• Title/Summary/Keyword: 콘크리트 펌프

Search Result 59, Processing Time 0.02 seconds

An Experimental Study on the Pumpability Considering an Effective Ratio of Concrete Delivery Cylinder in Stationary Concrete Pump. (고정식 콘크리트 펌프의 콘크리트 실린더 실효율을 고려한 펌프압송성에 관한 실험적 연구)

  • Kwon, Hae-Won;Bae, Yeoun-Ki;Lee, Jae-Sam;Kim, Seog-Il;Kim, Hyun-Seob;Lee, Jong-Seo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.149-150
    • /
    • 2009
  • The effective ratio of the concrete delivery cylinder has meaning which is important in the performance analysis of stationary concrete pump. But, from experiment or test of most it assumes the effective ratio of the concrete delivery cylinder simply to 90${\sim}$95% level and it is applying. It will follow hereupon and it will be able to grasp the performance of stationary concrete pump by mistake. So we confirm a discharge quantity per time consequently and with, accurately to measure the effective ratio of the concrete delivery cylinder there is a necessity which it will analyze. Experimental resultant existing presumed it apppeared with the fact that it is visible the low-end 70${\sim}$75% level which it sees.

  • PDF

Suggestion of a Model for Filling Coefficient of Hydraulic Cylinder in Concrete Pump (콘크리트펌프 유압실린더의 충진율 모델 제안)

  • Park, Chan-Kyu;Jang, Kyong-Pil;Jeong, Jae-Hong;Kwon, Seung-Hee
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.4 no.2
    • /
    • pp.195-202
    • /
    • 2016
  • In general, piston pumps are frequently used for concrete pumping. Filling coefficient signifies the ratio volume of a hydraulic cylinder to volume of concrete inside the cylinder. Therefore, it may be considered as a parameter directly affecting the flow rate and efficiency for concrete pumping. However, accurate analyses on this aspect have not yet been performed. In this paper, the data measured from horizontal pipeline pumping tests for 350m and 548m in length was analyzed to identify the relationships of rheological properties of concrete and stroke time with the filling coefficient. In addition, an equation allowing prediction of the filling coefficient from rheological properties of concrete and stroke time has been suggested.

A Study on Safety Accidents Caused by Pump Car Boom Defects (펌프카 Booms 결함으로 발생하는 안전사고 고찰)

  • Cho, Choon-Hwan
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.105-106
    • /
    • 2023
  • 본연구는 콘크리트 타설과정에서 반복되는 펌프카 사고를 예방하기 위해서 설계 및 제작의 품질관리와 현(現))정기검사 기준을 개선해야 한다는 점을 제안하며, Booms 파단 사고 예방대책 제시가 목적이고, 최근 1~2년 사이에 발생한 펌프카 기계적 결함 사고의 현황조사와 사고 특징을 분석하고, 펌프카 장비의 검사기준 및 조정원의 자격과 기능교육 기준 마련의 필요성 확인한다. 붐대의 안전성 확인하기 위해서는 선행연구의 구조적 안전성 평가와 최대응력 부위에 대한 선행연구의 유한요소 해석모델 자료를 재분석하고, 2단 붐이 타설중 가장 많은 힘을 받는지와 파괴 가능성을 확인한다. Booms의 유한요소 모델 해석 결과 펌프카는 타설 과정에서 진동으로 피로 하중을 받을 수 있다는 동적해석과 정적해석 재검토 결과 가장 취약한 부위는 2단 붐이었으며, 2st 붐은 제작단계에서 부재 두께를 증가시키고, 상단부에 철판 보강을 권장한다. 펌프카 사고를 방지하기 위해서는 제조사는 생산단계에서 2st Boom 상단에 보강판 부착이 필요하고, 정기검사 비용 현실화와 비파괴 검사를 의무 검사로 반영이 필요하다고 제언한다.

  • PDF

An Experimental Study on the Concrete Pumping Technology of High Performance Concrete for the High-Rise Building Construction (초고층 구조물 시공을 위한 고성능 콘크리트의 펌프압송 기술에 관한 실험적 연구)

  • Kim, Gyu-Dong;Han, Cheon-Goo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.375-381
    • /
    • 2015
  • In this study, high performance concrete of C60 and C80 were applied to a super tall building and those had satisfactory properties of fresh and hardened concrete to the requirements even changes according to time. Especially the evaluation and analysis of the relation of the rheological properties and puMPability of high performance concrete, C60-14 which was applied to the height of from 500m to 575m in the building, was carried out bymeasuring pumping pressure and pumping speed, testing concrete properties at before and after pumping. As results, themax. pumping pressure showed increase of 5% at every 25m higher pumping and the average pumping speed showed the above $25m^3$ per hour whichmeans proper productivity. Additionally it was verified that the loss of slump flow after pumping was increased according to plastic viscosity values and the increment of temperature through concrete pumping.

Development of a Concrete Pump Truck's Core Pump Model and Its Validation (콘크리트 펌프트럭의 코어펌프 해석모델개발 및 신뢰성 검토)

  • Park, Sung Su;Noh, Dae Kyung;Lee, Geun Ho;Lee, Dae Hee;Jang, Ju Sup
    • Journal of Drive and Control
    • /
    • v.15 no.2
    • /
    • pp.1-8
    • /
    • 2018
  • This study is a first step toward reducing surge pressure, and it has another purpose, which is to developing an analysis model which can closely analyze a hydraulic circuit and be used in design. For development of analysis model, SimulationX, a commercial program, is used. The study progress methods are as follows. By analyzing the structure and operating mechanisms of each part of the hydraulic system of the pump truck and referring its parameters, develop a single component model. Assemble the developed single component model, and make an overall analysis the model. By comparing the similarities between the developed model and the actual system's test results, validate the reliability of the analysis model.

Experimental Study on the Infilling Characteristics of CFT Column Infilled by Pumping-Up Below (하부압입공법에 의한 콘크리트 충전강관(CFT)기둥의 충전특성에 관한 실험적 연구)

  • Kim, Myoung Mo;Jeon, Sang Woo
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.2
    • /
    • pp.375-383
    • /
    • 2002
  • To evaluate the applicability of the construction method involving infilling CFT columns by pumping-up, a trial construction was done using 6 actual size test samples. The 12.8m-high test samples were similar to a four-story building scale. The pumping-up level was controlled at 12m. The test used two types of high performance concrete with $450kgf/cm^2$ standard design strength, and a concrete pump which is used domestically. The pressure changes in pipes or pump as well as the changes in concrete characteristics were measured during construction. in order to evaluate applicability. After the concrete hardened, the column was dismantled. The filled state of the concrete, concrete strength distribution according to column height, etc., were checked to evaluate the quality of the concrete, From the results, some basic data which characterize the pumping-up pressure were suggested. Also, the strength of hardened concrete as well as the filled state were proven to be acceptable ranges.