore, it is necessary to evaluate the risk capacity before and/or during construction of new tunnel. This paper presents the simplified risk assessment system using modified stability number (N), namely Underground Risk Index (URI) system, to evaluate the tunnel risk possibility in the design stage. URI is a scoring system for risk possibility by rating the each appraisal elements. The modified stability number (N) which is one of risk factor in the Interaction Matrix parameters such as RQD, UCS, weathering, overburden, stability number, ground water-table, RMR, permeability and so on, is used in the system. In addition, the case study is performed in order to verify the applicability of URI-system in practice.

  • PDF

Track Stability in Accordance with the Depth of Soil above Box Structures Constructed by Non-excavation Method on Railway Embankment (철도하부 비개착공법을 이용한 BOX구조물 설치시 토피고에 따른 궤도구조 안전성에 관한 연구)

  • Jeon, Byeon-Muk;Eum, Ki-Young;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.412-419
    • /
    • 2011
  • With an increase in rail traffic, developing activities around structures of railway have been expanded. Inevitably, the changes to cross though sub-structures of railway have been getting increased. However, this situation affects on the safe operation of trains. Generated wheel load makes on the result in settlement on roadbed and damages on track materials. Therefore, via the numerical analysis were carried out for the box structure and subground using FEM analysis program called. Visual FEA/Geo 4.19. Parametric studies were performed by changing soil depth above box structure constructed in railway embankment. A standard live load was applied to simulate loads from train. Through this study, a minimum required soil depth above subground box structure was recommended based on deformation and stresses in concrete railway system.