• Title/Summary/Keyword: 토목-BIM

Search Result 137, Processing Time 0.023 seconds

Creation of Crack BIM in Bridge Deck and Development of BIM-FEM Interoperability Algorithm (교량 바닥판의 균열 BIM 생성 및 BIM-FEM 상호 연계 알고리즘 개발)

  • Yang, Dahyeon;Lee, Min-Jin;An, Hyojoon;Jung, Hyun-Jin;Lee, Jong-Han
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.689-693
    • /
    • 2023
  • Domestic bridges with a service life of more than 30 years are expected to account for approximately 54% of all bridges within the next 10 years. As bridges rapidly deteriorate, it is necessary to establish an appropriate maintenance plan. Recent domestic and international research have focused on the integration of BIM to digitize bridge maintenance information and then enhance accessibility and usability of the information. Accordingly, this study developed a BIM-FEM interoperability algorithm for bridge decks to convert maintenance information into data and efficiently manage the history of maintenance. After creating an initial crack BIM based on an exterior damage map, bridge specification and damage information were linked to a numerical analysis that performs damage analysis considering damage scenarios and design loads. The spread of cracks obtained from the analysis results were updated into the BIM. Based on the damage spread information on the BIM, an automated technology was also developed to assess both the current and future condition ratings of the bridge deck. This approach can enable an efficient maintenance of the deck using the history data from bridge inspection and diagnosis as well as future information on cracks and defects. The expected early detection and prevention would ultimately improve the lifespan and safety of bridges.

Case Study of Civil-BIM & 3D Geographical Information (3차원 지형자료와 토목 BIM의 사례적용 연구)

  • Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.6
    • /
    • pp.569-576
    • /
    • 2011
  • Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.

Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings (국가 표준도를 이용한 토목 구조물 BIM 파라메트릭 라이브러리 구축에 관한 연구)

  • Kim, Cheong-Woon;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.128-138
    • /
    • 2014
  • Development of infrastructure component libraries is a critical requirement for the accelerated adoption of BIM in the civil engineering sector. Libraries reduce the time for BIM model creation, allows accurate quantity take offs, and shared use of standard models in a project. However, such libraries are currently in very short supply in the domestic infrastructure domain. This research introduces library components for retaining walls and box culverts generated from 2D standard drawings made publicly available by MOLIT. Commercial BIM software was used to create the concrete geometry and rebar, and dimensional/volumetric parameters were defined to maximize the reuse and generality of the libraries. Use of the these libraries in a project context demonstrates that they allow accurate and quick quantity take offs, and easier management of geometric information through the use of a single library as to numerous 2D drawings. It also demonstrates the easy modification of the geometries of the components if and when they need to changed. However, the application also showed that some of the rebar components (stirrups and length wise rebars) do not get properly updated when concrete geometries are changed, demonstrating the limits of current software applications. The research provides evidence of the many advantages of using BIM libraries in the civil engineering, thus providing the incentive for further development of standard libraries and promoting the use of BIM in infrastructure projects.

BIM Application in Design Phase for Civil Engineering Project (토목공사의 설계단계 BIM적용에 대한 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Moon, Jin-Seok;Ann, Jae-Gyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.666-669
    • /
    • 2008
  • Recently, the application of building information model (BIM) is evaluated as one of important issues in construction market through the analyzed results in successful case studies. This study suggests an integrated information management model based on BIM through the problem analysis in existing information model for design phase. The application of suggested model is verified by a case study of bridge project. Those automatic and integrated information models for design phase can be used for an effective information management model through project life cycle.

  • PDF

A Conversion Process to IFC Files for Integrated Use of Open and Web-based BIM Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Hwang, Hee-Suk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.10
    • /
    • pp.11-23
    • /
    • 2019
  • This paper designs and proposes a file conversion process to IFC file, the international standard file format for BIM, in order to ensure mutual compatability and manageability among users of commercial BIM modeling and design softwares in the civil engineering area. The proposed process insert additional properties consisting of the properties of quantity calculation codes and properties of CBS/OBS/WBS standard classification scheme, to the three dimensional object shape information of the converted IFC files, using add-in converters for commercial BIM modeling softwares. In addition, a process of integrated use of IFC files for open web-based quantity, process(4D), and construction cost(5D) management is additionally designed and implemented. Based on these works, the ultimate goal of this study is to propose a novel process for integrated use of open web-based quantity, process(4D), and construction cost(5D), from the design stage of BIM modeling to the final construction stage in the civil engineering area.

A Study on the Utilization of BIM Model using Vertex Data-based Division Method (정점데이터기반 분할기법을 활용한 BIM모델의 활용 방안 연구)

  • Jae-Yeong, Hwang;Jae-Hee, Lee;Leen-Seok, Kang
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.123-134
    • /
    • 2023
  • The BIM (Building Information Modeling) model created in the design stage can be used for prior review and schedule management for the construction stage. However, in the case of actual BIM application cases, additional work is required, such as creating a new model suitable for the construction stage, rather than using the 3D model in the design stage, due to the difference in the purpose of use between the design stage and the construction stage. Therefore, in this study, a division function of BIM model is proposed as a method of recycling it in the construction stage without a remodeling process. In addition, the application to the actual BIM model and the 4D CAD system linkage of the divided object and the comparison with the existing division method are used to verify the usability.

Proposal of BIM Application Process to Improve BIM Applicability of Basic Design in Heavy Civil Projects (토목 분야 기본설계 단계 BIM 적용성 향상을 위한 BIM 적용 프로세스 제안)

  • Song, EunSol;Moon, SoYeong
    • Land and Housing Review
    • /
    • v.13 no.3
    • /
    • pp.115-123
    • /
    • 2022
  • Recently, the adoption of BIM technology in domestic civil engineering projects has continually increased both in its numbers and scope. However, the BIM model was developed and used after the 2D design was developed instead of creating the BIM model from the conceptual design phase. BIM must be used throughout every phase of design and construction to use BIM for its original purpose. However, if BIM application is applied in heavy civil projects without a step-by-step guideline, it can confuse the market and face industry resistance to using BIM. Therefore, BIM is currently being used step by step in the civil engineering field by using BIM as a conversion design. However, the BIM conversion design method, currently being performed in the Preliminary design stage, has many difficulties due to low work efficiency. This paper analyzes the existing process of converting a 2D design into a 3D BIM model while addressing the issues related to its low work efficiency. To this end, a novel approach to 2D to BIM conversion for the design development stage is proposed.

Proposing a BIM Activation Plan in Civil Projects by Investigating Guidelines in Procurement Processes - Proposing Contents of Guidelines to Support BIM Project in the Road Sector - (국내 발주지침 보완을 통한 토목분야 BIM 활성화 전략 제안 - 도로분야 BIM 프로젝트 지원을 위한 과업지시서 구성요소 제안 -)

  • Choi, Go-eun;Lee, Jaewook;Hong, Chang Hee;Moon, Hyeonsuk;Kim, Do Young
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.47-57
    • /
    • 2023
  • The purpose of this study is to propose a guideline to help the client and bidder operate the BIM project in the domestic road field. As BIM design is mandatory in the construction field, documents disclosed by the ordering agency must essentially include procedures and step-by-step requirements to support BIM. The purpose of this study is to propose the structure and components of the guidelines that practitioners need practically by utilizing the currently announced road field guidelines. The guidelines are analyzed based on the procurement documents that were pre-emptively shared overseas, and supplemented according to the domestic situation. Furthermore, the effectiveness of the revised guidelines is confirmed through expert consultation. This study aims to contribute to creating an environment in which construction practitioners who have no experience in BIM project can efficiently carry out BIM projects.

Development Method of Civil BIM Deliverable Submission System (도로공사 기반의 BIM 성과품 납품체계 개발방안)

  • Seo, MyoungBae;Ju, KiBeom;Nah, Hei Sook
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.437-438
    • /
    • 2013
  • 최근 BIM(Building Information Modeling)은 건설사업의 뜨거운 이슈로 부각되고 있으며 기존의 건설공사에서 2D로 관리되고있는 각종 성과물을 3D로 관리하면서 간섭검토, 에너지분석, 시공성검토 등 기존의 2D로 하기 어려웠던 다양한 의사결정 등을 지원할 수 있는 새로운 기술이다. 하지만 이렇게 다양하게 BIM이 활용되기 위해서는 활용목적에 맞는 성과품 및 산출물이 적절하게 만들어져야 하나 건축분야만 일부 제시되고 있을 뿐 토목분야는 사례를 찾아보기가 힘들다. 이에 국외 토목 BIM 발주사례와 국내 건축 BIM 관련 가이드, 현행 2D 기반의 성과품 납품체계 등을 조사하여 도로분야의 BIM성과품 납품체계 개발방안을 제시하였다.

  • PDF

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.