• Title/Summary/Keyword: 토사사면

Search Result 212, Processing Time 0.016 seconds

On the Construction of Embankment of the Eui-Rim Reservoir (의림지(義林池) 축제(築堤)에 관(關)한 일고찰(一考察))

  • Chung, In Koo
    • Journal of Korean Society of Forest Science
    • /
    • v.23 no.1
    • /
    • pp.29-33
    • /
    • 1974
  • U-Reuk, a laureate musician in the days of King Jin-Heung, Silla Dynasty, built the Eui Rim Reservoir about 1,400 years ago. This was one of the oldest man-made reservoir. The embankment of the reservoir collapsed by the clumsy artificial drainage on August 19, 1972 when the heavy rainfall of 462 mm/day caused a dangerous overflow of the reservoir. The result of the study on the mystic ancient embankment techniques are as follows: 1. Sandy loam derived from the weathering of granite which is the most widely distributed rock type in the area, was used in the embankment. Large size logs (embankment core) of 30-50 cm in diameter were buried lengthwise along the embankment. 2. The six stocks of Pinus densiflora, 3 stocks of Quercus acutissima, 1 stock of Quercus variabilis and 1 stock of Popolus maximowiczii, altogether 11 stocks are identified. Forest types in the nearby area during the days of the reservoir construction seem to be includde a considerable number of Pinus densiflora, Quercus and Populus species. 3. The angle of repose of the earth materials is taken into account during the embankment. On top of the embankment double layers of clay (20-30 cm indepth) were spread and consolidated. Layer of litter of 20-40 cm in deep covered on the clay layer of the embankment completely, and another layer of clay was consolidated over the litter. Finally, a layer of stones of 10-30 cm in diameter and clay (yellow soil layer) toped the embankment. 4. At the lower part of the embankment clay layer was thicker and became thinner as it goes upwards. At every layer, soil was consolidated and burned. When embankment was completed, it was covered evenly with heavy clay, and finally it was topped with general soil. 5. The heavy clay layer on the inner slope of the embankment showed gray phenomena and litter remained raw humus layer. The clay layer functioned as rubber in the water, and raw humus layer prevented water from seepages. Thus, the embankment was solidly built in this way. 6. The ancient embankment techniques used soils conveyed from nearby area taking the angle of repose into account. Once embankment was completed, clay and litter layers were added to have a plasticity and to withstand the water pressure. 7. It is an excellent technique that the reservoir was constructed with least labor for maximum effects while the recent embankment techniques requires a large amount of labor.

  • PDF

A Study on Space Creation and Management Plan according to Characteristics by Type in Each Small-Scale Biotope in Seoul - Base on the Amphibian Habitats - (서울시 소규모 생물서식공간 유형별 특성에 따른 조성 및 관리방안 연구 - 양서류 서식지를 중심으로 -)

  • Park, Ha-Ju;Han, Bong-Ho;Kim, Jong-Yup
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.52 no.2
    • /
    • pp.110-126
    • /
    • 2024
  • This study conducted a classification of small-scale biological habitats created in Seoul to analyze and synthesize location characteristics, habitat structure, biological habitat functions, and threat factors of representative sites, as well as derive creation and management problems according to the ecological characteristics. The aim was to suggest improvement measures and management items. Data collected through a field survey was used to categorize 39 locations, and 8 representative sites were selected by dividing them into location, water system, and size as classification criteria for typification. Due to the characteristics of each type, the site was created in an area where amphibian movement was disadvantageous due to low or disconnected connectivity with the hinterland forest, and the water supply was unstable in securing a constant flow and maintaining a constant water depth. The habitat structure has a small area, an artificial habitat structure that is unfavorable for amphibians, having the possibility of sediment inflow, and damage to the revetment area. The biological habitat function is a lack of wetland plants and the distribution of naturalized grasses, and threats include the establishment of hiking trails and decks in the surrounding area. Artificial disturbances occur adjacent to facilities. When creating habitats according to the characteristics of each type, it was necessary to review the possibility of an artificial water supply and introduce a water system with a continuous flow in order to connect the hinterland forest for amphibian movement and locate it in a place where water supply is possible. The habitat structure should be as large as possible, or several small-scale habitats should be connected to create a natural waterfront structure. In addition, additional wetland plants should be introduced to provide shelter for amphibians, and facilities such as walking paths should be installed in areas other than migration routes to prevent artificial disturbances. After construction, the management plan is to maintain various water depths for amphibians to inhabit and spawn, stabilize slopes due to sediment inflow, repair damage to revetments, and remove organic matter deposits to secure natural grasses and open water. Artificial management should be minimized. This study proposed improvement measures to improve the function of biological habitats through the analysis of problems with previously applied techniques, and based on this, in the future, small-scale biological habitat spaces suitable for the urban environment can be created for local governments that want to create small-scale biological habitat spaces, including Seoul City. It is significant in that it can provide management plans.