• Title/Summary/Keyword: 토목 건설정보모델링

Search Result 47, Processing Time 0.023 seconds

Development of BIM based Maintenance Management Prototype System for Wastewater Treatment Plant (BIM 기반 하수처리시설 유지관리 프로토타입 시스템 개발)

  • Um, Dong-Yong;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1901-1910
    • /
    • 2014
  • Current domestic and overseas BIM practice and research efforts show very few examples that design and construction BIM data could be successfully used for efficient operation and maintenance (O&M) of infrastructure in particular. This study takes public wastewater treatment plant requiring an enhancement of operation and maintenance capability into account to develop a prototype BIM-based maintenance management system. The system is designed and implemented following a typical system development procedure and validated by the system outputs per four scenarios being considered to be main maintenance activities: The research results are expected to contribute to the upgrade of current wastewater treatment plant maintenance level, which is more demanded as water-related regulation and policy direction changes to region-based large scale O&M and asset management adoption, and overseas market participation.

Field Applicability of Augmented Reality Technology by Marker Mapping for Construction Project (Focused on Measurement Process of Rebar Work) (마커방식 증강현실기법의 건설현장 적용성 연구 (철근배근 검측업무 사례적용))

  • Kim, SunYoung;Kim, HyeonSeung;Moon, HyounSeok;Kang, LeenSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2509-2518
    • /
    • 2013
  • Augmented reality (AR) technology visualizes a real type object that cannot simulate in virtual reality technology by overlapping a virtual object and real object in a computer system. This study suggests a methodology and prototype system for applying AR system to rebar distribution work in a civil engineering project. Rebar work in civil engineering project is a representative activity that is progressed by empirical approach of skilled labor rather than formalized manual. AR technology improves the constructability of rebar work because AR tool can identify missing rebars and different rebars comparing with the drawings. AR system developed in this study can enhance the understanding of rebar work using 3D modeling with real image of construction site and save construction cost by reducing reconstruction work.

Earthquake Response Analysis of a RC Bridge Including the Effect of Repair/retrofitting (보수/보강 효과를 고려한 철근콘크리트교량의 내진응답해석)

  • Lee, Do Hyung;Cho, Kyu Sang;Jeon, Jeong Moon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.611-622
    • /
    • 2008
  • Nonlinear analyses have been carried out for both bridge piers and a bridge structure being repaired using a repair element in order to assess the post-repair seismic response of such structures. For this purpose, a simplified CFRP stress-strain model has been proposed. The analytical predictions incorporating the current developments correlate reasonably well with experimental results in terms of strength and stiffness. In addition, nonlinear dynamaic analyses have also been conducted for a bridge structure in terms of the created multiple earthquake sets to evaluate the effect of pier repair on the response of a whole bridge structure. In these analyses, potential plastic hinge zones of piers are virtually repaired by CFRP and steel jacketing. Comparative results prove the virtual necessity of performing nonlinear post-repair analyses under multiple earthquakes, particularly when the post-repair response features are required. In all, the present approaches are expected to provide salient information regarding a healthy seismic repair intervention of a damaged strcuture.

DEM Construction and Spatial Analysis of the Planned Construction Site for Establishment of Housing Construction Planning (주택건설 사업계획 수립을 위한 공사 예정지의 DEM 구축 및 공간분석)

  • Park, Joon-Kyu;Lee, Keun-Wang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.621-626
    • /
    • 2021
  • In this study, data on the study site for apartment construction was acquired, and the quantity of construction waste was calculated using a drone and mobile 3D laser scanner. The accuracy of the drone was 0.034 to 0.064m in the horizontal and vertical directions, respectively, and the mobile 3D Laser Scanner showed an accuracy of 0.018 to 0.049m in the horizontal direction, respectively. These results suggest that it is possible to construct spatial information using a drone and mobile 3D laser scanner with a value within the allowable accuracy of 1:1,000 digital terrain. The volume of construction waste calculated using the mobile 3D laser scanner data was 70,797㎥. It was possible to calculate the volume on the side of the building or some facilities that appeared as shaded areas in the drone outcomes. In addition, modeling was performed for view analysis of the apartments scheduled to be constructed and the terrain-based modeling results of the surrounding buildings. In the future, data construction and accuracy evaluation using mobile 3D laser scanners will be conducted. In addition, additional research comparing existing methods and work processes will be carried out, and the efficiency of mobile 3D laser scanners in the field of spatial information construction can be presented.

Response Analysis of Frame Structures with the Consideration of Tunnel Construction (프레임구조물의 터널시공에 따른 거동분석)

  • Son, Moorak;Park, Jaehyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3C
    • /
    • pp.121-127
    • /
    • 2012
  • This paper investigates the response of frame structures with the consideration of tunnel construction (ground loss) conditions. The response of four-story open frame structure and block-infilled frame structures, which are subjected to tunnelling-induced ground movements, has been investigated in different construction (ground loss) conditions using numerical analysis. The open frame structure has been modelled as an elastic structure, while the block-infilled frame structure has been modelled to have real cracks when the shear and tensile stress exceed the maximum shear and tensile strength. The response of the two different frame structures has been investigated in terms of construction (ground loss) conditions considering the magnitude of deformations and cracks in structures. In addition, the damage levels, which are possibly induced in the structures, has been provided in terms of construction (ground loss) conditions using the state of strain damage estimation criterion (Son and Cording, 2005). The results of this study will provide a background for better understandings for controlling and minimizing building damage on nearby frame structures due to tunnelling-induced ground movements.

Workflow Procedures and Applications in BIM-based Design for Safety (DfS) (BIM 기반 설계안전성검토의 업무 절차와 활용 방안에 관한 연구)

  • Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.125-137
    • /
    • 2024
  • A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.

A Study on the Development of the Problem Improvement Directions in Enhancing BIM Data Interoperability through IFC (IFC를 통한 BIM 데이터의 상호연동 시 문제점분석 및 개선방향 설정에 관한 연구)

  • Kim, Ji-Won;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.88-98
    • /
    • 2009
  • Construction industries have increasingly utilized Building information Modeling (BIM) technologies. Interoperability - the capability for BIM data to run from one computer application to another in the life cycle of a project has become one of the principal research areas. Enhancing interoperability inevitably requires information structures that are standardized throughout the construction industries. As a candidate of the data exchange standard, Industry Foundation Classes (IFC) has been developed and several researches recently performed to measure its richness of digital data exchange. But doubts have been brought up whether IFC meets a sufficient level of interoperability since the research result revealed a number of cases of information misrepresentation and loss. This research presents the lessons learned from the interoperability tests of three widely used 3D design applications including Graphisoft's Archicad, Autodesk's Revit, and Bentley's Bentley Architecture. One building's architectural and structural design data were modeled with the three tools and exchanged through IFC respectively for interoperability test.

Three-dimensional resistivity imaging for site investigations in civil engineering (지반조사를 위한 3차원 전기비저항 탐사)

  • Chung Seung-Hwan;Yi Myeong-Jong;Kim Jung-Ho;Cho Seong-Jun;Song Yoonho
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.21-36
    • /
    • 1999
  • Recently resistivity survey is widely used for site investigations in the field of civil engineering. Since such application area requires accurate interpretation tools especially in the area of complicated geology and rough terrain topography, we developed a three-dimensional (3-D) resistivity inversion code, which can reconstruct real earth structures. Furthermore, the inversion code gives resolution-enhanced images by applying the ACB(Active Constraint Balancing) method. With the help of this inversion code, 3-D resistivity survey is now used as new techniques for site investigations in civil engineering problem. By imaging the 3-D resistivity distribution, we could get useful informations such as depth distribution of basement rock, distribution of weak zone, fractures and cavities which is crucial to civil engineers.

  • PDF

Design of Interface between 3D Object Model and Structure Analysis Program (3D 객체 모델과 구조해석 프로그램의 인터페이스 설계)

  • Park, Jae-Geun;Kim, Min-Hee;Lee, Kwang-Myong;Choi, Jung-Ho;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.3
    • /
    • pp.247-252
    • /
    • 2008
  • Recently, the virtual construction system in which project participants efficiently share and control the information throughout the life-cycle of construction project using 3D object models is being developed all over the world. In this paper, a design of interface between 3D object model of structures and structural analysis system that is essential for the analysis and design of civil structures in the virtual space is treated. The relation parametric modeling technique that is needed to make the 3D object models and the construction method of product breakdown structure(PBS) that considers the several parameters for the structural analysis are presented. PBS is built so that it is possible to extract needed attribute information from 3D object model and to apply it to the structural analysis. Design methodology for interface program is proposed that several numerical values determined by the cooperative work same as structural analysis are delivered to 3D object models without additional work. An interface program between 3D object models and structural analysis system developed based on the proposed method would be effectively used to develop virtual construction system.

BIM Mesh Optimization Algorithm Using K-Nearest Neighbors for Augmented Reality Visualization (증강현실 시각화를 위해 K-최근접 이웃을 사용한 BIM 메쉬 경량화 알고리즘)

  • Pa, Pa Win Aung;Lee, Donghwan;Park, Jooyoung;Cho, Mingeon;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.249-256
    • /
    • 2022
  • Various studies are being actively conducted to show that the real-time visualization technology that combines BIM (Building Information Modeling) and AR (Augmented Reality) helps to increase construction management decision-making and processing efficiency. However, when large-capacity BIM data is projected into AR, there are various limitations such as data transmission and connection problems and the image cut-off issue. To improve the high efficiency of visualizing, a mesh optimization algorithm based on the k-nearest neighbors (KNN) classification framework to reconstruct BIM data is proposed in place of existing mesh optimization methods that are complicated and cannot adequately handle meshes with numerous boundaries of the 3D models. In the proposed algorithm, our target BIM model is optimized with the Unity C# code based on triangle centroid concepts and classified using the KNN. As a result, the algorithm can check the number of mesh vertices and triangles before and after optimization of the entire model and each structure. In addition, it is able to optimize the mesh vertices of the original model by approximately 56 % and the triangles by about 42 %. Moreover, compared to the original model, the optimized model shows no visual differences in the model elements and information, meaning that high-performance visualization can be expected when using AR devices.