• Title/Summary/Keyword: 콘크리트궤도

Search Result 224, Processing Time 0.025 seconds

Development of Cost Estimate System of Construction Equipment through Analysing Its Domestic Rental Market (임대실태 분석을 통한 건설기계경비 산정시스템 개발)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Suh, Sang-Wook;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.121-132
    • /
    • 2012
  • The current estimation system of construction equipment cost was first introduced in 1960's when general contractors had ownership of equipment. However, most of construction equipment in construction sites has been rented from equipment leasing company these days. Therefore, the improvement of current cost estimation system is therefore inevitable in order to advance domestic construction industry. This study is aimed to suggest the improved system by analyzing nationwide market rental rates of major construction equipment. A user friendly prototype of actual database grounded on actual market rental rates collected from over 200 leasing companies in the nation was proposed. The database includes various rates and statistics analyzed by different form of contract as well as different region. Using the collected data, "The Cost Estimate System in Construction Equipment Database" was developed by using VBA(Visual Basic for Applications). The system makes users convenient to utilize the rental rates by choosing equipment and region, and various types of contract.

Study on the Levitation Stability of Maglev Vehicle considering the Vibration of Steel Switch Track (강재 분기기의 진동을 고려한 자기부상열차 부상안정성 연구)

  • Han, Jong-Boo;Park, Jinwoo;Han, Hyung-Suk;Lee, Jong-Min;Kim, Sung-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.175-185
    • /
    • 2015
  • Generally, in the train area, switch tracks have required high reliability because this system is directly associated with derailment. Especially, switch tracks of Maglev vehicles must be moved in terms of the whole geometric characteristics, in which the bogies are encased in the switch track. For this reason, switch track was constructed with steel lighter than concrete girders. But, the steel switch track was weak because of structural vibration as well as structural deformation. Therefore, it is important to predict the levitation stability when a vehicle passes over flexible switch track. The aims of this paper are to develop a coupled dynamic model to describe the relationship between a Maglev vehicle and switch track and to predict the levitation stability. In order to develop the coupled dynamic model, a three dimensional vehicle model was developed based on multibody dynamics; a switch model was made using the modal superposition method. And, the developed model was verified using comparison measured data.

Static and Dynamic Analysis for Railway Tunnel according to Filling Materials for overbroken tunnel bottom (철도터널 하부 여굴처리 방법에 대한 정적 및 동적 안정성 검토)

  • Seo, Jae-Won;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.668-682
    • /
    • 2017
  • Alignments of railways recently constructed in Korea have been straightened due to the advent of high-speed rail, which means increasing the numbers of tunnels and bridges. Overbreak during tunnel construction may be unavoidable, and is very influential on overall stability. Over-excavation in tunneling is also one of the most important factors in construction costs. Overbreak problems around crown areas have decreased with improvements of excavation methods, but overbreak problems around bottom areas have not decreased because those areas are not very influential on tunnel stability compared with crown areas. The filling costs of 10 cm thickness of overbreak at the bottom of a tunnel are covered under construction costs by Korea Railway Authority regulations, but filling costs for more than the covered thickness are considered losses of construction cost. The filling material for overbreak bottoms of tunnels should be concrete, but concrete and mixed granular materials with fractured rock are also used for some sites. Tunnels in which granular materials with fractured rock are used may have a discontinuous section under the concrete slab track. The discontinuous section influences the propagation of waves generated from train operation. When the bottom of a tunnel is filled with only concrete material, the bottom of the tunnel can be considered as a continuous section, in which the waves generated from a train may propagate without reflection waves. However, a discontinuous section filled with mixed granular materials may reflect waves, which can cause resonance of vibration. The filled materials and vibration propagation characteristics are studied in this research. Tunnel bottom filling materials that have ratios of granular material to concrete of 5.0 %, 11.5 %, and 18.0 % are investigated. Samples were made and tested to determine their material properties. Static numerical analyses were performed using the FEM program under train operation load; test results were found to satisfy the stability requirements. However, dynamic analysis results show that some mixed ratios may generate resonance vibration from train operation at certain speeds.

Behavior of Tension Clamp in Rail Fastening System (레일 체결장치 텐션클램프의 거동)

  • Choi, Shin-Hyung;Park, Beom-Ho;Yun, Kyung-Min;Bae, Hyun-Ung;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8812-8819
    • /
    • 2015
  • In a situation in which importance of rail fastening system is growing with increasing the construction of concrete track, an accident of tension clamp(the component of rail fastening system) breaking has been recently occurred. This results from various factors such as field condition, operating agency, running condition, traffic frequency and so on. Thus, the study for the behavior of tension clamp is required. In this paper, an experiment and finite element analysis(FEA) have been performed to analyse the mechanical behavior of tension clamp. The stress and displacement of tension clamp have been analyzed as the clamping force through a laboratory test, and they were compared with FEA results. Furthermore, the stress and displacement of the tension clamp are derived from train load condition applying the verified model, and the fatigue vulnerability of the tension clamp is identified through stress analysis.

A Study on Settlement Characteristics of Earthwork Subgrade with Lowering the Groundwater in High-speed Railway (지하수위 저하에 따른 고속철도 토공노반 침하특성에 관한 연구)

  • Kim, Young-Ha;Eum, Ki-Young;Han, Sang-Jae;Park, Yong-Gul;Jung, Jae-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.5
    • /
    • pp.67-74
    • /
    • 2015
  • Unlike the primary consolidation settlement, the settlement of ground water lowering is not considered separately because of relatively small residual settlement. But the allowed residual settlement (30 mm) of the concrete track in the high-speed railway may be exceeded due to unexpected excessive ground water lowering. This study analyzed the effect of the settlement according to the ground water level change using finite element analysis of stress-pore pressure coupling model, and compared the analysis results with the measured data. As a result, the range of elasticity modulus satisfying the allowable settlement was proposed, and it is suggested that settlement due to ground water level changes should be reflected in the design.

Evaluation of Train Running Safety for Direct Fixation Concrete Track on Light Rapid Transit (경전철 직결식 콘크리트 궤도구조의 열차주행안전성 평가)

  • Choi, Jung-Youl;Kim, Jun-Hyung;Chung, Jee-Seung;Lee, Sun-Gil
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.41-46
    • /
    • 2017
  • The coefficient of derailment and the rate of wheel load reduction were used as the index of train running safety that was directly affected the train derailment safety. In aspects of track, the train running safety depends on the complex interaction between wheel and rail, and the track-vehicle conditions (i.e., the curvature, cant, track system, vehicle speed and the operation conditions, etc). In this study, the relationship between the train running safety and the track curvature and vehicle speed for direct fixation concrete tracks currently employed in Korean light rapid transit was assessed by performing field tests using actual vehicles running along the service lines. The measured dynamic wheel load, lateral wheel load and lateral displacement of rail head were measured for same train running on four tested tracks under real conditions, which included curved and tangent tracks placed on the tunnel and bridge, thus increasing the train speed by approximately maximum design speed of each test site. Therefore, the measured dynamic track response was applied to the running safety analysis in order to evaluate the coefficient of derailment, the rate of wheel load reduction and the track gauge widening at each test site, and compare with the corresponding Korean train running safety standard. As the results, the lateral track response of direct fixation concrete track appeared to increase with the decreased track curvature; therefore, it was inferred that the track curvature directly affected the train running safety.

Evaluation of Dynamic Stability for Structural Bar Reinforced Precast and Prestressed Retaining Wall for Moving Train Load (이동열차하중에 대한 강봉으로 보강된 프리캐스트 프리스트레스트 옹벽의 동적 안정성 평가)

  • Lee, Il Wha;Um, Ju Hwan;Lee, Kang Myung;Keum, Chang Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.190-198
    • /
    • 2011
  • The precast production has many advantages by fast construction period, labor-saving and high quality. In recent years, the application of the precast product has been increased in the earth retaining wall field. This paper presents the results of the numerical analysis that was carried out to evaluate the dynamic stability of precast and prestressed earth retaining wall under moving train load. The two-dimensional FEM analysis was used to the numerical analyses. The train load to act on trackbed is combined by the real measured roughness phase angle and quasi-static load. The dynamic stability is analysed by the displacement, acceleration and stress under moving train load at each specified location. The results of the analysis show that the precast and prestressed retaining wall has very stable capability for the railway.

Numerical Evaluation of Settlement Reducing Effect by Partial Reinforcement of Rock Fill (수치해석을 통한 암성토 부분보강의 침하억제 효과 평가)

  • Lee, Su-Hyung;Choi, Yeong-Tae;Han, Jin-Gyu ;Gu, Kyo-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.23-31
    • /
    • 2023
  • The escalating settlements observed in concrete slab tracks pose a significant challenge in Korea, raising concerns about their adverse impact on the safe operation of high-speed railways and the substantial costs involved in restoration. A primary contributor to these settlements is identified as the utilization of rock materials sourced from tunnel construction, incorporated into the lower subgrade without the requisite soil mixing to achieve an appropriate particle size distribution. This study employs numerical analysis to evaluate the efficacy of partial reinforcement in reducing settlements in rock-filled lower subgrades. Column-shaped reinforcement areas strategically positioned at regular intervals in the lower subgrade induce soil arching in the upper subgrade, leading to a concentration of soil loads on the reinforced areas and consequent settlement reduction. The analysis employs finite element methods to investigate the influence of the size, stiffness, and spacing of the reinforced areas on settlement reduction in the lower subgrade. The numerical results guide the formulation of an optimal design approach, proposing a method to determine the minimum spacing required for reinforcements to effectively limit settlements within acceptable bounds. This research contributes valuable insights into addressing the challenges associated with settlement in concrete slab tracks, offering a basis for informed decision-making in railway infrastructure management.

Study on The Modification of The Transition Curve to Increase Operating Speed of Existing Line (기존선 속도 향상을 위한 완화곡선 변경 방안 연구)

  • Kim, Jae-Bok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.26-32
    • /
    • 2019
  • The purpose of this study is to improve the running speed on a small-radius curved section on an existing train line. When the transition curve was extended, and the amount of movement in the horizontal direction tended to increase as the curve radius increased. The amount of increase in the transition curve extension was lowest when extending the curve radius, and the amount of horizontal movement was the lowest when changing the curve radius to a cosinusoidal curve. As a result of applying the pass rate after improvement to the Kyeongbu line, there was a time-shortening effect of 9.4 to 11.6% and a facial expression speed increasing effect when the curve radius was fixed and the transition curve was changed to a sinusoidal curve. In conclusion, the most effective way to improve the running speed on an existing train route is to change the image to concrete and to change the relaxation curve to a cosinusoidal curve. The amount of horizontal movement of the track is small, and the speed improvement effect is excellent.

Analysis of Ultimate Rockfall Energy Resistance of CFT Rock Shed Main Frame (CFT 피암터널 주구조체의 극한 낙석에너지 저항능력 분석)

  • Moon, Jiho;Lee, Juho;Song, Jong-Keol
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.3
    • /
    • pp.129-135
    • /
    • 2021
  • Rock sheds are a type of rockfall protection facility that is installed on the road near steep slopes, where large amount of rockfall is expected. Rock sheds are generally designed to resist approximately 200 kJ to 3,000 kJ of rockfall energy. In a previous study, a new type rock shed structure having a concrete-filled tube (CFT) main frame was proposed. By using CFT as the main frame in a rock shed, rapid construction is possible. Additionally, high load carrying capacity and ductility can be achieved. The behavior of the proposed rock shed structure was studied via elastic analysis with the equivalent static load of rockfall energy as in a previous study. However, it is necessary to investigate the behavior of the proposed rock shed in more detail with a full 3D finite element (FE) model considering realistic rockfall load. The FE model for the CFT rock shed main frame was developed first in this study. Then, the resistance of the CFT rock shed main frame Under ultimate rockfall energy was investigated.