The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

자동차 생산시스템에 대한 Cost 변화분석

  • Kim, Tae-Ho;Gwon, Jeong-Hwi;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.516-526
    • /
    • 2005
  • 자동차 생산시스템에서 택트타임의 변화에 따른 원가분석을 실시하고 자동차 업체의 원가관리 방안을 연구하였다. 또한 납입시간에 따른 대기시간 및 원가분석을 하였다. 자동차 생산라인은 양상 체제이므로 무엇보다도 택트타임관리가 이익관리와 직결한다. 현장 인터뷰와 자료조사를 통해 수집된 자료와 정보를 토대로 하여 시뮬레이션 분석을 하였다.

  • PDF

Understanding and Implementation Strategy of Tact Time, Pitch Time and Cycle Time (택트타임, 피치타임, 사이클타임의 이해와 적용방안)

  • Choe, Seong-Un
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.557-561
    • /
    • 2011
  • The study proposes three types of production lead time according to the production or demand pattern. First of all, it discusses the difference of three lead times. While pitch time and cycle time are used in push system with process stock and mass conveyor production, the tact time is used in pull system like as JIT based lean production system.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

인간공학적 작업장 분석 및 공정개선 사례

  • 박해천;정문조
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.564-571
    • /
    • 2003
  • 현대 산업사회는 첨단 산업기술의 발전으로 많은 생산시설이 자동화되고, 작업형태 또한 생산성을 높이기 위한 택트타임(tact time) 분석으로 작업이 더욱 세분화되고 있으며, 이로 인해 작업자의 특정 신체부위만 집중적으로 사용하는 단순 반복작업이 크게 증가하고 있다. 그 결과 작업자가 어깨, 허리, 손목 등에 통증을 호소하는 근골격계질환이 계속 증가하는 추세에 있다. 노동부 자료[1]에 의하면 근골격계질환자 수가 2000년 1,009명, 2001년 1,598명이고 2002년 상반기만 1,069명으로 점차 증가 추세를 보이고 있으며, 2002년 한해 동안만 ○○중공업 253명, ○○조선 158명, ○○자동차 78명의 근골격계질환자가 발생하여 산업재해 판정을 받음으로써, 이로 인한 노동력 상실 및 막대한 비용 손실로 인해 심각한 사회적인 문제로 대두되고 있다[2].(중략)

  • PDF

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.