In case of applying BIM method to the civil engineering of irregularly shaped structure, BIM method is recognized to have relatively high construction productivity. In this paper, we developed quantity calculation algorithms applying BIM method to NATM tunnel construction method and implemented BIM based 3D-BIM Modeling Quantity Calculation. The results showed that BIM-based method has high reliabilty in structure work in which errors occurred only in the range between 0.00% and -1.45%. On the other hand, BIM method applied to earth work showed great error range of -19.78% to 35.30%. So the benefit and applicability of BIM method in civil engineering were confirmed. In addition, routine method for the quantity of earth work has negligible error as in the case of structure work. But, rock type's quantity calculation showed significant errors so that the reliability of 2D-based volume calculation is problematic. It may thus be concluded that 3D-BIM is more reliable than the routine method in estimating the quantity of earth work. Considering the reliability and merits in the stage of its design, construction and maintenance levels, the application of BIM to civil engineering works is recommended.
Journal of Korean Tunnelling and Underground Space Association
/
v.15
no.2
/
pp.97-111
/
2013
It is very important to understand the condition of the surround rock for the successful construction of underground space. Representative methods of estimating the rock mass condition are RMR method and Q-system, and they are applied on design, construction, and maintenance. However, many problems with the accuracy of the measurement method and the subjective viewpoint are questioned continuously, so many researchers have been studied for estimating rock condition from various methods. Most of them show only the local relation and a tendency between site investigation data and rock conditions. In this paper, the relationship between RMR method and electrical resistivity is deducted using the analytical equation derived theoretically from electric field analysis on jointed rock mass. And also, probabilistic relationship between RMR method and electrical resistivity is deducted for the increase of accuracy. If a suggested method is applied with the conventional method for estimating the rock condition, it will be helpful to estimate RMR values on the field.
Although set accelerating agents are used generally in New Austrian Tunneling Method, the standards for test methods and quality of set accelerating agents are not prescribed domestically. In this study, the proprieties of the various standards and the characteristics of set accelerating agents for shotcrete were evaluated. The alkali contents of set accelerating agents based on silicate, aluminate and cement were higher than those of alkali-free ones. From the result, it is thought that the quality control of aggregate should be enhanced and that the number of test cycle of alkali-aggregate reaction should be increased. The setting times of cement paste with set accelerating agents based on silicate and alkali-free ones were different largely with mixing methods. Compressive strength of mortar with set accelerating agents based on silicate, aluminate and cement at one day satisfied the specifications of Korea Concrete Institute. However, the strength ratio compared to control mix at 28 days showed as $50{\~}65\%$ except for the alkali-free set accelerating agents. As a results of setting time and strength test, the establishment of domestic standards that can reflect the characteristics of materials and construction methods of tunnels and that can increase quality of set accelerating agents is required immediately.
Amid increasingly saturated ground space, development of underground space has been booming throughout the world and excavation has been underway near the structure above or under the ground level. But the ground subsidence caused by improper or poor construction technologies, underground water leakage, sudden changes of stratum and the problem with earth retaining system component has been emerged as hot social issue. To deal with such problems nationwide, establishment of preventive and proactive disaster management and rapid restoration system has been pushed now. In this study, collection of the data on technology development trend to secure the underground safety was made, taking into account of internal change elements (changing groundwater level, damage to underground utilities, etc) and external change elements (vehicle load, earthquake and ground excavation, etc) during excavation. Amid the growing need of ground behavior analysis, ground subsidence evaluation technology, safe excavation to prevent ground subsidence and reinforcement technology, improvement of rapid restoration technology in preparation for ground subsidence and development of independent capability, this study is intended to introduce the technology development in a bid to prevent the ground subsidence during excavation. It's categorized into prediction/evaluation technology, complex detect technology, waterproof reinforcement technology, rapid restoration technology and excavation technology which, in part, has been in process now.
Kim, Hyung-Tae;Han, Man-Yop;Son, Yeun-Jin;Han, Rok-Hee;Jeong, Ji-Man
Proceedings of the Korea Concrete Institute Conference
/
2008.11a
/
pp.891-894
/
2008
This study was performed to investigate how to design, where to construct, why to degrade, what plan to use systematically the underground structures such as underpass, underground passageways. About 50% of the underground structures are located on Seoul, Kyungi-Do. In design of the underground structures such as underpass, underground passageways, the required conditions are defined. And also in construction stage, the conditions of soil, required structure depth, site characteristics, reasonable construction method, are investigated. In the selection of details for underground structure, the items mainly considered, are the wall and column type, the sidewalk type, anchoring-system type, the water-proofing method, entranc shape. The reason and the adequate measures for the degradation of concrete structure are also investigated. The initial cracking properties due to the thermal characteristic are considered. The state of the art report on the new technologies are reviewed. The recent project for the systematically application to the underground structures is reviewed.
Journal of the Korea institute for structural maintenance and inspection
/
v.15
no.6
/
pp.195-200
/
2011
KS F 2782 (for shotcrete accelerators) standard cross-section of tunnel construction or repair is a reinforcement used in the field of shotcrete accelerators as a criterion in assessing shotcrete performance. Thus, KS F 2782 by standard accelerator will determine the nature of the product of concrete accelerators that will be used to record variations in the product roles, through determination of the quality of the experimental method to identify only the quality of the many variables that exist. This evaluation standard has so far distinguished accelerator products in indoor experiments that do not meet quality standards but were mostly for an on-site accelerator mixed with the shotcrete after being quite satisfied with the level of quality in a certain number of products. This observation is derived from the results of an indoor experiment considered to verify whether the site is suitable for indoor experiments, and whether its actual location in the city is relevant to the accelerator quality, to find a way to test if it fits. This study centers on the material conditions of the shotcrete accelerator and a variety of experimental results, and used the Gilmore needle to compare the compressive strength and KS F 2782 specification of the accelerator as a means to ensure product quality conformity analysis and for further research experiments. In conclusion, a portion of KS F 2782 standard that fixes the problems that can be resolved from the ground up as a whole is not a review for the domestic reality. As an indoor experiment to ensure uniformity in the field when applied in a sufficient correlation, complement must be in place.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.