Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

A study on the work environment and accident exposure status of Tower Crane workers (타워크레인 작업 근로자의 작업환경과 사고 노출 실태에 관한 연구)

  • Choi, Seo-Yeon;Cho, Kee-Hong;Park, Dong-Hyun;Choi, Byung-Gil
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.115-123
    • /
    • 2015
  • The study conducted statistical analysis of survey on the 239 workers participating in national Tower Crane installation/dismantlement in order to identify work environment and health hazard exposure of Tower Crane workers. Consequently for work related safety status of Tower Crane workers, the number of installation/dismantlement work was the highest at 15-20 times per month, and safety equipments were not arranged at work and they felt highly anxious when boarding on the Tower Crane. Furthermore, it is found that they feel anxious working in the influence of the weather, noise, vibration, wind, the sun ray, and structure characteristic. They have very low satisfaction in the insecureness of workplace and the work environment, and recognizes that their work affect highly on the health. 81.6% of workers have experienced accident at work, the cause of accidents were mainly due to poor work environment, and the health abnormality they have experienced were mostly fatigue and concentration reduction. For job stress, job demand and conflict in relationship were the highest sections. Total 66.5% of workers complained of musculoskeletal disorder related subjective symptom, and back pain patients were the highest of all groups.

A Study on the Structural Safety of Tower Crane Telescoping Work according to Wind Speed and Load (타워크레인 텔레스코핑 작업의 풍속 및 하중에 대한 구조 안전성 연구)

  • Jung, Sung-Lyoung;Lee, Do-Geun;Paik, Shinwon;Shin, Sang-Yeon
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.1
    • /
    • pp.9-17
    • /
    • 2021
  • This study analyses the load imbalance of the tower crane used in telescoping work for structural safety, owing to the difference in wind speed and balance weight position. This is because wind speed and position of the balance weight have a significant impact on the structural stresses of a tower crane during telescoping work. Therefore, structural analysis was performed on the 290HC model, which is often used at construction sites and has only one cylinder installed. Moreover, two models were classified to determine the load acting on the connecting part of the telescopic cage to slewing platform and the cylinder. Five types of balance weight positions were applied at regular intervals from jibs; moreover, four types of wind load criteria were differently applied. Hence, the telescopic cage columns were destroyed at all balance weight positions at a wind speed of 30 m/s and only at certain locations at a wind speed of 20 m/s. Furthermore, failures occurred for cylinders, torsional, and bending at wind speeds of 30 m/s and 20 m/s, load imbalances above the allowable thresholds considering the safety factor. In addition, the load imbalance in the telescoping work also varied depending on the position of the balance weights. The results of these studies have validated that the current standards of adjusting the appropriate position of the balance weights on the jib are completely valid, with the telescoping work to be executed only at wind speeds of less than equal to 10 m/s.