• Title/Summary/Keyword: 터널안전

Search Result 914, Processing Time 0.028 seconds

Evaluation of seismic performance of road tunnels in operation (운영 중인 도로 터널의 내진 성능 평가)

  • Ahn, Jae-Kwang;Park, Du-Hee;Kim, Dong-Kyu;Kim, Kwang-Yeom
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.69-80
    • /
    • 2013
  • This study evaluates the seismic performance of road tunnels designed before the provisions for seismic design of tunnels were first established in 1999. Extensive design data and site investigation reports are investigated to select tunnels sections that are considered to be most susceptible to seismically induced damage under earthquake loading. Detailed analyses are performed on selected tunnels. The methods used are method of displacement and dynamic analysis. In performing the method of displacement, which is a type of pseudo-static analysis method used for underground structures, full domain and reduced domain modeling were used. The dynamic analyses are performed using finite difference method and using nonlinear constitutive model. Comparisons show that the reduced domain method of displacement match very closely with the dynamic analysis, demonstrating that it is the most suitable method for evaluating the seismic performance of road tunnels built in rocks. It is also shown that road tunnels, for which seismic design were not applied, are safe under the seismic risks corresponding to an earthquake with a return period 1000 years. It is concluded that additional seismic retrofit of tunnels is not necessary.

Simulation of shield TBM tunneling in soft ground by laboratory model test (실내모형시험을 통한 연약지반의 쉴드 TBM 터널굴착 모사)

  • Han, Myeong-Sik;Kim, Young-Joon;Shin, Il-Jae;Lee, Yong-Joo;Shin, Yong-Suk;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.5
    • /
    • pp.483-496
    • /
    • 2013
  • This paper presents the shield TBM technology in soft ground tunnelling. In order to perform this study, a scale model test was carried out using the developed small scaled shield TBM machine. The various instrumentations were conducted during the simulation of tunnelling. In addition, the ground behavior due to the shield TBM operation parameters was measured during the simulation. Based on the simulation results, the stability of the ground was evaluated and the fundamental shield TBM tunnelling technique in the soft ground was suggested. In conclusion, design's reliability through laboratory small scale model test about Shield-TBM section was obtained, and both the improvement plan for safety during construction and the construction plan for securing airport runway's safety during tunnel passing by Shield-TBM propulsion were suggested.

A Development of Tunnel Grouting Programme using A Research of Grouting Construction Process (터널 차수 그라우팅 시공 프로세스 연구를 통한 프로그램 개발)

  • Kim, Jin-Chun;Yoo, Byung-Sun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.11 no.1
    • /
    • pp.23-30
    • /
    • 2018
  • The purpose of this study is to provide an integrated solution which includes construction process that allows effective tunnel grouting and to develop a tunnel grouting programme by establishing an algorithm through theoretical analysis on tunnel grouting construction technique factors. In order to verify the developed tunnel grouting procedure and the effectiveness of the programme, they are applied on certain work sites. Values after the application are Lu = 0.31 and ground-water inflow = 0.191/min where as the pre-application value of ground-water inflow is 6.691/min which is approximately 35 times larger. This shows that Tunnel grouting construction effect is significant and suggests the possibility of the application of the process and the programme on future tunnel grouting construction.

A Study on the Decision of Influence Range of External Temperature in the Tunnel Using Thermal Camera (열화상카메라를 활용한 외부온도의 터널내 영향범위 산정방법 연구)

  • Lee, Yu-Seok;Lee, Tea-Jong;Park, Gwang-Rim;Oh, Young-Seok;Cha, Cheol-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.5
    • /
    • pp.136-143
    • /
    • 2010
  • There are three parts of tunnel which are influenced by outside temperature, entrance, exit and vent. These parts showed different tendency of deterioration(very rapid deterioration speed, wide range of defects, etc) compared with last parts of tunnel. Therefore, it needs to have different points of view when civil engineers analyze the defects on these parts and apply the retrofit or rehabilitation methods for them. However, when we conduct maintenance works, precise inspection and precise safety diagnosis, these defects had been neglected because those were considered as unimportant defects and caused from temporary weather and temperature change. In this study, two urban tunnels were analyzed to decide the range of tunnel which are influenced by outside temperature using a thermal camera, and to find out the causes of defects on these parts. From the results, the main points of maintenance were presented.

Experimental Study on Minimum Distance between Tunnel and Interchange by Driving Simulator (터널 - IC 분기점간 최소이격거리 연구)

  • Lee, Jong-Hak;Noh, Kwan-Sub;Kim, Jong-Min
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.37-45
    • /
    • 2009
  • The minimum distance between tunnel and interchange has several steps to go through for road users; when road user comes out of tunnel, he/she reads information on road sign and tries to change the lane, and then reaches the destination (interchange). So that's why that minimum distance between tunnel and interchange has to be designed to reflect human factors sufficiently for road's users. This study aims to set for minimum distance between tunnel and interchange with involved human factors. People aged from their twenties to their seventies took part in this experiment by using driving simulator. As a result, the minimum distance between them was loom long. When it comes to this study for minimum distance between tunnel and interchange, this study will be significant in some ways reason why this method can be applied to all road facilities for road safety on scientific basis. In the near future, It will make a recommendation concerning the most suitable data for road safety by contributing better guideline.

  • PDF

A study of the HRR and fire propagation phenomena for the fire safety design of deep road tunnel (대심도터널 화재 안전 설계를 위한 승용차의 열방출률 및 화재전파 특성에 관한 연구)

  • Yoo, Yong-Ho;Kweon, Oh-Sang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.321-328
    • /
    • 2010
  • The study performed an actual fire experiment in order to propose the heat release rate of automobile that is the most basic architectural element for the fire safety design in a tunnel, whose importance has been recognized as the underground traffic tunnels are planned in Korean metropolitan cities. The heat release rate of a van is measured by the large scale calorimeter, in which the law of oxygen consumption is applied, and the fire expansion characteristics in a tunnel by placing two passenger cars nearby one another in the tunnel. As the results, the heat release rate of the van was revealed to be 5.9 MW, and carbon monoxide was emitted 482 ppm at a maximum. In case of two passenger car experiment for the fire expansion characteristics, the adjacent car was ignited about 3 minutes 30 seconds after the fire occurrence, and the complete fire was developed after 15 minutes. The maximum heat release was 9 MW. The results from the actual fire experiment can be an important input data for future quantitative analysis as well as an element applicable to a tunnel disaster preventive equipment design.

A development of the ground settlement evaluation chart on tunnel excavation (터널굴착에 따른 지반침하 예측을 위한 침하량 평가도표 개발)

  • Park, Chi Myeon;You, Kwang-Ho;Lee, Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1105-1123
    • /
    • 2018
  • The main risk factors of tunnel excavation through urban areas are ground settlement and surface sink which caused by ground conditions, excavation method, groundwater condition, excavation length, support method, etc. In the process of ground settlement assessment, the numerical analysis should be conducted considering the displacement and stress due to tunnel excavation. Therefore a technique that can simplify such process and easily evaluate the influence of tunnel excavation is needed. This study focused on the tunnelling-induced ground settlement which is main consideration of underground safety impact assessment. The parametric numerical analyses were performed considering such parameters as ground conditions, tunnel depth, and lateral distance from tunnel center line, etc. A simplified ground settlement evaluation chart was suggested by analyzing tendency of ground subsidence, lateral influence area and character by depth. The applicability of the suggested settlement evaluation chart was verified by comparative numerical analysis of settlement characteristics.

A basic study on the location of mirror reflector system to improve illumination environment (터널의 조명환경 개선을 위한 반사거울 시스템의 위치 선정에 관한 기초연구)

  • Jeong, Myeong-Soon;Joo, Jae-Sung;Jeong, In-Young;Song, Kyoo-Dong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.5
    • /
    • pp.385-393
    • /
    • 2011
  • As the economic growth achieved and the straight road was increased. so, the tunnel built more than before. In these days, lighting of tunnel entrance is important for safety and comfortable driving. Most of the tunnel lighting depend on artificial lighting and they use a lot of energy. In this paper, as a research for illumination improvement and saving energy at tunnel, reflecting mirror system is suggested. The performance of the system was evaluated with respect to various aspects. By applying a reflective mirror system, tunnel lighting and environment can be improved. This study is a preliminary study for developing a system to save energy of tunnel artificial lighting.