• Title/Summary/Keyword: 터널 굴착방식

Search Result 43, Processing Time 0.023 seconds

A study on the selection of optimal cross section according to the ventilation system in TBM road tunnels (TBM 도로터널의 환기방식에 따른 최적단면 선정에 관한 연구)

  • Lee, Ho-Keun;Kang, Hyun-Wook;Kim, Hyun-Soo;Kim, Hong-Moon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.135-148
    • /
    • 2013
  • Recently, road tunnels have become longer and the plans for long and deep road tunnel have been underway in urban areas. These long and deep tunnel excavations include NATM and TBM. Shield TBM is applied to around 80% of traffic tunnels in Europe, and approximately 30% of them in other developed countries. However, as much of equipment is imported from foreign countries at high prices and distribution rate of TBM tunnel is considerably low in Korea, NATM excavation method is commonly used. To increase TBM tunnel, it is necessary to do assure economic feasibility with the supply-demand of TBM equipment. For this, the selection of standardized TBM diameter is urgently needed. Therefore, the study aims to estimate the standardized optimum section properties of TBM by examining TBM excavation cross section utilization depending on the volume of traffic, the number of lane and its cross-section type(single or double deck), and ventilation system.

The Study on Optimum Ventilation System during Long Tunnel Construction (굴착중인 장대터널내 최적의 환기시스템에 대한 연구)

  • Oh, Byung-Hwa;Lim, Han-Uk
    • Explosives and Blasting
    • /
    • v.24 no.2
    • /
    • pp.9-22
    • /
    • 2006
  • In general, tunnel construction except for special cases such as very short tunnels must require an artificial ventilation system. Especially, it is efficient for long tunnels to use the combination of a proper ventilation system according to the progress of the excavation. Neung-Dong Tunnel of which length is 4,580m has been originally designed as using ventilation system of blower and exhaust mixture types. Since it has been expected to result in some problems, its design Is analyzed to find the way to improve ventilation system by estimating the amount of required fresh air, considering various ventilation mixture types, ventilation's fluidity analysis and contaminant's distribution by numerical analysis. Economical efficiency for each type is also reviewed to determine the best ventilation system.

Current Status of Rock Cutting Technique Using Undercutting Concept (언더커팅 개념을 적용한 암반절삭기술의 현황 분석)

  • Jeong, Hoyoung;Choi, Seungbeom;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.29 no.3
    • /
    • pp.148-156
    • /
    • 2019
  • In urban area, the use of mechanical excavators (e.g., TBM and roadheader) has been increasing in construction of tunnelling and underground space. The undercutting technology, which is modified from the conventional rock-cutting concept, has been developed by advanced countries. Therefore, research on the latest technology of mechanical excavation is required, and keeping carrying out research on conventional mechanical tunneling methods at the same time. In this study, as a fundamental study of the undercutting technique, the principle and concept of the undercutting were introduced, as well as the current status of the research of advanced countries. The undercutting is applicable as a full-face excavation method for the tunnels and underground spaces, as well as an auxiliary(partial-face excavation) method for extension of the existing tunnels.

A Study on Experimental Method of Blasting Vibration in Curing Concrete (양생중인 콘크리트에서의 발파진동의 영향 시험방법에 대한 연구)

  • Kim, Jang-Deuk;Kim, Yong-Ha
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.417-422
    • /
    • 2009
  • Tunnels that have recently been constructed are characterized by longer length than ever before and furthermore they frequently go through the ground area with poor conditions such as fractured zones. If ground strength is weak, plastic deformation of tunnel occurs, and occasionally a big fall may be brought about. Up to now, the construction work of tunneling has been executed as a sequential method placing the lining concrete after completion of excavation. Such a method requires a long time and much money to complete the tunnel. It is hard to ensure the stability of tunnel if tunnel is left undone for a long time after excavation in fracture zones or plastic grounds. For this reason, we tried to take simultaneous construction of tunnel excavation and lining concrete in order to not only shorten construction schedule but also stabilize the tunnel at the highly fractures zone as soon as possible. As preliminary consideration for simultaneous construction, in-situ tests are performed to calculate the isolation distance over which blasting vibration does not influence the strength of lining concrete. Improvement of ling form, placing method of concrete, ventilation using a dust collector, together with equipment arrangement, was made to assure the simultaneous construction work.

Norwegian Rock Excavation Technology (노르웨이의 암석굴착 기술)

  • 김민규
    • Tunnel and Underground Space
    • /
    • v.10 no.4
    • /
    • pp.544-552
    • /
    • 2000
  • Norway has the geological of condition of hard bedrocks, high mountains, deep valleys and fjords. In this background many tunnels and rock caverns are developed. In this process of constructing tunnels and rock caverns Norway seems to have strong competitiveness in the construction of tunnels. In spite of high salaries to the tunnel workers, Norwegian contractors are probably producing the cheapest tunnels and rock caverns in the world. Besides benefit of hard-rock geology, Norwegian cost-saying is owing to the Norwegian excavation technique in hard rocks such as unlined pressure tunnels, air cushion chambers, underwater piercing, and reasonable contract system and organization of workers developed from the accumulated experience. Brief analytical description of them are given in this paper in order to stimulate the utilization of the underground spaces.

  • PDF

Effect of widening excavation in divergence section of a double-deck tunnel on its stability (복층터널 분기구 확폭구간 굴착에 따른 안정성 영향)

  • La, You-Sung;Kim, Yunhee;Lee, Kangil;Kim, Yongseong;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.435-450
    • /
    • 2020
  • The divergence section of a double-deck tunnel can be divided into a 'widening pre-divergence section', a large cross-section with a cap shape and a 'post-divergence section' where the separation between the main and the branch tunnel is made. Since the cross-section of the widening pre-divergence section is considerably larger than that of the post-divergence section, the influence of excavation due to the different sizes and shapes in the cross-section should be considered in the examination of the tunnel stability. In this study, the effect of the preceding excavation, that is the excavation of the widening pre-divergence section, on excavation stability of the post-divergence section was examined by varying the excavation methods and bench lengths through 3D finite element analysis. The results showed that although the effects of the excavation methods and the bench lengths are not significant on the variation of principal stresses, the preceding excavation causes a relatively large variation on the stresses which may have an impact on the stability of the post-divergence section from the comparison of Stress-Strength Ratio (SSR) between the cases with and without the consideration of the preceding excavation effect by 2D finite element analysis.

Operating Process of Transverse Type Roadheader for Tunnel Excavation in Korea (횡방향 타입 로드헤더의 터널면 절삭공정 고찰)

  • Min-Gi Cho;Jung-Woo Cho;Mun-Gyu Kim;Jae-Hoon Jeong;Sung-Hyun Choi
    • Tunnel and Underground Space
    • /
    • v.33 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • Roadheaders have been operated in the construction of Korean tunneling projects. The note introduces operation manual and management case of transverse type roadhead in a Korean tunneling site. The cutting and reaction forces of axial and transverse type cutting heads were qualitatively analyzed. The shaping surfaces of tunnel faces were visualized in both cases of fixed and auto-controlled telescopic cylinder conditions. Excavating with fixed cylinder, concave surfaces were shaped on tunnel face. The total processes of sumping and shearing were illustrated for excavating hard rock tunneling. The supplementary graphical explanations for total tunneling procedures in Korea were provided.

Variation of Manning's Coefficient due to Interval of Multi-Piers in Tunnel (터널내 다열기둥의 배치간격에 따른 Manning계수의 변화)

  • Yoon, Sung-Bum;Kwon, Kab-Keun;Lee, Sang-Min;Kim, Hyung-Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.542-545
    • /
    • 2007
  • 터널의 노면 양쪽에 관로를 설치하여 유입된 지하수를 배출시키는 방법은 일반적인 터널 배수공법이지만 배수관로의 설치를 위한 추가적인 굴착은 공사기간과 공사비의 상승으로 이어지는 실정이다. 이에 터널 내에 별도의 배수관로 굴착 없이 노면 하부에 다열기둥을 일정 간격으로 매설하여 지하수의 흐름방향을 노면 하부로 유도시키는 경제적인 배수시스템이 현재 연구 중이다. 이 터널배수시스템은 추가적 굴착이 없어 기존의 배수시스템보다 경제적이지만 다열기둥의 연속적인 배치를 필요로 하므로 기존의 관로배수방식보다 더 많은 유체의 흐름저항을 받게 된다. 따라서 유체의 흐름에 효율적인 다열기둥 간의 배치간격에 대한 연구가 필요하다. 그래서 본 연구에서는 노면 하부에 다열기둥이 매설된 터널 내로 유입하는 지하수 배출을 목적으로 다열기둥 간의 배치간격에 따른 Manning계수의 변화를 수리실험을 통해 측정 분석하였다. 특히 Manning계수는 개수로에서 유체흐름 저항의 정도를 파악하는 데 이용되는 인자로 이를 활용하여 지하수 배수에 적절한 다열기둥 배치간격을 산정하였다. 본 연구를 통해 얻어진 수리실험 자료는 노면하부에 다열기둥을 매설하는 터널공사의 실제 설계를 위한 기초적인 참고자료로 사용될 것으로 기대된다.

  • PDF

A study on the relationship between initial and final convergence in NATM tunnels (NATM 터널 굴착시 초기 내공변위와 최종 내공변위의 상관관계 연구)

  • Kim, Bum-Joo;Hwang, Young-Cheol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.233-243
    • /
    • 2008
  • A tunnel behavior predicted in the investigation and design stage is often different from its actual behavior due to mainly the complexity of ground conditions. In a tunnel construction, therefore, it is necessary to ensure the stability of the tunnel by predicting the behaviors of the ground and the supports through observations and measurements, and modifying immediately excavation and reinforcing methods when necessary. To do so, it is important to be able to predict the final tunnel behavior based on the initial tunnel behavior as early as possible. In this study, the correlations were obtained between the initial and the final convergence by analyzing statistically the convergence measurement data, collected from two domestic road tunnels under construction using NATM. In order to estimate the unknown displacements, occurred during the period between the excavation and the first measurement, two methods were used - one is the method by means of regression analysis using a modified exponential function and the other the method by a simple linear regression analysis using the data measured within the distance from tunnel face equal to the tunnel diameter (D). Finally, the relationships were obtained between the initial and final convergence, including the non-measured displacements estimated from the two different methods, by performing linear regression analyses. The regression analysis results showed that there are clear linear relationships between the initial and final convegence and the difference between the two linear regression equations was not that large for when using the exponential function and the simple linear function to estimate the non-measured displacements.

  • PDF